Since January, 2003
            
 (a random before-and-after moment)
May 19, 2006
June 9, 2016
3rd at Virginia, Looking South (see more)

I almost can't bring myself to write the words, but the owners of the Florida Rock site just south of Nationals Park have filed with the Zoning Commission for not only the previously reported plan to change the planned first phase office building to a residential one, but also to revisit parts of the site plan for the three subsequent phases. (For those of you versed in zoning speak, they are requesting to "revert Phases II, III, and IV to First Stage Approvals with modifications.")
This is going to be a lengthy process, with hearings at the Zoning Commission, reports from the Office of Planning and others, and presentations to the ANC (starting with one this coming Monday night, Dec. 12). So I'm going to avoid getting into the weeds too much too early, and will just give some bullet points of what changes they are looking for. (You're free to read these 57 pages of the filing for more detail.)
* The new Phase 1 building, at the far east end of the site (next to Diamond Teague Park) will now be the aforementioned residential building, a nine-story U-shaped design oriented toward the river with 300-350 units and 286 below-grade parking spaces. There will still be 12,500 square feet of retail, though they are asking that 7,000 of it be "flex space" that "may alternatively be dedicated to residential amenity space" until retail gets going. There will be a private courtyard within the "U", but there will also be the open space on the buildings' east side, now dubbed Anacostia Plaza, that will be open enough to maintain open views from First Street and the stadium's Grand Staircase to the river but will also provide "passive recreation space."
* The esplanade that has always been such a big part of the site plan remains, acting as the portion of the Anacostia Riverwalk Trail connecting South Capitol Street to Teague Park, the new pedestrian bridge, and the Yards Park. The Esplanade will "relate" to the "design vernacular" of the newly constructed boardwalks, and will also have a lot of stormwater management and bio-filtration offerings.
* On the building's west side will be the "Mews," which they call a pedestrian boulevard separating the Phase 1 building from the planned Phase 2 residential building. This path will also provide access to parking and loading for the first two phases, but "a dynamic paving design . . . will help distinguish this area as an urban space that privileges pedestrians over vehicles."
* The filing says they anticipate construction to begin in the second quarter of 2013, with first move-ins in early 2015 and the entire phase completed by summer 2015.
As for overall changes, here's what seem to be the most interesting changes from the previously approved design that the developers are looking for:
* The new plan would bring 1,164,640 square feet of gross floor area (4.6 FAR), up from 1,115,400 sq ft/4.4 FAR in the last plan. The other three phases' uses would remain unchanged (residential, office, hotel).
* Building heights of 130 feet for Phase 2-4 are being requested, compared to 130/112/130 last time around.
* Below-grade parking spaces would go from 1,010 to 1,144.
Plus, though It's hard to tell from one small site plan concept drawing, a lot of the public space design, especially to the east of the Phase 3 and 4 buildings, looks scaled back from the 2008 design. (UPDATE: Here's a graphic put together from another part of the filing that compares the 2008 site plan with the current one.)
The filing also says that "the Applicant would like the flexibility to provide interim uses on Phases, II, III, IV so that the site will not simply lay dormant pending construction," and lists a park, a farmers market, or other "simple, temporary retail uses" as examples.
And, just as in the previous plans, development of phases 3 and 4 are completely dependent on the construction of a new South Capitol Street Bridge, since the current bridge bisects the property where those buildings are planned.
Again, this is early in this new process, and there will be plenty of filings and presentations to come for all the additional detail you're going to be clamoring for. For now, the takeaway is that FRP/MRP want to get started on a residential building at 1st and Potomac in the spring of 2013, and still want to move forward on the rest of the site with a design similar to what was approved 3 1/2 years ago, but with some modifications.
This project first began its zoning quest in 1998, and went through a four-year process ending in 2008 to get its second-stage approvals. I should also note that Davis Buckley Architects, who worked on the project throughout that 10-year ordeal, is no longer part of the design team; SK&I is now on board, with Oculus as the landscape design firm. The site's owners, FRP Development/Florida Rock Properties, announced their partnership with MRP Realty earlier this year.
(As for the concrete plant currently on site, I haven't looked lately, but demolition is underway, and the filing says it should be done by the end of the year. Tom Boswell's heart will be broken.)
UPDATE, 1/3: Just before Christmas, demolition was finished on the plant, making it #166 in my Demolished Buildings Gallery.
Comments (3)
   
 
 More About Florida Rock
 All posts: Florida Rock, zoning

JDLand.com Home

Comments

lester says: (12/9/11 3:15 PM)
130 feet tall? That's curious.

The area is zoned W-2, which would traditionally allow for up to 60 feet. It's part of the capital gateway overlay, which is designed "to reduce the height and bulk of buildings along the Anacostia riverfront."

Then DC goes ahead and approved (previously) 130/112/130 foot tall buildings (Phase II, III, and IV, not sure what Phase I will be). Wow. The wonders of the PUD (which basically nullifies the W-2 and CG designation).

However, moving past these decisions, how on earth do they justify 130 feet with respect to the Heights of Building Act of 1910? To allow a 130 foot tall building, you would need to have either South Capitol or Potomac be 110' wide, and as best as I can estimate from the DC property records web site, they are at most 90' wide. What gives?

Either way, it seems silly to develop an overlay to reduce height and bulk near the Anacostia riverfront, and then approve four buildings on the waterfront 100+ feet high...

