Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: winery
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


11 Blog Posts Since 2003
Go to Page: 1 | 2

Some pronouncements that have been muchly anticipated:
* Taylor Gourmet opens tomorrow, Wednesday, Aug. 23, on 1st St. SE between M and N, at 11 am.
* District Winery opens on Aug. 30. And its restaurant is apparently named Ana, as in Anacostia. (WTOP)
(This is short, because I saw the sun disappear yesterday, and am still out of pocket.)
 

Enough tidbits in the hopper to actually go less than a week between posts. Yay!
* 816 POTOMAC: Developers of the empty lot on the northwest corner of 9th and Potomac, SE have gotten an initial green light from the Historic Preservation Review Board for a four-story residential building with below-grade parking. This project will also incorporate an existing historic building at 819 L (sort of visible here), which will remain separate from the new building. Here is a video showing what the project would look like, and a screengrab from it of the proposed building is at right. No word on timing, and this does not include the existing old apartment building next door at 812 Potomac.
* 99 M TENANT: The under-construction office building at the corner of 1st and M has signed its first tenant, with Pyxera Global taking 17,000 square feet on the fourth floor. As I mentioned a few posts ago, Skanska said recently that some tenant announcements would be in the offing, and this would appear to be one of them. (Bisnow)
* POP-UP BBQ: If you've noticed the picnic tables on the northwest corner of 1st and N, where the F1rst sales trailer was, it's the home of a Rocklands Barbeque and Grilling Company pop-up offering on Nats game days, from now through the end of the season (and post-season). Service off of the "full food truck menu." including beer and wine, will start 90 minutes before gametime, through the first 30 minutes after first patch.
* MORE PROGRESS: On my way to and from the ballpark this weekend, I took a few smudgy cellphone photos of progress, showing the new DC Water HQ, District Winery, and (water-filled) holes in the ground at Parc Riverside II and West Half (forgot to go across the street to Lynch Half), and evidence of previously tidbitted items about the warehouse at 49 L Street and the A1 Garage site. Maybe I'll get out with the real camera this weekend for a full update, weather and energies permitting.
One that I didn't take was the view southward from M Street between 1st and New Jersey--I have to admit I was not expecting the DC Water HQ to be so visible from the north.
 

Sunday morning brought a confluence of a clear calendar, clear skies, and a sort-of-unexpected desire to "get back to work," such as it is, so I took a long walk to get the JDLand camera caught up with the goings-on in the neighborhood. Here's the rundown:
* UPWARD: The biggest news (for me, anyway) is that at last the 99 M office building project has peeked up above ground-level. Also worth getting excited about is seeing the structural steel going up for the new DC Water headquarters along the banks of the Anacostia.
* DOWNWARD: There's digging underway (or about to be) in multiple locations, and the camera peeked past the fences to check out the holes. In order, may I present the current state of: the former McDonald's site at 2 I Street (where a 380-unit apartment building will rise), the Yards Parcel O site at 4th and Tingey (where a joint condo/apartment project has been slooowly underway thanks to the need to dig very carefully when it's an old munitions site), the mixed-income Capper apartment building at 3rd and L, and the JBG West Half residential project directly north of Nats Park.
(I missed the hole at South Capitol and M where the new NAB headquarters and the 10 Van residential building will rise, but it probably doesn't look all that much different from this.)
Then there's the Half Street Hole, where work does appear to be underway, but since excavation was done in 2007, it's kind of hard to tell what's new (I should have gone up to the Hampton Inn roof). Finally, there's the lot at Half and L where fences recently went up around the site that will be Phase II of the Parc Riverside apartment building, but while some dirt has been turned, heavy equipment isn't quite yet on site.
So, if you are counting, that is eight additional projects that will rise out of the ground in the coming year or so, along with the four others that are already above ground but not done.
* OUTWARD: Vertical construction has been finished for a while at the residential building 1221 Van just north of the ballpark, but exterior work has progressed since I last wandered by. And ditto for the District Winery building at 4th and Water.
* ONWARD: Some additional catching up.
And there are going to be lots of other "for the historical record" photos that have been needed to be taken for some months added to various project pages in coming days. Just click around from the main map--you'll never know what you might find.
Coming Soon, a Coming Soon post.
 

