Since January, 2003
            
 (a random before-and-after moment)
November 24, 2006
October 5, 2014
2nd (East) at K, Looking East-Northeast (see more)

Last night the Zoning Commission unanimously approved Forest City's Phase 2 plans for the waterfront park at The Yards, which include three glass-enclosed pavilions offering 50,000-sq-ft of retail and a 60-foot "visual marker" at the edge of the water on the boardwalk. You can see more renderings and designs on my Yards Park page (scroll down a bit for Phase 2), and this National Capital Planning Commission report has a lot of information as well, with many of the same drawings that were presented last night. I described it all thusly a few months ago:
The "light tower," designed by James Carpenter Design Associates, is made up of stainless steel prisms that reflect light during the day and will be subtly illuminated at night. The top is actually 70 feet from the top of the water, but 10 feet of that is the boardwalk; the structure itself is only 60 feet high.
The storage shed, as I've mentioned in the past, will lose its faaaahbulous salmon-colored corregated skin and will be enclosed with non-reflective glass. The other two buildings (currently given the wonderfully descriptive monikers of P2A and P2B) will also be mainly glass structures. There will be a restaurant court in front of the center building, overlooking the area of the park that steps down toward the waterfront.
The commissioners were very complimentary of the designs, with only a bit of concern expressed about whether the tower (made of stainless steel prisms) was either a bit too small for its surroundings (commissioners Jeffries and Keating) or if perhaps its base was a little too plain (May and Turnbull). Turnbull was also concerned about sustainable design features of the pavilions, and, more succinctly, that the walls made all of glass would just make the buildings into "a very hot box." May also said that Forest City needs to come up with better names for the vertical marker and the retail pavilions, though he also dryly added he was "not advocating selling the naming rights."
The Office of the Deputy Mayor for Planning and Economic Development testified in support of the project, and the Office of Planning recommended approval--their staff report is worth reading for more details on the project and on the various zoning exceptions and speical requests Forest City was seeking. ANC 6D voted last month 6-0-1 to support the project, and there were no other witnesses either for or against the plans.
In the end, with the commissioners having made no requests for additional materials or clarifications, it was decided to take their vote immediately, and approval was given 5-0. Because this was a Southeast Federal Center Overlay Review, this was the only vote that will be taken.
The first phase, which is expected to begin construction in the next three months and be completed by mid-2010, is the basic layout of the park and the boardwalks. The third phase will be the piers and marina, which Forest City said last night is targeted for completion in 2012 or 2013.
Comments (6)
   
 
 More About Yards Park

JDLand.com Home

Comments

SG says: (3/3/09 12:20 PM)
Will the first phase include any retail? Is the "Boilermaker" shop still happening?


Jay says: (3/3/09 2:32 PM)
The light tower seems cool.

Does it have a purpose other than art?

A Hendrix re-do, all along the light tower - groan....







JD says: (3/3/09 6:15 PM)
SG: haven't heard of any moving forward on the Boilermaker Shops--the mid-2010 opening date was the last I heard.

Jay: No purpose except public art. Just something to ooh and ahh over.


NatsFan says: (3/3/09 8:17 PM)
How can they start planning on Phase 2 of The Yards if work has just been stopped at the Lofts section in Phase 1 of The Yards for financial reasons?


JD says: (3/3/09 10:16 PM)
The park is just one part of phase one at the 1ards, and it has three phases of its own. it also has a separate funding source. and the park's second phase is probably still a couple years away.


G St. says: (3/6/09 12:16 PM)
Like the *light tower*... cue the music from 2001: A Space Odyssey!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News
  

RMP on Cosmopolitan Nail Lounge: Residence Inn has rates loaded on the Marriott website. Looks like the first dat...
snakegriffin on Eighteen Eight 'Fine: FYI, there are a couple of new (new to me, at least) renderings up here:
conngs0 on Cosmopolitan Nail Lounge: Yep, there are pluses and minuses to all big projects, and I agree with 202 that...

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/13/17
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/08/17
100 B/O K ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/06/17
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/02/17
700 B/O M ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 12/30/16
400 B/O M ST SE   THEFT
Theft First Degree (shoplifting)
 12/26/16
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle) - Highway/ Road/ Alley/ Street/ Sidewalk
 12/20/16
70 B/O I ST SE   THEFT FROM AUTO
Theft (theft Of Motor Vehicle Parts Or Accessories)
 12/19/16
500 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/18/16
1000 B/O 7TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/18/16
900 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/17/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/16/16
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 12/15/16

Recent Issued Building Permits Archive  
1100 2ND PL SE   
12/28/16 
LIDIA BARDI SQUARE 769N OWNER, LLC / LIDIA BARDI SQUARE 769N OWNER, LLC; GEORGE KING MORETRENCH AMERICAN CORPORATION
SB1700048 / CONSTRUCTION
Drill and construct three 6 inch diameter dewatering wells within 12 inch boreholes to 70 feet below existing grade via mud rotary drilling methods. Drill and construction 2 - 2 inch diameter observation wells within in 8 inch boreholes to 60 feet below existing grade via mud rotary drilling methods. All drill spoils will be contained, tested and disposed of per DOEE regulations.
2 I ST SE   
12/27/16 
MCDONALDS CORPORATION / MCDONALDS CORPORATION; ECS MID-ATLANTIC LLC
SB1700081 / CONSTRUCTION
ECS proposes the installation of six soil borings to a maximum depth of 30 feet below ground surface. Each boring will be completed with a Geoprobe drill rig and grounted following installation using a DOEE approved grount mix.
28 K ST SE   
12/28/16 
23 LLC / RELATED COMPANIES; ACCUPERMIT LLC; ACCUPERMIT LLC
SG1700100 / CONSTRUCTION
Sign / mural to be on west elevation of new commercial building at 28 K Street SE. Temporary only for 12 months.
100 M ST SE   
12/28/16 
SQUARE 743 INC / null
E1702426 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 20024   
12/30/16 
JBG/FEDERAL CENTER LLC / CARL E HAGER
E1702487 / SUPPLEMENTAL
   
01/04/17 
JBG/FEDERAL CENTER LLC / null
P1702555 / SUPPLEMENTAL
1244 SOUTH CAPITOL ST SE   
01/05/17 
EXTREME STEEL CRANE AND RIGGING
AH1700321 / CONSTRUCTION
PLACE CRANE ON S. CAPITOL STREET TO PUT TOWER CRANE UP.
385 WATER ST SE 20003   
12/28/16 
FC 385 WATER LLC / STEPHEN J. EXELBERT
P1702437 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2017 JD.