Since January, 2003
            
 (a random before-and-after moment)
May 21, 2004
April 16, 2016
2nd (West) at K, Looking West-Southwest (see more)

While there has been lots of news over the past few months about Near Southeast getting some of the amenities that it has lacked for a long time (restaurants, grocery), one service that the neighborhood continues to be without is an open elementary school within walking distance. DC Public Schools closed Van Ness Elementary at 5th and M SE back in 2006 because of a lack of school-aged children in the neighborhood thanks to the emptying of the Capper/Carrollsburg public housing project in advance of its reconstruction as Capitol Quarter, but kept the building in its inventory knowing that eventually the neighborhood would fill back up and a school would again be needed.
Fast forward a few years, and the neighborhood now has a number of families with small children, who get to look at unused Van Ness every day while sending their children across South Capitol Street to Amidon/Bowen Elementary in Southwest. So the Parents of the Capitol Riverfront organized themselves to advocate for getting Van Ness reopened, and put together a "delightful" public meeting with then-interim chancellor Kaya Henderson. But DCPS announced last March that the numbers didn't yet support the reopening of Van Ness, saying that it was most likely the school would not reopen before 2015.
But area parents have continued to try to find a solution, and when word got out a few months ago that the well-regarded School Within School at Peabody Elementary was looking to expand its program and would need a new and larger space, Near Southeast parents began to investigate what it might take to get SWS into the neighborhood, whether in the Van Ness building or in some other solution, perhaps even using the modular classrooms (i.e., trailers) that Capitol Hill Day School has been occupying at 5th and K during its building's renovation.
But today a statement from Henderson being sent out to various neighborhood mailing lists seems to put the kabosh on this movement. While the notion of using the CHDS trailers is "an interesting one," Henderson says that school system "already has too many schools that are too small to sustain themselves," and so it would be a "poor stewardship of the public's resources" to pay rent to put SWS in trailers or wherever if there are already a number of available facilities that could be used. Plus, those other facilities are located where placing SWS "could have an equally or potentially greater positive impact."
The statement doesn't specifically explain why Van Ness itself is not an option to house SWS, and perhaps someone who's been close to the many meetings that parents have apparently had with DCPS could explain that in the comments. It seems to still boil down to the neighborhood just not having enough students to support a school, whether it's SWS or a "normal" elementary school. Van Ness is currently home to some administrative offices, plus needs what has been rumored to be a couple million dollars in renovations to get it ready, and it does appear that DCPS is holding fast to its previous ruling that Van Ness won't be back in the system before 2015. But it's also not hard to imagine that neighborhood parents will continue to try to get a school, any school, as soon as they can.
Comments (0)
   
 
 More About Van Ness Elementary
 All posts: Van Ness Elementary

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News
  

JD on Two-Year Change in: In other news, a reader sent the link for the Homewood Suites at 50 M, "now acce...
walt on Two-Year Change in: Oh, true on that JD. I don't know why I forgot about that. I take that road my...
snakegriffin on Signs and Wonders: We lived on the 8th floor facing the highway in the Jefferson, never had any fre...

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/17/16
1000 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 08/16/16
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/14/16
16 B/O M ST SE   ROBBERY  08/12/16
1000 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/09/16
1200 B/O 1ST ST SE   THEFT
Theft First Degree (shoplifting)
 08/08/16
50 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/02/16
600 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/02/16
700 B/O L ST SE   ROBBERY  08/01/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/29/16
700 B/O L ST SE   ROBBERY  07/28/16
1100 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/25/16
1200 B/O HALF ST SE   BURGLARY
Burglary Two
 07/24/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/23/16
900 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/23/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/22/16
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 07/20/16
900 B/O 4TH ST SE   ROBBERY  07/20/16
500 B/O L ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/19/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (theft From Building)
 07/19/16