These days I'm generally the last person laying eyes on something new in the neighborhood, but I still find it necessary to conduct photo documentation when the calendar and forecast align. Which they did on Sunday.
Let's look at signs and entrances, starting first at F1rst and its Residence Inn, where it looks like the homestretch has been entered (click to enlarge, of course):
Then, let's go over to 4th Street, where the District Winery building continues to zip along. It's also where the Bower is now signed, as is Conte's space in Arris:
Then we'll double back westward (you're getting a sense for how far I walk on these excursions), taking a look at the new sidewalk on New Jersey Avenue in front of Insignia on M. Shake Shack's signage at the Homewood Suites, and the One Hill South entrance (very New York, isn't it). (I caught the Bethesda Bagels signage back in December, just in case you think I'm missing it.)
I even caught the view from the bridge of the new Bardo beer garden at Florida Rock, with a few hardy souls in attendance. Plus, views of both Agora on New Jersey Avenue (aka the Whole Foods Building) and 1221 Van (aka That Big Building On South Capitol Immediately North of the Ballpark):
All the links above to project pages have additional brand spanking new pics, and of course Before photos.
Next up, checking out holes in the ground, both current and coming soon.
 

The photo from the 300 block of Tingey St. SE says it all--"fine men's salon" Eighteen Eight is apparently coming to the former leasing office space in the ground floor of the Foundry Lofts at the Yards.
This would be the second DC opening for the company, joining its 14th St. NW location (along with one in Bethesda and two others in Maryland).
In addition to haircuts, 18|8 offers face, scalp, and nail treatments, shaves, waxing, and coloring; there are also grooming party packages for when you guys want to get with your buddies and get all gussied up.
It's Tingey Street's second grooming outlet, joining the Bang Salon one block to the east. (Too bad Unleashed doesn't offer grooming, otherwise there'd be a Tingey trifecta.)
No official word on when it will open, so don't let your hair get too long while waiting.
Meanwhile, one block to the south, the new District Winery building is getting its face on.
(h/t to reader RMP for the 18|8 sighting)
 

Why, yes, I did spend part of my Saturday taking pictures of new-and-not-so-new signs in windows! (Also took lots of other photos, which will come soon.)
Both Orangetheory Fitness and Slipstream Coffee now have their locations well marked, in the new ORE 82 apartment building at New Jersey and I. Ditto Conte's Bike Shop, on 4th Street just north of the Yards Park:
Elsewhere, I alas have to improvise, having either been too lazy to walk closer or too boneheaded to take a photo when I was actually standing right in front of the dang sign. But nonetheless here's evidence of Bethesda Bagels, coming to Insignia on M, and Shake Shack, which recently received its building permit for its space at the Homewood Suites, in the retail space at Cushing and M (a second space does not yet have any announced tenant):
(I'll resort to pointing you to photos I took in October of the signage for both The Salt Line and All-Purpose Pizzeria, at Dock 79.)
In non-signage retail news, here's the current state of construction on the new District Winery building at the Yards, along with photographic evidence that the shipping containers have indeed been removed from the southern two-thirds of the former Fairgrounds footprint. They remain up by Half and M, however.
Everything mentioned here is expected to open in 2017, as are some other not-photographed venues. Scroll down below my Food Map for the full list of announced-but-not-open offerings.
 

At 4th and Water Streets, SE, the steel has started popping up for District Winery, the winery/restaurant/events space coming in late 2017 to the Yards.
The official web site is online, along with Facebook, Twitter, and Instagram accounts, though right now the site's links are mainly for how to reserve the events space for your wedding or how to work for the winery.
Here's a few more images, along with recognition that I need to get my act together and create a project page, though in the meantime you can read my previous posts for more info.
Just to the winery's northeast, digging is well underway at Parcel O, where a joint project is underway that will beget a 138-unit condo building by PN Hoffman and a 190-unit rental building by Forest City. There are hints that the condo building will be called The Bower, though PN Hoffman's web site hasn't quite gotten there yet. Completion is expected in 2018.
 

