Since January, 2003

Advertise on JDLand
 (a random before-and-after moment)
April 23, 2004
May 2, 2013
2nd (East) at I, Looking East-Southeast (see more)

I almost can't bring myself to write the words, but the owners of the Florida Rock site just south of Nationals Park have filed with the Zoning Commission for not only the previously reported plan to change the planned first phase office building to a residential one, but also to revisit parts of the site plan for the three subsequent phases. (For those of you versed in zoning speak, they are requesting to "revert Phases II, III, and IV to First Stage Approvals with modifications.")
This is going to be a lengthy process, with hearings at the Zoning Commission, reports from the Office of Planning and others, and presentations to the ANC (starting with one this coming Monday night, Dec. 12). So I'm going to avoid getting into the weeds too much too early, and will just give some bullet points of what changes they are looking for. (You're free to read these 57 pages of the filing for more detail.)
* The new Phase 1 building, at the far east end of the site (next to Diamond Teague Park) will now be the aforementioned residential building, a nine-story U-shaped design oriented toward the river with 300-350 units and 286 below-grade parking spaces. There will still be 12,500 square feet of retail, though they are asking that 7,000 of it be "flex space" that "may alternatively be dedicated to residential amenity space" until retail gets going. There will be a private courtyard within the "U", but there will also be the open space on the buildings' east side, now dubbed Anacostia Plaza, that will be open enough to maintain open views from First Street and the stadium's Grand Staircase to the river but will also provide "passive recreation space."
* The esplanade that has always been such a big part of the site plan remains, acting as the portion of the Anacostia Riverwalk Trail connecting South Capitol Street to Teague Park, the new pedestrian bridge, and the Yards Park. The Esplanade will "relate" to the "design vernacular" of the newly constructed boardwalks, and will also have a lot of stormwater management and bio-filtration offerings.
* On the building's west side will be the "Mews," which they call a pedestrian boulevard separating the Phase 1 building from the planned Phase 2 residential building. This path will also provide access to parking and loading for the first two phases, but "a dynamic paving design . . . will help distinguish this area as an urban space that privileges pedestrians over vehicles."
* The filing says they anticipate construction to begin in the second quarter of 2013, with first move-ins in early 2015 and the entire phase completed by summer 2015.
As for overall changes, here's what seem to be the most interesting changes from the previously approved design that the developers are looking for:
* The new plan would bring 1,164,640 square feet of gross floor area (4.6 FAR), up from 1,115,400 sq ft/4.4 FAR in the last plan. The other three phases' uses would remain unchanged (residential, office, hotel).
* Building heights of 130 feet for Phase 2-4 are being requested, compared to 130/112/130 last time around.
* Below-grade parking spaces would go from 1,010 to 1,144.
Plus, though It's hard to tell from one small site plan concept drawing, a lot of the public space design, especially to the east of the Phase 3 and 4 buildings, looks scaled back from the 2008 design. (UPDATE: Here's a graphic put together from another part of the filing that compares the 2008 site plan with the current one.)
The filing also says that "the Applicant would like the flexibility to provide interim uses on Phases, II, III, IV so that the site will not simply lay dormant pending construction," and lists a park, a farmers market, or other "simple, temporary retail uses" as examples.
And, just as in the previous plans, development of phases 3 and 4 are completely dependent on the construction of a new South Capitol Street Bridge, since the current bridge bisects the property where those buildings are planned.
Again, this is early in this new process, and there will be plenty of filings and presentations to come for all the additional detail you're going to be clamoring for. For now, the takeaway is that FRP/MRP want to get started on a residential building at 1st and Potomac in the spring of 2013, and still want to move forward on the rest of the site with a design similar to what was approved 3 1/2 years ago, but with some modifications.
This project first began its zoning quest in 1998, and went through a four-year process ending in 2008 to get its second-stage approvals. I should also note that Davis Buckley Architects, who worked on the project throughout that 10-year ordeal, is no longer part of the design team; SK&I is now on board, with Oculus as the landscape design firm. The site's owners, FRP Development/Florida Rock Properties, announced their partnership with MRP Realty earlier this year.
(As for the concrete plant currently on site, I haven't looked lately, but demolition is underway, and the filing says it should be done by the end of the year. Tom Boswell's heart will be broken.)
UPDATE, 1/3: Just before Christmas, demolition was finished on the plant, making it #166 in my Demolished Buildings Gallery.
Comments (3)
   
 
 More About Florida Rock
 All posts: Florida Rock, zoning

JDLand.com Home

Comments

lester says: (12/9/11 3:15 PM)
130 feet tall? That's curious.

