Since January, 2003
            
 (a random before-and-after moment)
September 17, 2006
March 26, 2015
Half at L, Looking Northeast (see more)

I almost can't bring myself to write the words, but the owners of the Florida Rock site just south of Nationals Park have filed with the Zoning Commission for not only the previously reported plan to change the planned first phase office building to a residential one, but also to revisit parts of the site plan for the three subsequent phases. (For those of you versed in zoning speak, they are requesting to "revert Phases II, III, and IV to First Stage Approvals with modifications.")
This is going to be a lengthy process, with hearings at the Zoning Commission, reports from the Office of Planning and others, and presentations to the ANC (starting with one this coming Monday night, Dec. 12). So I'm going to avoid getting into the weeds too much too early, and will just give some bullet points of what changes they are looking for. (You're free to read these 57 pages of the filing for more detail.)
* The new Phase 1 building, at the far east end of the site (next to Diamond Teague Park) will now be the aforementioned residential building, a nine-story U-shaped design oriented toward the river with 300-350 units and 286 below-grade parking spaces. There will still be 12,500 square feet of retail, though they are asking that 7,000 of it be "flex space" that "may alternatively be dedicated to residential amenity space" until retail gets going. There will be a private courtyard within the "U", but there will also be the open space on the buildings' east side, now dubbed Anacostia Plaza, that will be open enough to maintain open views from First Street and the stadium's Grand Staircase to the river but will also provide "passive recreation space."
* The esplanade that has always been such a big part of the site plan remains, acting as the portion of the Anacostia Riverwalk Trail connecting South Capitol Street to Teague Park, the new pedestrian bridge, and the Yards Park. The Esplanade will "relate" to the "design vernacular" of the newly constructed boardwalks, and will also have a lot of stormwater management and bio-filtration offerings.
* On the building's west side will be the "Mews," which they call a pedestrian boulevard separating the Phase 1 building from the planned Phase 2 residential building. This path will also provide access to parking and loading for the first two phases, but "a dynamic paving design . . . will help distinguish this area as an urban space that privileges pedestrians over vehicles."
* The filing says they anticipate construction to begin in the second quarter of 2013, with first move-ins in early 2015 and the entire phase completed by summer 2015.
As for overall changes, here's what seem to be the most interesting changes from the previously approved design that the developers are looking for:
* The new plan would bring 1,164,640 square feet of gross floor area (4.6 FAR), up from 1,115,400 sq ft/4.4 FAR in the last plan. The other three phases' uses would remain unchanged (residential, office, hotel).
* Building heights of 130 feet for Phase 2-4 are being requested, compared to 130/112/130 last time around.
* Below-grade parking spaces would go from 1,010 to 1,144.
Plus, though It's hard to tell from one small site plan concept drawing, a lot of the public space design, especially to the east of the Phase 3 and 4 buildings, looks scaled back from the 2008 design. (UPDATE: Here's a graphic put together from another part of the filing that compares the 2008 site plan with the current one.)
The filing also says that "the Applicant would like the flexibility to provide interim uses on Phases, II, III, IV so that the site will not simply lay dormant pending construction," and lists a park, a farmers market, or other "simple, temporary retail uses" as examples.
And, just as in the previous plans, development of phases 3 and 4 are completely dependent on the construction of a new South Capitol Street Bridge, since the current bridge bisects the property where those buildings are planned.
Again, this is early in this new process, and there will be plenty of filings and presentations to come for all the additional detail you're going to be clamoring for. For now, the takeaway is that FRP/MRP want to get started on a residential building at 1st and Potomac in the spring of 2013, and still want to move forward on the rest of the site with a design similar to what was approved 3 1/2 years ago, but with some modifications.
This project first began its zoning quest in 1998, and went through a four-year process ending in 2008 to get its second-stage approvals. I should also note that Davis Buckley Architects, who worked on the project throughout that 10-year ordeal, is no longer part of the design team; SK&I is now on board, with Oculus as the landscape design firm. The site's owners, FRP Development/Florida Rock Properties, announced their partnership with MRP Realty earlier this year.
(As for the concrete plant currently on site, I haven't looked lately, but demolition is underway, and the filing says it should be done by the end of the year. Tom Boswell's heart will be broken.)
UPDATE, 1/3: Just before Christmas, demolition was finished on the plant, making it #166 in my Demolished Buildings Gallery.
Comments (3)
   