Mind you, from where I live, the buildings won't really impact my view at all, I just find it all very... strange.


JD says: (12/9/11 3:22 PM)
Phase I was originally approved at 92 feet; they're requesting 95 feet this time.

There's a fair amount of discussion of the zoning starting around page 11 in the document I link to above, which says that CG/W-2 (the Capitol Gateway overlay) allows for max heights of 130 ft in mixed-use developments. (Purely commercial buildings can only be 60 feet high; the CG overlay gives the opportunity for increased density by developing mixed-use.)

Here's the Capitol Gateway Overlay, if you want to read: link




IMGoph says: (12/17/11 12:17 AM)
I like the fact that the building footprints aren't curvy like the Watergate anymore. That footprint just felt contrived.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News
  
Get JDLand Updates In Your Inbox!

walt on Temporary Closure of: I think this neighborhood is really well-situated with numerous access points to...
dude on Temporary Closure of: Thanks for the heads up on this. I know a lot of people think CSX is the devil,...
JES on Project Updates: While I'd absolutely prefer Lucky Strike, why all the D&B hate? That's an id...
Shogungts on Project Updates: @JD - thanks for responding. That makes sense and thanks for the link!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/25/16
1200 B/O HALF ST SE   BURGLARY
Burglary Two
 07/24/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/23/16
900 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/23/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/22/16
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 07/20/16
900 B/O 4TH ST SE   ROBBERY  07/20/16
500 B/O L ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/19/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (theft From Building)
 07/19/16
1000 B/O NEW JERSEY AVE SE   BURGLARY
Burglary One
 07/15/16
300 B/O L ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/15/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 07/14/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 07/13/16
1000 B/O 8TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny) - Highway/ Road/ Alley/ Street/ Sidewalk
 07/12/16
1000 B/O 3RD ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/10/16
1230 SOUTH CAPITOL ST SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 07/09/16
900 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 07/06/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 07/06/16
900 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/06/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 07/05/16
900 B/O 4TH ST SE   ROBBERY  07/04/16
1000 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/02/16
1100 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/01/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/29/16
400 B/O I ST SE   ROBBERY  06/28/16

Recent Issued Building Permits Archive  
1331 2ND ST SE   
07/18/16 
DC WATER
AH1600880 / CONSTRUCTION
After Hours work for structure excavation and support for B1605659 DC Water, Corman Construction 202863-0052
1220 12TH ST SE   
07/22/16 
COPT COPT / COPT COPT; STEPHEN PALMER ELE
SG1600378 / CONSTRUCTION
Install 1 Illuminated wall sign - BAE Systems
1210 HALF ST SE   
07/08/16 
HINES GLOBAL REIT 55 M STREET LLC / KOSTAS RIKOS
M1602654 / SUPPLEMENTAL
   
07/09/16 
HINES GLOBAL / ALAN CARTER; HINES GLOBAL; ALAN CARTER
E91123768 / SUPPLEMENTAL
   
07/26/16 
HINES GLOBAL REIT 55 M STREET LLC / NA HINES GLOBAL REIT 55 M STREET LLC; STUART
SG1600386 / CONSTRUCTION
Two exterior lighted signs to be installed on front of retail space. One single faced oval 60 inches wide x 33 inches High and One Vertical 7 ft double faced lighted sign
80 M ST SE   
07/22/16 
WELLS REIT II 80 M STREET LLC / WELLS REIT II 80 M STREET LLC; JOHN GIUSEPPE-RAMCO
D1600714 / CONSTRUCTION
INTERIOR DEMOLITION TO 1ST, 2ND AND 3RD FLOOR OFFICE SPACE COLUMBIA PROPERTY TRUST AS SHOWN ON THE ELECTRONICALLY SUBMITTED ARCHITECTURAL DEMOLITION PLANS. NO STRUCTURAL WORK INVOLVED. NO CHANGE IN USE. INTERIOR WORK ONLY. 66,684SF
515 M ST SE   
07/14/16 
FOREST CITY / FOREST CITY; KILLETTE AND ASSOC
B1610381 / CONSTRUCTION
REMOVE 2 NON LOAD BEARING PARTITIONS TO CREATE OPEN SPACE AND REPLACE EXISTING DOORS WITH NEW GLASS DOORS IN KIND.
1111 NEW JERSEY AVE SE   
07/19/16 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE
E1608268 / SUPPLEMENTAL
25 POTOMAC AVE SE   
07/08/16 
MRP RESIDENTIAL / JASON OLYMPIA SWIMMING POOL CO., INC.
SP1600008 / CONSTRUCTION
838 s.f. swimming pool inside existing concrete sub-structure of 9 story building. building permit B1408697. This Permit submission for pool construction only. All MEP work for pool equipment, Architectural work, and Structural work of the building slabs to be completed per approved building permit previously mentioned.
1244 SOUTH CAPITOL ST SE   
07/14/16 
1244 SOUTH CAPITOL RESIDENTIAL, L.L.C. / GLENNWOOD ROGERS
P1607382 / SUPPLEMENTAL
355 WATER ST SE   
07/08/16 
JANET WAEMA AMERICAN KIDNEY FUND
TN1600173 / CONSTRUCTION
SPECIAL EVENT KIDNEY ACTION DAY 2 20X40 TENTS 1 14 X 24 STAGE
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.