Since January, 2003

Advertise on JDLand
 (a random before-and-after moment)
November 15, 2008
May 2, 2013
2nd (West) at Virginia, Looking East-Southeast (see more)

I almost can't bring myself to write the words, but the owners of the Florida Rock site just south of Nationals Park have filed with the Zoning Commission for not only the previously reported plan to change the planned first phase office building to a residential one, but also to revisit parts of the site plan for the three subsequent phases. (For those of you versed in zoning speak, they are requesting to "revert Phases II, III, and IV to First Stage Approvals with modifications.")
This is going to be a lengthy process, with hearings at the Zoning Commission, reports from the Office of Planning and others, and presentations to the ANC (starting with one this coming Monday night, Dec. 12). So I'm going to avoid getting into the weeds too much too early, and will just give some bullet points of what changes they are looking for. (You're free to read these 57 pages of the filing for more detail.)
* The new Phase 1 building, at the far east end of the site (next to Diamond Teague Park) will now be the aforementioned residential building, a nine-story U-shaped design oriented toward the river with 300-350 units and 286 below-grade parking spaces. There will still be 12,500 square feet of retail, though they are asking that 7,000 of it be "flex space" that "may alternatively be dedicated to residential amenity space" until retail gets going. There will be a private courtyard within the "U", but there will also be the open space on the buildings' east side, now dubbed Anacostia Plaza, that will be open enough to maintain open views from First Street and the stadium's Grand Staircase to the river but will also provide "passive recreation space."
* The esplanade that has always been such a big part of the site plan remains, acting as the portion of the Anacostia Riverwalk Trail connecting South Capitol Street to Teague Park, the new pedestrian bridge, and the Yards Park. The Esplanade will "relate" to the "design vernacular" of the newly constructed boardwalks, and will also have a lot of stormwater management and bio-filtration offerings.
* On the building's west side will be the "Mews," which they call a pedestrian boulevard separating the Phase 1 building from the planned Phase 2 residential building. This path will also provide access to parking and loading for the first two phases, but "a dynamic paving design . . . will help distinguish this area as an urban space that privileges pedestrians over vehicles."
* The filing says they anticipate construction to begin in the second quarter of 2013, with first move-ins in early 2015 and the entire phase completed by summer 2015.
As for overall changes, here's what seem to be the most interesting changes from the previously approved design that the developers are looking for:
* The new plan would bring 1,164,640 square feet of gross floor area (4.6 FAR), up from 1,115,400 sq ft/4.4 FAR in the last plan. The other three phases' uses would remain unchanged (residential, office, hotel).
* Building heights of 130 feet for Phase 2-4 are being requested, compared to 130/112/130 last time around.
* Below-grade parking spaces would go from 1,010 to 1,144.
Plus, though It's hard to tell from one small site plan concept drawing, a lot of the public space design, especially to the east of the Phase 3 and 4 buildings, looks scaled back from the 2008 design. (UPDATE: Here's a graphic put together from another part of the filing that compares the 2008 site plan with the current one.)
The filing also says that "the Applicant would like the flexibility to provide interim uses on Phases, II, III, IV so that the site will not simply lay dormant pending construction," and lists a park, a farmers market, or other "simple, temporary retail uses" as examples.
And, just as in the previous plans, development of phases 3 and 4 are completely dependent on the construction of a new South Capitol Street Bridge, since the current bridge bisects the property where those buildings are planned.
Again, this is early in this new process, and there will be plenty of filings and presentations to come for all the additional detail you're going to be clamoring for. For now, the takeaway is that FRP/MRP want to get started on a residential building at 1st and Potomac in the spring of 2013, and still want to move forward on the rest of the site with a design similar to what was approved 3 1/2 years ago, but with some modifications.
This project first began its zoning quest in 1998, and went through a four-year process ending in 2008 to get its second-stage approvals. I should also note that Davis Buckley Architects, who worked on the project throughout that 10-year ordeal, is no longer part of the design team; SK&I is now on board, with Oculus as the landscape design firm. The site's owners, FRP Development/Florida Rock Properties, announced their partnership with MRP Realty earlier this year.
(As for the concrete plant currently on site, I haven't looked lately, but demolition is underway, and the filing says it should be done by the end of the year. Tom Boswell's heart will be broken.)
UPDATE, 1/3: Just before Christmas, demolition was finished on the plant, making it #166 in my Demolished Buildings Gallery.
Comments (3)
   
 
 More About Florida Rock
 All posts: Florida Rock, zoning

JDLand.com Home

Comments

lester says: (12/9/11 3:15 PM)
130 feet tall? That's curious.