 
 More About Florida Rock
 All posts: Florida Rock, zoning

JDLand.com Home

Comments

lester says: (12/9/11 3:15 PM)
130 feet tall? That's curious.

The area is zoned W-2, which would traditionally allow for up to 60 feet. It's part of the capital gateway overlay, which is designed "to reduce the height and bulk of buildings along the Anacostia riverfront."

Then DC goes ahead and approved (previously) 130/112/130 foot tall buildings (Phase II, III, and IV, not sure what Phase I will be). Wow. The wonders of the PUD (which basically nullifies the W-2 and CG designation).

However, moving past these decisions, how on earth do they justify 130 feet with respect to the Heights of Building Act of 1910? To allow a 130 foot tall building, you would need to have either South Capitol or Potomac be 110' wide, and as best as I can estimate from the DC property records web site, they are at most 90' wide. What gives?

Either way, it seems silly to develop an overlay to reduce height and bulk near the Anacostia riverfront, and then approve four buildings on the waterfront 100+ feet high...

Mind you, from where I live, the buildings won't really impact my view at all, I just find it all very... strange.


JD says: (12/9/11 3:22 PM)
Phase I was originally approved at 92 feet; they're requesting 95 feet this time.

There's a fair amount of discussion of the zoning starting around page 11 in the document I link to above, which says that CG/W-2 (the Capitol Gateway overlay) allows for max heights of 130 ft in mixed-use developments. (Purely commercial buildings can only be 60 feet high; the CG overlay gives the opportunity for increased density by developing mixed-use.)

Here's the Capitol Gateway Overlay, if you want to read: link




IMGoph says: (12/17/11 12:17 AM)
I like the fact that the building footprints aren't curvy like the Watergate anymore. That footprint just felt contrived.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News
Get JDLand Updates In Your Inbox!
  

JD on Impressionistic First Peek/District: The marina will actually kind of block that option, unless you are parked at a s...
202_cyclist on Impressionistic First Peek/District: @SWag-- a boat would take care of that. There is still plenty of space on the m...
JD on Capitol Riverfront BID: They're getting on the Bisnow train, I see. :-) Bisnow's session at Arena Stage ...
JHUGrad on Capitol Riverfront BID: FYI.... The Washington Business Journal will be making the Capitol Riverfront th...
Advertisement



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
UNIT B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/03/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 01/31/16
900 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/29/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 01/19/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft First Degree (all Other Larceny)
 01/18/16
70 B/O I ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 01/11/16
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/10/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/09/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/09/16
1000 B/O HALF ST SE   ROBBERY  01/06/16
50 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/06/16

Recent Issued Building Permits Archive  
1025 1ST ST SE   
01/20/16 
RUSS TYLER
PC38173572 / POST CARD
INSTALLATION OF NOT MORE THAN 1 NEW AIR CONDITIONING UNIT UP TO A MAXIMUM OF 10-TONS OF EQUIVALENT REFRIGERATING EFFECT.
1277 1ST ST SE   
02/04/16 
BALLPARK RESIDENTIAL LLC / MILLER&LONG MILLER&LONG
AH1600342 / CONSTRUCTION
AFTERHOURS TO POUR AND FINISH CONCRETE FROM2 / 3 / 2016 TO 3 / 3 / 2016 FROM 5AM TO 9PM. BUILDING PERMIT B1403488
1240 12TH ST SE   
01/22/16 
AECOM TECHNICAL SERVICE
B1603969 / CONSTRUCTION
EXTENSION OF EXISTING PERMIT B1503361. TO EXPIRE 6.14.16
82 I ST SE   
01/29/16 
JOHN MORIARTY & ASSOCIATES OF VIRGINIA / KTT PERMIT EXPE LLC
AH1600329 / CONSTRUCTION
CONTRACTOR TO PERFORM BRICK MASONRY WORK ON EXTERIOR OF BUILDING. SUNDAYS ONLY - 9AM TO 5PM - 1 / 31 / 16 2 / 7 / 16 2 / 14 / 16 AND 2 / 28 / 16.
   
