|
| ||||||||||||||||||||





|
Comments (0)
More posts:
Nationals Park
|
I've just about reached my recommended yearly allowance of writing about the various Capper zoning requests that are pending right now, but there's a light at the end of the tunnel, since the hearing is finally being held Thursday night at 6:30 pm. If you've grown tired (as I have) of my haphazard attempts to describe exactly what's being requested, you can now pour through the Office of Planning report, which gives far more detail than I've ever attempted. Even if you don't want to know that much about it all, there's a pretty good map on page three of the report that details the plans for every block of Capper/Carrollsburg (though without any timelines for the future projects). I have a similar map on my main Capper page, but this one does add a lot of detail.|
Comments (0)
|
|
Comments (0)
More posts:
100 M, 20 M, 70/100 I, assessments, Capper, US Dept. of Transportation HQ, jpi, Maritime Plaza, Monument Valley/Half St., Onyx, Square 743N, Nationals Park
|
|
Comments (0)
|

|
Comments (0)
More posts:
Pedestrian/Cycling Issues, Nationals Park
|

|
Comments (0)
More posts:
Canal Park
|
With thanks to the folks at Akridge, I at last have some renderings of their planned 700,000-sq-ft mixed-use project on Half Street, which I've added to my project page and paired with the "before" photos of the same location. These are the plans that were approved by the Zoning Commission last month, and you can read my more detailed description of the project for additional information. Construction could begin in 2010.|
Comments (0)
|
|
Comments (0)
More posts:
1111 New Jersey/Insignia on M, 70/100 I, 900m, cornercopia, jpi, M Street, Retail, Square 743N, Nationals Park
|
|
Comments (0)
More posts:
JDLand stuff
|
|
Comments (0)
|
|
Comments (0)
|
|
Comments (0)
|
Last night the Zoning Commission unanimously approved Forest City's Phase 2 plans for the waterfront park at The Yards, which include three glass-enclosed pavilions offering 50,000-sq-ft of retail and a 60-foot "visual marker" at the edge of the water on the boardwalk. You can see more renderings and designs on my Yards Park page (scroll down a bit for Phase 2), and this National Capital Planning Commission report has a lot of information as well, with many of the same drawings that were presented last night. I described it all thusly a few months ago:
The storage shed, as I've mentioned in the past, will lose its faaaahbulous salmon-colored corregated skin and will be enclosed with non-reflective glass. The other two buildings (currently given the wonderfully descriptive monikers of P2A and P2B) will also be mainly glass structures. There will be a restaurant court in front of the center building, overlooking the area of the park that steps down toward the waterfront.
|
Comments (0)
More posts:
11th Street Bridges, meetings, Stadium Events, Traffic Issues, The Yards, Yards Park, zoning
|
|
Comments (0)
|

|
Comments (0)
|
|
Comments (0)
|


