The area is zoned W-2, which would traditionally allow for up to 60 feet. It's part of the capital gateway overlay, which is designed "to reduce the height and bulk of buildings along the Anacostia riverfront."

Then DC goes ahead and approved (previously) 130/112/130 foot tall buildings (Phase II, III, and IV, not sure what Phase I will be). Wow. The wonders of the PUD (which basically nullifies the W-2 and CG designation).

However, moving past these decisions, how on earth do they justify 130 feet with respect to the Heights of Building Act of 1910? To allow a 130 foot tall building, you would need to have either South Capitol or Potomac be 110' wide, and as best as I can estimate from the DC property records web site, they are at most 90' wide. What gives?

Either way, it seems silly to develop an overlay to reduce height and bulk near the Anacostia riverfront, and then approve four buildings on the waterfront 100+ feet high...

Mind you, from where I live, the buildings won't really impact my view at all, I just find it all very... strange.


JD says: (12/9/11 3:22 PM)
Phase I was originally approved at 92 feet; they're requesting 95 feet this time.

There's a fair amount of discussion of the zoning starting around page 11 in the document I link to above, which says that CG/W-2 (the Capitol Gateway overlay) allows for max heights of 130 ft in mixed-use developments. (Purely commercial buildings can only be 60 feet high; the CG overlay gives the opportunity for increased density by developing mixed-use.)

Here's the Capitol Gateway Overlay, if you want to read: link




IMGoph says: (12/17/11 12:17 AM)
I like the fact that the building footprints aren't curvy like the Watergate anymore. That footprint just felt contrived.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2015!
 Top News
  
conngs0 on Scarlet Oak Opening: Fantastic! Looking forward to reading some reviews and trying it out myself. G...
adamdonovan on Scarlet Oak Close: Please oh please let the new coffee shop be Peregrine!
JD on Las Placitas Moving: And it looks like Scarlet Oak is opening on Saturday at 4 pm.
coffeexdrinker on Las Placitas Moving: This is fantastic news! Been so sad to see that space not get utilized for so lo...



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2 (Theft F/Building)
 07/29/15
400 B/O M ST SE   THEFT
Theft 1 (Theft F/Building)
 07/28/15
1200 B/O 1ST ST SE   THEFT
Theft 2 (Theft F/Building)
 07/25/15
700 B/O L ST SE   ROBBERY
Robbery Snatch Or Pursesnatch
 07/23/15
1000 B/O HALF ST SE   THEFT
2nd Degree
 07/13/15
400 B/O M ST SE   THEFT
Theft 2 (Theft F/Building)
 07/09/15
70 B/O I ST SE   THEFT F/AUTO
Theft From Auto 1
 07/08/15
100 B/O M ST SE   THEFT
2nd Degree
 07/07/15
300 B/O L ST SE   THEFT
2nd Degree
 07/07/15
70 B/O I ST SE   THEFT
Theft 2 (Theft F/Building)
 07/06/15
300 B/O TINGEY ST SE   THEFT
 07/05/15
1200 B/O HALF ST SE   THEFT
 07/03/15
900 B/O M ST SE   THEFT
 07/02/15

Recent Issued Building Permits Archive  
1200 1ST ST SE   
07/16/15 
FOREST CITY WASHINGTON / W. TEASS / P.NETTELBECK / TEASS/ WA; RAMSEY MEISER
BCIV1500036 / CONSTRUCTION
CONSTRUCTION OF A TEMPORARY PARKING LOT OPEN PARK SPACE. ALL WORK TO BE PERFOMED IN PRIVATE PROPERTY.
   
