peek >>
New District Department of Transportation Headquarters

250 M St., SE
190,000 sq ft, 10-story building, with 13,000 sq ft ground-floor retail
Part of the Capper Hope VI PUD
Construction underway in early 2019


Developer: WC Smith (along with the DC Housing Authority)
In the Pipeline
1000 South Capitol
25 M
Yards/Parcel I
Yards/Parcel G
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/Movie Theater
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
A 2018 updated rencering of 250 M Street, as seen from 2nd and M, with the completed Harlow residential building at left rear, and 300 M to the right.
The left/west side of the building faces Canal Park.
The northeast corner of 2nd and M in August 2003, the same angle as seen in the rendering above. The boarded-up gas station was torn down one month later. The red brick building at left is an Arthur Capper apartment block, which was demolished in early 2005. (08/03)
The same location, with the billboard announcing the project, in May 2007. 300 M Street is at rear right. And that's pretty much how the southern part of Square 769 still looks, eleven-plus years later. Click to see all available photos of this location.
The northwest corner of 3rd and M, in September 2000. The building under construction is 80 M Street.
April 14, 2018 - The same location, a mite different. Click to see all available photos of this location.
A view toward the rear of the 250 M lot, looking south-southeast on 2nd street, at its intersection with L Street, in January 2003. (01/03)
September 30, 2018 - The same location, with the Harlow mixed-income apartment building now occupying the north half of the block . The Capper buildings on this block were demolished in January, 2005, and the USDOT HQ has risen at the end of 2nd Street, across M Street. Click to see all available photos of this location.
Latest News



                  © Copyright 2019 JD.