Recent Issued Building Permits Archive  
1004 1ST ST SE   
08/04/16 
SQ. 740 LLC / N/A SQ 740 LLC JOHN AKRIDGE DEVELOP COMPANY; ECC, INC.
SB1600325 / CONSTRUCTION
Due diligence investigation. Installation of six 3-inch diameter direct-push geoprobe soil borings to depths of approximately 30 below grade. Soil borings will be abandoned on the same day as drilling by tremi-grouting using a bentonite slurry composed of 2 pounds of bentonite powder to 1 gallon of water. IDW will be properly managed.
1212 4TH ST SE 120   
08/04/16 
FC 1212 LLC / CLARK S FULLER
M1603023 / SUPPLEMENTAL
1150 5TH ST SE 20002   
08/11/16 
ALAN J PHELPS / DOUGLAS FOSTER
B1509540 / CONSTRUCTION
1. Renovation of existing first and second floor of the academic wing of the Van Ness building. 2. Square footage is approximately 26,000 SF ,For phase 1 3. Cost of construction is 11.5M 4. Scope of work details a. Convert existing space in to 6 new classroom space. These classrooms will be two PreK -3, two prek-4, and two Kindergarten classes. Also for phase 1,...
1150 5TH ST SE   
08/12/16 
DISTRICT OF COLUMBIA / JOHN HOMICK
E1609156 / SUPPLEMENTAL
   
08/12/16 
DISTRICT OF COLUMBIA / MATT LOSIGNOR
P1608656 / SUPPLEMENTAL
   
08/12/16 
DISTRICT OF COLUMBIA / ORLANDO M CATANA
E1609149 / SUPPLEMENTAL
1220 HALF ST SE   
08/05/16 
NA BUFFALO WILD WINGS / NA BUFFALO WILD WINGS; BELA X-PEDITERS PLUS, INC.
AH1600921 / CONSTRUCTION
Work after hours 7pm - 7am
82 I ST SE   
08/15/16 
GDCV EYE STREET LLC / GDCV EYE STREET LLC; KIM MITCHELL CDKM CONSULTING LLC
B1611941 / CONSTRUCTION
FIRST EXTENSION TO PERMIT B1507990 TO EXPIRE ON 3 / 17 / 17
   
08/15/16 
CSX TRANSPORTATION INC / BEDCO MOBILITY INC.
EN1602806 / SHOP DRAWING
Type of Elevator : One (1) vertical wheel-chair lift / steel / garage level 2 / handicap lift (13th floor)
150 I ST SE   
08/05/16 
MAXIM CRANE WORKS MAXIM CRANE WORKS
AH1600933 / CONSTRUCTION
after hours to place mobile crane to take down tower crane with mobile crane and stage trucks from 7am 8 / 8 / 2016 to 1159p-m 8 / 9 / 2016
125 L ST SE   
08/11/16 
CRANE SERVICE CO / CRANE SERVICE CO; CHRISTINE LONG
AH1600945 / CONSTRUCTION
An after hours permit is respectfully requested from 4AM Saturday thru 9PM Sunday
80 M ST SE 1   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608566 / SUPPLEMENTAL
80 M ST SE 2   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608568 / SUPPLEMENTAL
80 M ST SE 3   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608569 / SUPPLEMENTAL
100 M ST SE 7   
08/04/16 
SQUARE 743 INC / ANTHONY G SAMBURG
E1608667 / SUPPLEMENTAL
100 M ST SE PT OF 4TH   
08/11/16 
QUARE 743 INC . / QUARE 743 INC .; JOHN GIUSEPPE-RAMCO
B1611810 / CONSTRUCTION
renovation to parts of an existing 4th floor office space, tech marine business as shown on the attached mech., plumb., elect., fire protection, demolition, and arch. dwgs. interior work only. no change in use. no struct. work. 800 sf.
300 M ST SE   
08/05/16 
FEDERAL CENTER LP / null
F1600517 / CONSTRUCTION
   
08/06/16 
FGSF TEST
PC92978992 / POST CARD
Installation of 1 temporary construction trailer on private property.
   