The area is zoned W-2, which would traditionally allow for up to 60 feet. It's part of the capital gateway overlay, which is designed "to reduce the height and bulk of buildings along the Anacostia riverfront."

Then DC goes ahead and approved (previously) 130/112/130 foot tall buildings (Phase II, III, and IV, not sure what Phase I will be). Wow. The wonders of the PUD (which basically nullifies the W-2 and CG designation).

However, moving past these decisions, how on earth do they justify 130 feet with respect to the Heights of Building Act of 1910? To allow a 130 foot tall building, you would need to have either South Capitol or Potomac be 110' wide, and as best as I can estimate from the DC property records web site, they are at most 90' wide. What gives?

Either way, it seems silly to develop an overlay to reduce height and bulk near the Anacostia riverfront, and then approve four buildings on the waterfront 100+ feet high...

Mind you, from where I live, the buildings won't really impact my view at all, I just find it all very... strange.


JD says: (12/9/11 3:22 PM)
Phase I was originally approved at 92 feet; they're requesting 95 feet this time.

There's a fair amount of discussion of the zoning starting around page 11 in the document I link to above, which says that CG/W-2 (the Capitol Gateway overlay) allows for max heights of 130 ft in mixed-use developments. (Purely commercial buildings can only be 60 feet high; the CG overlay gives the opportunity for increased density by developing mixed-use.)

Here's the Capitol Gateway Overlay, if you want to read: link




IMGoph says: (12/17/11 12:17 AM)
I like the fact that the building footprints aren't curvy like the Watergate anymore. That footprint just felt contrived.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed

See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2015!
 Top News
  
202_cyclist on Out and About: We are visiting Sun Valley, ID, this week. My mom said that everyone is excited...
snakegriffin on Out and About: I would kill for some more solid info on upcoming condos! The wife and I are try...
JD on Out and About: You guys are overthinking this. Remember that not everyone reads the comments.
202_cyclist on Out and About: The lot behind the McDonalds?



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O POTOMAC AVE SE   THEFT F/AUTO
 08/17/15
500 B/O L ST SE   THEFT F/AUTO
 08/17/15
UNIT B/O K ST SE   THEFT F/AUTO
 08/16/15
500 B/O L ST SE   THEFT
 08/08/15
UNIT B/O I ST SE   BURGLARY
 08/07/15
300 B/O WATER ST SE   THEFT
 08/05/15
UNIT B/O I ST SE   THEFT
 08/04/15
50 B/O M ST SE   THEFT
 08/04/15
400 B/O M ST SE   THEFT
 08/03/15

Recent Issued Building Permits Archive  
1277 1ST ST SE   
08/11/15 
BALLPARK RESIDENTIAL LLC / RICHARD V CAREY
P1508164 / SUPPLEMENTAL
   
08/21/15 
BALLPARK RESIDENTIAL LLC BALLPARK RESIDENTIAL LLC / CLINT HOLMES; BALLPARK RESIDE BALLPARK RESIDENTIAL LLC; MITCH PERMUY
E20139177 / SUPPLEMENTAL
1000 5TH ST SE   
08/18/15 
UNITED STATES OF AMERICA / JOSEPH M MAGNOLIA
P1508371 / SUPPLEMENTAL
1150 5TH ST SE   
08/11/15 
PEPCO PEPCO
AH1500668 / CONSTRUCTION
INSTALLATION OF CABLE AND METERS
1220 12TH ST SE   
08/13/15 
WASHINGTON GAS LIGHT CO / JOHN GIUSEPPE-RAMCO
B1509350 / CONSTRUCTION
RENOVATIONS TO EXISTING 3RD FLOOR OFFICE SPACE EXELIS AS SHOWN ON THE ATTACHED MECH. PLUMB. ELECT. FIRE PROTECTION DEMOLITION AND ARCH. DWGS. INTERIOR WORK ONLY. NO CHANGE IN US. NO STRUCT. WORK.
909 HALF ST SE   
08/13/15 
BAKER DC LLC / CHRISTINE LONG
AH1500677 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 11:00PM FRIDAY THRU 11:00PM SATURDAY
   
08/18/15 
BAKER DC
AH1500686 / CONSTRUCTION
AN AFTER HOURS PERMIT IS RESPECTFULLY REQUESTED FROM 12:01AM WEDNESDAY THRU 11:59PM THURSDAY. 1-49 BLOCK OF K ST SE
   
08/21/15 
BAKER DC / CHRISTINE LONG
AH1500695 / CONSTRUCTION
AN AFTER HOURS PERMIT IS FROM 12:01AM THRU 11:59PM FROM 08 / 25 / 2015 TO 08 / 29 / 2015
1015 HALF ST SE   
08/13/15 
HALF ST SE LLC / GREGORY E LIGON
E1508399 / SUPPLEMENTAL
   