01/29/16 
CSX TRANSPORTATION INC / DANIEL M. NARH
P1603168 / SUPPLEMENTAL
317 L ST SE   
01/21/16 
NA NA NA
EHOP1690275 / HOME OCCUPATION
55 M ST SE   
01/29/16 
HINES GLOBAL REIT 55 M STREET LLC / PEPCO PEPCO
AH1600334 / CONSTRUCTION
NIGHT WORK NECESSARY FOR CONSTRUCTION OF CONDUIT AND MANHOLES FOR SERVICE AT 1277 FIRST ST. SE TO PREVENT INTERFERENCE WITH DDOT PARKING GARAGE. PUBLIC SPACE PERMIT PA114427-R2.
   
02/03/16 
WILLIAM SNODDEY / JOSEPH SEMPER; WILLIAM SNODDEY; JOSEPH SEMPER
E22238682 / SUPPLEMENTAL
80 M ST SE   
02/03/16 
REIT WELLS
PC63025208 / POST CARD
REPLACEMENT OR REPAIR OF NOT MORE THAN 10 EXISTING OUTLETS AND NOT MORE THAN 10 EXISTING LIGHTING FIXTURES FOR A RESIDENTIAL COMMERCIAL OR INDUSTRIAL PROJECT.
99 M ST SE   
01/21/16 
BALLPARK SQUARE 701 LLC / JOSEPH E RICHARDS
E1603127 / SUPPLEMENTAL
   
02/03/16 
BALLPARK SQUARE 701 LLC / JOSEPH E RICHARDS
E1603392 / SUPPLEMENTAL
100 M ST SE   
01/29/16 
PARSONS COMPANY / STANLEY-CSS
B1604162 / CONSTRUCTION
INSTALL MAGNETIC LOCK W / REX SENSOR REX BUTTON AND FIRE UNLOCK RELAY INTEGRATION AS REQUIRED UNDER IBC 1008.1.9.8
   
01/21/16 
MONUMENT REALTY MONUMENT REALTY / CLINTON PARKER; MONUMENT REALTY MONUMENT REALTY; PIERRE CHOUPO
AR80952153 / SUPPLEMENTAL
   
01/28/16 
CB RICHARD ELLIS / RONALD OTT; CB RICHARD ELLIS; RONALD OTT
E45568021 / SUPPLEMENTAL
   
02/01/16 
SQUARE 743 INC / LLOYD C LONDON
E1603304 / SUPPLEMENTAL
202 M ST SE   
01/20/16 
UNITED STATES OF AMERICA / ; NORTEAST ELECTRIC
SG1600147 / CONSTRUCTION
INSTALL 2 SIGNS ON WALL 1-4'-10" X 10"-8" 1-2'4"X6'-9"
1244 SOUTH CAPITOL ST SE   
02/03/16 
1244 S. CAPITAL RESIDENTIAL LLC / ANDREW WILLINGHAM; NA; BRIAN WERRELL
BCIV1500117 / CONSTRUCTION
SITE GRADING FOR REDEVELOPMENT OF EXISTING PARKING LOT INTO 13 STORY MIXED USE RETAIL AND RESIDENTIAL BUILDING WITH 2 LEVELS OF SUBSURFACE PARKING. PROJECT ALSO PROPOSED STREETSCAPE IMPROVEMENTS AND SITE AMENITIES
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.