08/06/16 
SDS SDSDS / LAVANYA SIKHINAM; SDS SDSDS; ENRIQUE LYON
E90011839 / SUPPLEMENTAL
   
08/07/16 
XVB XVBX / FSGVSF SFGS; XVB XVBX; DAVID FARMER
E77515115 / SUPPLEMENTAL
909 NEW JERSEY AVE SE 1311   
08/11/16 
null / NA NA NA
EHOP1690902 / HOME OCCUPATION
861 NEW JERSEY AVE SE   
08/09/16 
NA CSX TRANSPORTATION, INC.
AH1600944 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1000 NEW JERSEY AVE SE   
08/02/16 
null / ALLISON HINES
PC66310814 / POST CARD
Replacement of not more than 1 gas appliance, on a residential, commercial or industrial project.
1017 NEW JERSEY AVE SE   
08/04/16 
1021 NEW JERSEY AVE LLC / N/A 1021 NEW JERSEY AVE LLC POTOMAC DEVELOPMENT; ECC, INC.
SB1600326 / CONSTRUCTION
Due diligence investigation. Installation of one 3-inch diameter direct-push geoprobe soil borings to depths of approximately 30 feet below grade. Soil borings will be abandoned on the same day as drilling by tremi-grouting using a bentonite slurry composed of 2 pounds of bentonite powder to 1 gallon of water. IDW will be properly managed.
1029 NEW JERSEY AVE SE   
08/04/16 
MESERET DEGEFU / HAILU TEKLEBERHAN; ECC, INC.
SB1600327 / CONSTRUCTION
Due diligence investigation. Installation of two 3-inch diameter direct-push geoprobe soil borings to depths of approximately 30 feet below grade. Soil borings will be abandoned on the same day as drilling by tremi-grouting using a bentonite slurry composed of 2 pounds of bentonite powder to 1 gallon of water. IDW will be properly managed.
1111 NEW JERSEY AVE SE   
08/11/16 
null / THOMAS P MCGUIRE
E1609117 / SUPPLEMENTAL
125 O ST SE   
08/04/16 
JOHN LECKER, FOREST CITY WASHINGTON, INC / JOHN LECKER, FOREST CITY WASHINGTON, INC; RACHEL DOERY, PSI
SB1600337 / CONSTRUCTION
Site is located south of N Pl SE, 500ft east of intersect with First St, SE in Washington, DC. Drilling soil borings at site for future development of a 4-story concrete parking garage with 331 parking spaces at street level. A 2-story theater will be constructed above the parking garage totaling approximately 95,000 sf.
25 POTOMAC AVE SE   
08/03/16 
RIVERFRONT INVESTMENT PARTNERS / RIVERFRONT INVESTMENT PARTNERS; JASON BENTLEY
B1610683 / CONSTRUCTION
Revision to Issued Permit Number B1408697.
741 SICARD ST SE 20374   
07/29/16 
US NAVY NAVFAC WASHINGTON / US NAVY NAVFAC WASHINGTON; RPS INC
SB1600239 / CONSTRUCTION
ADVANCEMENT OF UP TO 22 SOIL BORINGS AND 4 MONITORING WELLS TO SUPPORT INVESTIGATION OF FORMER PETROLEUM UNDERGROUND STORAGE TANKS AT BUILDING 71 AND SITE 111 / 225 AT WASHINGTON NAVY YARD. SOIL BORINGS WILL BE ADVANCED TO A MAXIMUM OF 15 FT BELOW GROUND SURFACE. WELLS WILL BE INSTALLED TO A MAXIMUM DEPTH OF 13 FT BELOW GROUND SURFACE. SOIL BORINGS WILL BE BACKFILLED UPON COMPLETION. WORK PLAN HAS...
329 VIRGINIA AVE SE   
08/01/16 
CLAIRE C SCHAEFER / JOHN C. MYERS
P1608301 / SUPPLEMENTAL
385 WATER ST SE   
08/12/16 
FC 385 WATER LLC / STEPHEN J. EXELBERT
P1608654 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.