08/17/15 
HALF ST SE LLC / ANTHONY G SAMBURG
E1508502 / SUPPLEMENTAL
   
08/20/15 
WSP PARSONS BRINCKERHOFF / STEVE AUD; WSP PARSONS BRINCKERHOFF; STEVE AUD
E95740122 / SUPPLEMENTAL
1220 HALF ST SE   
08/12/15 
BUFFALO WILD WINGS / NICOLE WHITE; BUFFALO WILD WINGS; GREG CONCANNON
AR49901357 / SUPPLEMENTAL
   
08/13/15 
BUFFALO WILD WINGS / BELA X-PEDITERS PLUS INC.
AH1500681 / CONSTRUCTION
WORK AFTER HOURS 7PM-7AM. 8 / 13 / 2015 TO 9 / 13 / 2015
601 L ST SE   
08/17/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KRISSY GER LISA LJ PERMIT
B1510955 / CONSTRUCTION
REVISION TO B1101058 MINOR GRADING REVISION
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502944 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) HYDRO / STEEL / CENTRALLY / PASSENGER TO PROVIDE ACCESS BETWEEN G AND G2 FLOORS AS PER PLANS.
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502945 / SHOP DRAWING
TYPE OF ELEVATOR: TWO (2) TRACTION / STEEL / CENTRALLY / PASSENGER (5TH FLOOR).
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502970 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) TRACTION / STEEL / CENTRALLY / PASSENGER (6TH FLOOR).
   
08/20/15 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MARK A DORSEY
EN1502971 / SHOP DRAWING
TYPE OF ELEVATOR ONE (1) TRACTION / STEEL / CENTRALLY / PASSENGER (6TH FLOOR).
80 M ST SE   
08/24/15 
COLUMBIA PROPERTY TRUST / KRISTINA DELGADO
B1510944 / CONSTRUCTION
PARTIAL 4TH FLOOR RENOVATIONS INCLUDING MECHANICAL PLUMBING ELECTRICAL AS WELL AS FURNITURE INSTALLATION.
20 M ST SE   
08/19/15 
SOUTHEAST REALTY LLC / ELEANOR FARID; SOUTHEAST REALTY LLC; RODNEY CANNON
E69278004 / SUPPLEMENTAL
50 M ST SE   
08/11/15 
MILLER?LONG
TC1500036 / CONSTRUCTION
TOWER CRANE FOR JOB SITE USE
   
08/13/15 
MILLER?LONG MILLER?LONG
AH1500674 / CONSTRUCTION
AFTERHOURS TO PUT UP TOWERCRANE WITH 200 TON MOBILE CRANE SATURDAY 8 / 15 / 2015 AND 8 / 16 / 2015 FROM 5AM TO 9PM
   
08/14/15 
KCG 50 M LLC / JOSEPH E RICHARDS
E1508432 / SUPPLEMENTAL
   
08/21/15 
KCG 50 M LLC / DANIEL R. RUDE
P1508460 / SUPPLEMENTAL
55 M ST SE   
08/19/15 
DOUG OLSON / DOUG OLSON; NONE
SG1500414 / CONSTRUCTION
NEW SIGNS INSTALLATION AS PER PLANS
1500 M ST SE   
08/21/15 
WASHINGTON YACHT CLUB / ZACHARY ZILL
SB1500438 / CONSTRUCTION
SOIL BORING FOR COMPENSATION GROUTING ALONG THE ALIGNMENT OF DC WATER'S CLEAN RIVERS DIV H - ANACOSTIA RIVER TUNNEL. FORTEEN BORINGS TO MAX DEPTH OF 70 FEET BGS 2 INCH DIAMETER GROUT TUBES INSIDE 5.5 INCH DIA CASINGS. DUPLEX ROTARY DRILLING METHOD. REF. PERMIT SB1400400.
1100 NEW JERSEY AVE SE   
08/11/15 
CHRISTOPHER CONDON
PC69159304 / POST CARD
INTERIOR DEMOLITION OF NON-BEARING ELEMENTS IN A SPACE UP TO 5 000 SQUARE FEET (464.5 SQUARE METERS)
1500 SOUTH CAPITOL ST SE   
08/14/15 
P1508259 / SUPPLEMENTAL
301 WATER ST SE   
08/12/15 
LUMBER SHED LIC / ROBERT WATTS; LUMBER SHED LIC; ROBERT WATTS
E99575145 / SUPPLEMENTAL
355 WATER ST SE   
08/14/15 
TIAN LUU / TIAN LUU; TIAN LUU; JAMES BORROR
E95497821 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory




     © Copyright 2015 JD.