|
| ||||||||||||||||||||





Originally scheduled in February but delayed thanks to snow, the fundraiser at Nando's Peri-Peri for Van Ness Elementary in advance of the school's reopening this fall is now happening on Tuesday, March 24. |
Comments (2)
More posts:
Events, Van Ness Elementary
|
* BONCHON GETTING CLOSER: The paper is off the windows, so I was able to see where things stand at Bonchon--and it's looking well along. (Not pictured are the five or so boxes containing large flat-panel TVs.) |
Comments (2)
|
For those who missed out on my interim Facebook blogging on Monday....
In honor of now having renderings, I created a Parcel O project page--and while putting it together, I found the photo at right, showing the corner of 5th and Tingey from May, 2004, back when there was a 5th Street (such as it was).
This view matches the rendering at far right in the row of three. |
Comments (7)
|
|
Comments (6)
More posts:
JDLand stuff
|
|
Comments (8)
|
|
Comments (7)
|
|
Comments (10)
|

One block to the south, fences and equipment arrived at the parking lot on the northeast corner of Half and M, and this morning ground was being broken (for real, not ceremonially!) for what will become a 195-room Homewood Suites.
Speaking of which.... Fences went up Monday afternoon around the sidewalk on the west side of 1st Street south of M, generally along the boundary of the residential and hotel portion of the Grosvenor/McCaffery project currently referred to as Ballpark Square. No heavy equipment has arrived, and as I mentioned recently there's plans for a ceremonial groundbreaking in coming weeks, but fencing off the public sidewalk would seem to be a bit of a "tell."|
Comments (23)
More posts:
1015 Half, Homewood Suites, 801nj, One Hill South, bonchon, Development News, F1rst Residential/Hotel
|
At Monday night's ANC 6D meeting, Monument Realty presented to the commission an early look at revised plans for the company's One M Street site on the southeast corner of South Capitol and M streets (i.e., the old Domino's site). |
Comments (7)
|
Not quite six months after buying the land on the northeast corner of Half and N streets across from Nats Park currently known as Monument Valley, the MacFarlane/Jair Lynch joint venture has now submitted to the Zoning Commission its new plans for the site, a 10-story building with 461,700 square feet of residential (and possibly hotel) development, combined with at least 60,000 square feet of retail.
As in the original designs, there would still be a small street called "Monument Place" running between this building and its neighbor to the north, 55 M Street, allowing the retail offerings to wrap around onto the building's north side--however, in these new plans it would be a pedestrian-only street, negating the need for a curb cut on Half Street. |
Comments (13)
|
|
Comments (8)
|
With the western portion of the 5.5-acre Florida Rock site along the Anacostia River just south of Nats Park not likely to be built on for a number of years (thanks to that pesky little detail of needing to demolish the existing Douglass Bridge first), there are again plans being discussed to "activate" the area with an interim use, even while construction continues to the east on the project's first-phase apartment building.
In the meantime, work continues on the Riverfront, the 300-unit apartment building on the east end of the site, by Diamond Teague Park. This first phase construction will also see an expanded plaza between the building and Teague Park, a westward extension of the Anacostia Riverwalk Trail into the Florida Rock site, and an already planned temporary use space separating the brew garden/park from the new building, with some surface parking, a small green space, and "The Beach," a sand-covered spot with volleyball courts. The building is expected to be completed in 2016.|
Comments (11)
|
* AHEM: I've referenced this in a few unofficial places, but might as well just give it the full-on treatment. Recently Mr. JDLand was struck by a creative bolt of lightning (or perhaps was just tired of listening to me rant and rave), and presented me with the design at left. With tongue most firmly in cheek, I admit it cracks me up. If you would like to be among those making such a bold statement, the shirts are $12, available in S-M-L-XL. An in-person hand-off can probably even be arranged if you live within the general JDLand listening area. Shoot me a message if you are interested.|
Comments (5)
More posts:
11th Street Bridges, bridgepark, Events, Restaurants/Nightlife, peterchang, JDLand stuff, vida
|
|
Comments (1)
More posts:
Capitol Riverfront BID, Events
|
It looks like the exit ramp to 8th Street SE from westbound I-695 (inbound from the 11th Street Bridges) that has been MIA in recent months may soon be back in business.
This resulted in tasking my errand boy with some snowy photography, of not only the ramp itself (above), but also a hard-to-get shot of the new exit sign, surprisingly uncovered, on the freeway. You can see that the new exit goes underneath the no-longer-new ramp from 11th Street SE to the westbound freeway.|
Comments (1)
More posts:
11th Street Bridges, Traffic Issues
|
If your tastebuds are on the lookout for additional options in the neighborhood, tell them that I am hearing that Taylor Gourmet and Chop't are slated to be tenants in the pending Grosvenor-McCaffery-Skanska mega project along 1st Street SE between M and N currently dubbed Ballpark Square.*
All told, there will be about 45,000 square feet of retail across the project, with about 7,000 of it in the separate two-story 7,000 square feet retail building at the corner of 1st and N, also being developed by Grosvenor/McCaffery. |
Comments (16)
|
With possession and cultivation of small amounts of marijuana becoming legal in DC on Thursday, the Washington Post helpfully mapped out all of the federally owned tracts of land in the city, since pot possession will still most decidedly not be legal on federal land.
With unanimous agreement that the need to get former public housing residents back to the neighborhood is paramount, the Zoning Commission on Monday gave first approvals to the DC Housing Authority's request for flexibility in how it allocates 206 affordable units still to be built within the Capper/Carrollsburg PUD boundaries, while still being required to have no fewer than 15 percent and no more than 50 percent of the units on any square be affordable.|
Comments (54)
|
On Monday night the Zoning Commission gave final approval to first-stage plans for the Cohen Companies' 1333 M Street residential project, along with second-stage approvals for the development's first phase, a 10-story 218-unit building.
* The plan for a "place-making sign" on the building's penthouse had gotten Peter May up in arms at the Proposed Action stage, and so the developer came back with additional options. (If you click to enlarge the rendering at the top of this post, you can see up at the roofline a smidge of the BROOKLAND-like sign facing north.)

|
Comments (3)
|
From WBJ: "D.C. developer Akridge has sold the majority of its Half Street parcel across from Nationals Park to The JBG Cos., which is expected to redevelop the site with two new residential buildings and a large amount of what one executive called "dramatic" retail."
After Akridge acquired the site in 2008--which was once home to WMATA's Southeastern Bus Garage--plans were run through the Zoning Fun Factory for two office buildings on the north end of the site and a 280-unit residential building on the south end (along with 55,000 square feet of retail), but WBJ says that JBG's portion of the block is now expected to include two residential buildings, with one office building on the land Akridge still owns along M Street. Plus "dramatic retail."|
Comments (21)
|


























