I'm a week or so behind on this, but, honestly, I've moved slowly because I just can't believe that only now is the beautiful Beaux Arts WASA O Street Pumping Station being moved through the city's historic landmark designation process.
That wasn't the only neighborhood decision on the board's agenda. The HPRB also approved on its consent calendar Forest City's plans for rehabbing the Lumber Shed at the Yards Park, about which I've written much during its trip through the ANC and Zoning processes. |
Comments (2)
|
On Monday night, the city's Zoning Commission had its first crack at the new request for modifications to the existing Planned Unit Development (PUD) for the Florida Rock site across the street from Nationals Park, as the commissioners deliberated on whether to "set down" the request for a hearing. As mentioned previously, the developers want to change the site's first phase from office to residential, and also have done some reworking of the rest of the design for the six-acre site that the Zoning Commission approved after much deliberation and tweaking back in 2008.
Commissioner Peter May, on the other hand, said that he is actually more comfortable with the new design, given that there were features he "really questioned" in the 2008 design, but that the latest filing is "pretty simplistic" in terms of the drawings, and did say that the architecture is "kind of boring," especially from the waterside view. (The image at right is the Phase 1 residential building, as seen from the river.) He also wanted to see more comparisons to the previously approved design so that they could understand more what they may be giving up with the new design, but that he found the overall plan "more appealing than before."
With the entire filing available online (if you search), I was able to go through and cull out some of the most representative drawings from this new design, which I've put on my Florida Rock project page. At the bottom of that page you can also see some images of the designs that were approved in 2008. The first image at left, from 2008 (click to enlarge), shows the four buildings and the public spaces with a lot of curves and glass and "articulation."
Compare that to the latest design. While this is clearly a very early drawing, it does show four much more boxy structures, as commissioner Turnbull said. You can also see the curves-versus-corners differences in the site-plan comparison graphic I created, which also shows the differing layouts of the public spaces, again going from a lot of flowing, rounded paths and open areas to straighter-edged movements, with the total amount of "lot occupancy" going down to 44 percent in the new design from 58 percent in the old. The phase 1 apartment building is the most fleshed out in the renderings, but there are additional drawings giving a general sense of the site layout. |
Comments (10)
More posts:
Florida Rock, zoning
|
Park Tavern - This casual restaurant in the pavilion on the south block of Canal Park near M Street is aiming to be the city's first LEED Gold restaurant, thanks to a green roof, solar panels, and the various stormwater management aspects built into the park itself. And:
Willie's Brew and Que - A few blocks to the south, Cervera is waiting for Forest City to finish construction on the Boilermaker Shops renovation so that he (and other tenants) can then begin their build-outs. It will occupy the western end of the building, at 3rd Street (seen at right), where the full two-story space to the roof will be open. Details:|
Comments (8)
More posts:
Boilermaker Shops/Yards, Canal Park, Restaurants/Nightlife, parktavern, Retail, willies, The Yards
|
Residents at three of the neighborhood's "new" apartment buildings--the Jefferson and Axiom at 70 and 100 I Street, and the 909 New Jersey Avenue building, branded together as "Capitol Yards"--are reporting the posting today of public notices, along with e-mails from management, announcing that the buildings are under contract to be sold.
That paperwork says that the price of 100 I for any tenant organization that may form to purchase the 246-unit building would be $93,879,000; readers report that the number for 70 I (448 units) is about $165 million, and 909's price (237 units) is around $95 million, which presumably are all somewhere in the neighborhood of the contract sales prices.|
Comments (9)
|
Also, because I can't walk past the Boilermaker Shops without taking pictures, I added a few new shots to that page, including the panorama at right that I got from one of the Foundry Loft patios.|
Comments (1)
|
|
Comments (0)
|
There hasn't been much said so far about the restaurant planned for the Boilermaker Shops at the Yards by the Birch and Barley/Churchkey team, but the Post's All We Can Eat blog posted some morsels today:|
Comments (3)
|
This is little more than an off-topic I-want-to-try-it exercise, but after reading JD Antos's latest crunching of the Capital Bikeshare trip data that came out last week, I decided to see what it would be like to map the movements of a particular bike. |
Comments (1)
More posts:
Pedestrian/Cycling Issues
|
|
Comments (1)
|
From ground level, it's not especially easy to see (or photograph) the current state of Canal Park's construction--lots of fences, equipment, and bad winter sunlight, and the only above-ground action is hard to photograph through cyclone fencing. But on Thursday I got to see the progress from higher up, where not only is it easier to get a good overview of the site, but you can now see the outline on the southern block of both the plaza *and the ice rink*. (Shadows still wreaked some havoc, alas.) I added a number of these images to my Canal Park progress page, for your perusal.

* A series of strangely blue pictures I took from the roof deck at Onyx in October 2008, just as the building was opening;|
Comments (0)
More posts:
Canal Park, photos
|
While there has been lots of news over the past few months about Near Southeast getting some of the amenities that it has lacked for a long time (restaurants, grocery), one service that the neighborhood continues to be without is an open elementary school within walking distance. DC Public Schools closed Van Ness Elementary at 5th and M SE back in 2006 because of a lack of school-aged children in the neighborhood thanks to the emptying of the Capper/Carrollsburg public housing project in advance of its reconstruction as Capitol Quarter, but kept the building in its inventory knowing that eventually the neighborhood would fill back up and a school would again be needed.|
Comments (0)
More posts:
Van Ness Elementary
|

Uh oh, the old bat is bringing out the photo albums....|
Comments (5)
More posts:
JDLand stuff
|
|
Comments (2)
|
When word gets out that some new data set has been posted in an easily digestible format, I am pretty much helpless before its power. So I spent the Friday night of a holiday weekend knee deep in Bikeshare Trip History Data, culling out the |
Comments (4)
More posts:
Pedestrian/Cycling Issues, JDLand stuff
|
There were 15 properties that received reductions for their 2012 bills, totaling about $148 million. The big property owners managed a few hefty cuts, with JBG's US Department of Transportation building leading the way with a $47.7 million reduction to just under $615 million, followed by CSX's empty lots near the freeway north of I Street getting a $46.3 million haircut down to $66.2 million. Many of the other shiny new-ish buildings of the neighborhood also got their tallies reduced, such as apartment buildings 70/100 I and 909 New Jersey and office buildings 20 M, 55 M, 225 Virginia, and Maritime Plaza I and II. |
Comments (0)
More posts:
assessments
|
Developer William C. Smith is announcing today that the apartment project we've been referring to as 880 New Jersey will be called the Park Chelsea, and is expected to get underway sometime during the second quarter of this year. And there's even a rendering now, and an official web site.
Once started, construction should take about two years.|
Comments (9)
|
The meeting probably isn't even finished yet, but if you didn't (or did) stop by the first of DDOT's public meetings on their nine-month M Street SE/SW Transportation study, you can browse the presentation slides and take the stakeholder survey, already posted on the new web site for the project.|
Comments (2)
|

|
Comments (0)
|

|
Comments (0)
More posts:
Boilermaker Shops/Yards, Restaurants/Nightlife, Foundry Lofts/Yards, photos, Retail, The Yards
|