|
| ||||||||||||||||||||





Park Tavern - This casual restaurant in the pavilion on the south block of Canal Park near M Street is aiming to be the city's first LEED Gold restaurant, thanks to a green roof, solar panels, and the various stormwater management aspects built into the park itself. And:
Willie's Brew and Que - A few blocks to the south, Cervera is waiting for Forest City to finish construction on the Boilermaker Shops renovation so that he (and other tenants) can then begin their build-outs. It will occupy the western end of the building, at 3rd Street (seen at right), where the full two-story space to the roof will be open. Details:|
Comments (8)
More posts:
Boilermaker Shops/Yards, Canal Park, Restaurants/Nightlife, parktavern, Retail, willies, The Yards
|
Residents at three of the neighborhood's "new" apartment buildings--the Jefferson and Axiom at 70 and 100 I Street, and the 909 New Jersey Avenue building, branded together as "Capitol Yards"--are reporting the posting today of public notices, along with e-mails from management, announcing that the buildings are under contract to be sold.
That paperwork says that the price of 100 I for any tenant organization that may form to purchase the 246-unit building would be $93,879,000; readers report that the number for 70 I (448 units) is about $165 million, and 909's price (237 units) is around $95 million, which presumably are all somewhere in the neighborhood of the contract sales prices.|
Comments (9)
|
Also, because I can't walk past the Boilermaker Shops without taking pictures, I added a few new shots to that page, including the panorama at right that I got from one of the Foundry Loft patios.|
Comments (1)
|
|
Comments (0)
|
There hasn't been much said so far about the restaurant planned for the Boilermaker Shops at the Yards by the Birch and Barley/Churchkey team, but the Post's All We Can Eat blog posted some morsels today:|
Comments (3)
|
This is little more than an off-topic I-want-to-try-it exercise, but after reading JD Antos's latest crunching of the Capital Bikeshare trip data that came out last week, I decided to see what it would be like to map the movements of a particular bike. |
Comments (1)
More posts:
Pedestrian/Cycling Issues
|
|
Comments (1)
|
From ground level, it's not especially easy to see (or photograph) the current state of Canal Park's construction--lots of fences, equipment, and bad winter sunlight, and the only above-ground action is hard to photograph through cyclone fencing. But on Thursday I got to see the progress from higher up, where not only is it easier to get a good overview of the site, but you can now see the outline on the southern block of both the plaza *and the ice rink*. (Shadows still wreaked some havoc, alas.) I added a number of these images to my Canal Park progress page, for your perusal.

* A series of strangely blue pictures I took from the roof deck at Onyx in October 2008, just as the building was opening;|
Comments (0)
More posts:
Canal Park, photos
|
While there has been lots of news over the past few months about Near Southeast getting some of the amenities that it has lacked for a long time (restaurants, grocery), one service that the neighborhood continues to be without is an open elementary school within walking distance. DC Public Schools closed Van Ness Elementary at 5th and M SE back in 2006 because of a lack of school-aged children in the neighborhood thanks to the emptying of the Capper/Carrollsburg public housing project in advance of its reconstruction as Capitol Quarter, but kept the building in its inventory knowing that eventually the neighborhood would fill back up and a school would again be needed.|
Comments (0)
More posts:
Van Ness Elementary
|

Uh oh, the old bat is bringing out the photo albums....|
Comments (5)
More posts:
JDLand stuff
|
|
Comments (2)
|
When word gets out that some new data set has been posted in an easily digestible format, I am pretty much helpless before its power. So I spent the Friday night of a holiday weekend knee deep in Bikeshare Trip History Data, culling out the |
Comments (4)
More posts:
Pedestrian/Cycling Issues, JDLand stuff
|
There were 15 properties that received reductions for their 2012 bills, totaling about $148 million. The big property owners managed a few hefty cuts, with JBG's US Department of Transportation building leading the way with a $47.7 million reduction to just under $615 million, followed by CSX's empty lots near the freeway north of I Street getting a $46.3 million haircut down to $66.2 million. Many of the other shiny new-ish buildings of the neighborhood also got their tallies reduced, such as apartment buildings 70/100 I and 909 New Jersey and office buildings 20 M, 55 M, 225 Virginia, and Maritime Plaza I and II. |
Comments (0)
More posts:
assessments
|
Developer William C. Smith is announcing today that the apartment project we've been referring to as 880 New Jersey will be called the Park Chelsea, and is expected to get underway sometime during the second quarter of this year. And there's even a rendering now, and an official web site.
Once started, construction should take about two years.|
Comments (9)
|
The meeting probably isn't even finished yet, but if you didn't (or did) stop by the first of DDOT's public meetings on their nine-month M Street SE/SW Transportation study, you can browse the presentation slides and take the stakeholder survey, already posted on the new web site for the project.|
Comments (2)
|

|
Comments (0)
|

|
Comments (0)
More posts:
Boilermaker Shops/Yards, Restaurants/Nightlife, Foundry Lofts/Yards, photos, Retail, The Yards
|
The news of the two freeway spans of the 11th Street Bridges opening over the past few weeks is of course the most interesting part of the current state of the project's construction, but there's plenty of work still happening on the Near Southeast side of the Anacostia River, from the new "11th Street Local" bridge that will open this summer (seen at right) to various other new ramps and flyovers.
icon.)|
Comments (0)
More posts:
11th Street Bridges, photos
|
Back in February, the National Community Church applied for a raze permit for the Miles Glass site on the southwest corner of 8th and Virginia that it acquired along with a number of adjoining lots on Square 906 in 2010 and 2011. However, perhaps something was not quite right, because two new raze permit applications for 733 Virginia are now in the city's database, along with a separate new one for the car garage next door at 701 Virginia, the lot that finalized NCC's footprint.|
Comments (0)
|

|
Comments (0)
|


