07/21/15 
DISTRICT OF COLUMBIA / MARK EY FUHRMAN
E1507720 / SUPPLEMENTAL
1233 1ST ST SE   
07/14/15 
BALLPARK HOTEL LLC BALLPARK HOTEL LLC / MICHAEL GROSE; BALLPARK HOTEL BALLPARK HOTEL LLC; MITCH PERMUY
E45868221 / SUPPLEMENTAL
1277 1ST ST SE   
07/14/15 
BALLPARK RESIDENTIAL LLC BALLPARK RESIDENTIAL LLC / MICHAEL GROSE; BALLPARK RESIDE BALLPARK RESIDENTIAL LLC; MITCH PERMUY
E26661076 / SUPPLEMENTAL
1331 2ND ST SE   
07/17/15 
CORMAN CONSTRUCTION / PAMELA STRICKLAND
SH1500057 / CONSTRUCTION
SUPPORT OF EXCAVATION FOR DC WATER OWNED SEWER STRUCTURE CSO 009 / 011A
1016 3RD ST SE   
07/15/15 
CARLOS DIAZ / JOSEPH SEMPER; CARLOS DIAZ; JOSEPH SEMPER
E78706918 / SUPPLEMENTAL
   
07/23/15 
ROBIN SANTILLAN / ROBIN SANTILLAN; ROBIN SANTILLAN; CARLOS MONTES
P55998454 / SUPPLEMENTAL
   
07/31/15 
ANAMARIA R MOTTOLA / DONALD V. ELLENBERGER
M1502813 / SUPPLEMENTAL
1331 4TH ST SE   
07/13/15 
FC 1331 LLC / OTIS ELEVATOR COMPANY
EN1501337 / SHOP DRAWING
TYPE OF ELEVATOR : ONE (1) TRACTION / STEEL / CENTRAL / VERTICAL TRANSPOTATION LICENSE NUMBER : ELC1300386 ISSUE DATE : 08 / 04 / 2014 EXPIRATION DATE 11-30-2015
   
07/13/15 
FC 1331 LLC / OTIS ELEVATOR COMPANY
EN1501334 / SHOP DRAWING
TYPE OF ELEVATOR : TWO (2) TRACTION / STEEL / CENTRAL / VERTICAL TRANSPOTATION LICENSE NUMBER : ELC1300386 ISSUE DATE : 08 / 04 / 2014 EXPIRATION DATE 11-30-2015
913 5TH ST SE   
07/13/15 
MARGARET LITTLEJOHN
B1509950 / CONSTRUCTION
TUCKPOINTING. SCAFFOLDING TO BE ERECTED.
1000 5TH ST SE   
07/16/15 
DISTRICT OF COLUMBIA / MAURY M. PARKER
M1502393 / SUPPLEMENTAL
   
07/23/15 
DISTRICT OF COLUMBIA / WALTER T JONES
E1507778 / SUPPLEMENTAL
   
07/29/15 
N/A DC HOUSING
B1510526 / CONSTRUCTION
INSTALLATION OF NEW FIRE ALARM SYSTEM FOR ARTHUR CAPPER COMMUNITY CENTER
1007 8TH ST SE   
07/23/15 
CALLE OCHO LLC / JERONE SCOTT
P1507675 / SUPPLEMENTAL
901 HALF ST SE   
07/21/15 
BAKER DCLLC / CHRISTINE LONG
AH1500614 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 3AM THRU 9PM
1201 HALF ST SE   
07/27/15 
WEST HALF RESIDENTIAL II LLC / ECS MID-ATLANTIC LLC C/O DON SESER
SB1500398 / CONSTRUCTION
WE WILL PERFORM A TOTAL OF THREE SOIL BORINGS ON THE PROPOSED SITE. THE BORINGS WILL BE ADVANCED TO A DEPTH OF 60 TO 100 FEET BELOW EXISTING SITE GRADES AND WILL BE LOCATED WITHIN THE BOUNDS OF THE PRIVATE PROPERTY. THE BORINGS WILL BE DRILLED UTILIZING 3.25-INCH HOLLOW STEM CONTINUOUS FLIGHT AUGERS. THE BORINGS WILL BE PERFORMED UTILIZING AN ATV-MOUNTED DRILL RIG AND WILL GENERATE AN APPROXIMATE ...
1220 HALF ST SE   
07/13/15 
BUFFALO WILD WINGS / ALLIIANCE
TL1500106 / CONSTRUCTION
TENANT LAYOUT FOR A NEW RESTAURANT IN EXISTING BUILDING. THIS SPACE HAS NOT BEEN PREVIOUSLY OCCUPIED. WORK INCLUDES NEW EXTERIOR FINISHES SIDEWALK CAF? PLUMBING ELECTRICAL AND MECHANICAL AS WELL AS INTERIOR WORK. THIRD PARTY REVIEW.
   