On Feb. 18 the Zoning Commission unanimously approved the submitted plans for a new-construction building at the Yards on the southwest corner of 4th and Water Streets, SE, that is to be home to District Winery, DC's first-ever winery (at least, as far as the owners can tell).
Brian Leventhal, one of the owners of both Brooklyn Winery and the coming DC venture, told the commission that this will be a full commercial winery, processing fresh grapes brought in from various US locations (including Virginia).
And since "you can't have wine without food," there will also be a 90-seat interior restaurant open seven days a week, which will also have outdoor seating.
In addition, the 2nd floor will be an events space, which the winery hopes will become a "very coveted wedding space," as well as a location for corporate and political events. There will also be tours of the winery, and bottles will be available for purchase (with "Bottled in the District of Columbia" on the labels).
Leventhal also showed some slides of Brooklyn Winery's operations to the commission, which you can see here.
Forest City's Jonathan Gertman testified that the company is targeting June 1 for the start of construction, and Leventhal said that they are hoping to be open by September of 2017. A liquor license is already in hand.
I posted a few weeks ago the early designs for the building, which will be a sibling of sorts for the Lumber Shed (and eventually there will be a third retail pavilion nestled between the two). The image at the top of this post is a slightly more realized version, though note that the red dots and lines aren't actually part of the design (I grabbed it from the zoning filings). The entrances will be on the wall facing west toward the Lumber Shed, and the restaurant will be on the south end of the building, where outdoor seating will look toward the Anacostia River.
Other than concerns about whether a winery would be a permitted use or an associated use under the zoning overlay, and some small frustrations about not being exactly sure what the differences were between the original approvals back in 2009 and the new case, all the zoning commissioners were enthusiastic about the project and the design. Michael Turnbull said that "I think this is going to be such a cute little building, and I think it'll be a fun place to go," while Robert Miller called it a "very exciting project, a very attractive building, a unique activating use in this Yards area," and that he looks forward to sampling it.
The commissioners felt no need to request additional information or changes, and with the Office of Planning recommending approval, and with ANC 6D's unanimous vote in support earlier this month, the commission took final action and approved the case 5-0-0.
 

Recent zoning filings are giving interested observers (i.e., me, and most likely you) a watercolor'ed early rendering of the new Yards Park "pavilion" expected to be home to District Winery, a "boutique" winery/restaurant/event space on the southwest corner of 4th and Water Streets, SE.
As described in the filings, the winery "will produce premium small batch wines served on the premises and occasionally sold in bottles for patrons to consume elsewhere. Guests will be able to tour the winery, taste wines at the wine bar, have dinner at the restaurant and reserve the second floor venue for a private event, such as a wedding receptions, corporate event or private function." It will have a capacity of 750 persons, with 450 seats.
The filing goes on to say that the winery, the "first of its kind" in DC, is expected to open in the fall of 2017.
The drawing above is the view as seen from the Yards Park, on the southwest side of the building (so, as if you are walking east from Osteria Morini). Here are slightly less impressionistic but still early drawings of the elevations from all four sides (click to enlarge):
There will eventually be a third pavilion positioned between the winery and the Lumber Shed--the filing says that Forest City is "working on securing a retail tenant(s)" and that it will "most likely be a restaurant."
The zoning hearing for the winery is scheduled for February 18. This plan was supported by ANC 6D in a 7-0-0 vote on Jan. 11, "contingent upon the execution of a mutually agreed construction management plan."
 

Rumored a few months ago after a liquor license application appeared in the pipeline, it's officially being announced today by Forest City Washington that the owners of Brooklyn Winery will be opening DC's first "urban winery" in a new 16,000-square-foot pavilion on the southwest corner of 4th and Water Streets SE in the Yards Park.
It will be named District Winery, and is to "feature the most popular components" of the Brooklyn version--it will be a full-service restaurant, and will also have a wine tasting area, a private events space with an open-air terrace, and, "of course, an impressive collection of wines, crafted and aged onsite." The Brooklyn operation is also apparently a quite popular venue for weddings.
The new pavilion's design will apparently be quite a wood-and-glass look that will echo the nearby Lumber Shed and the Yards Park itself. When I wrote about the rumors back in May, I included some 2009-era imaginings of what the pavilion could look like from when the Yards Park was going through its approvals process, but my understanding is that the design has evolved considerably, with District Winery's input. (No new renderings are being made available just yet, however.)
Forest City says it expects to start construction in the spring of 2016 and that the winery would open in the fall of 2017.
 
11 Posts:
Go to Page: 1 | 2




                  © Copyright 2024 JD.