07/31/15 
BUFFALO WILD WINGS / DANIEL RUDE; BUFFALO WILD WINGS; DANIEL RUDE
P66073039 / SUPPLEMENTAL
   
07/31/15 
BUFFALO WILD WINGS / DANIEL RUDE; BUFFALO WILD WINGS; DANIEL RUDE
G33633628 / SUPPLEMENTAL
55 K ST SE   
07/30/15 
BAKER DC LLC / CHRISTINE LONG
AH1500643 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 12:01AM SATURDAY THRU 11:59PM SUNDAY
601 L ST SE   
07/15/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / EDUARDO L. LOPEZ
E1507545 / SUPPLEMENTAL
55 M ST SE   
07/15/15 
HINES GLOBAL REIT 55 M STREET LLC / CARL J. SMITH
E1507529 / SUPPLEMENTAL
   
07/27/15 
HINES GLOBAL REIT 55 M STREET LLC / ANTHONY G SAMBURG
E1507875 / SUPPLEMENTAL
99 M ST SE   
07/15/15 
BALLPARK SQUARE 701 LLC / LP CONSULTING SERVICES
SH1400072 / CONSTRUCTION
SHEETING AND SHORING AS PER PLANS FOR NEW OFFICE BUILDING
   
07/15/15 
BALLPARK SQUARE 701 LLC / LP CONSULTING SERVICES
FD1500019 / CONSTRUCTION
FOUNDATION TO GRADE IN PREPARATION FOR CONSTRUCTION OF A NEW MIXED USE BUILDING
100 M ST SE   
07/21/15 
SQUARE 743 INC / JOSE UMANZOR-ALVAREZ; SQUARE 743 INC; ROBERT LAWALL
E99685352 / SUPPLEMENTAL
   
07/21/15 
UNKNOWN UNKNOWN / PATRICK BARRON; UNKNOWN UNKNOWN; ROBIN MALLEY
E65875186 / SUPPLEMENTAL
400 M ST SE   
07/23/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY (LAND) / VERNON A. MONTAGUE
P1507715 / SUPPLEMENTAL
74 N ST SE   
07/23/15 
CAPITOL RIVERFRONT HOTEL LLC / DAVID FONTANA MCKEEVER SERVICES CORP
B1403426 / CONSTRUCTION
CONCRETE PAVEMENT ENTIRELY ON PRIVATE PROPERTY FOR CONSTRUCTION ACCESS TO NEIGHBORING PROPERTY 1265 1ST ST SE.
800 NEW JERSEY AVE SE   
07/29/15 
BAKER DC LLC / BAKER DC LLC; CHRISTINE LONG
AH1500569 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 7PM THRU 7AM MONDAY THRU SUNDAY
909 NEW JERSEY AVE SE   
07/17/15 
SCARLET OAK / EVAN O'BRIEN/ D MCKEEVER SERVICES
B1507594 / CONSTRUCTION
TPR. REVISION TO EXISTING PERMIT # TL1500002. VALUE ENGINEERING RESULTING IN CHANGES TO MPE SYSTEMS AND MECHANICAL STRUCTURAL SUPPORT.
1111 NEW JERSEY AVE SE   
07/16/15 
GALLERY CAPITAL PROP LLC GALLERY CAPITAL PROP LLC / DONALD LAYTON; GALLERY CAPITAL GALLERY CAPITAL PROP LLC; TOM MCGUIRE
E77440335 / SUPPLEMENTAL
   
07/29/15 
GREGORY R. GOSNELL
P1507817 / SUPPLEMENTAL
1500 SOUTH CAPITOL ST SE   
07/15/15 
NONE / JAMES W CONNER
E1507526 / SUPPLEMENTAL
   
07/23/15 
LERNER DC
B1510545 / CONSTRUCTION
REVISION TO PERMIT NUMBER #B1506810 TO ADD EXHAUST HOOD.
   
07/28/15 
LERNER MANAGEMENT / GERARD MULLEN; LERNER MANAGEMENT; SCOTT BROADBENT
E69613955 / SUPPLEMENTAL
   
07/28/15 
NATIONALS PARK / GERARD MULLEN; NATIONALS PARK; SCOTT BROADBENT
E91113810 / SUPPLEMENTAL
301 TINGEY ST SE   
07/29/15 
NA NA NA
EHOP1590795 / HOME OCCUPATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




     © Copyright 2015 JD.