Last night the Zoning Commission unanimously approved Forest City's Phase 2 plans for the waterfront park at The Yards, which include three glass-enclosed pavilions offering 50,000-sq-ft of retail and a 60-foot "visual marker" at the edge of the water on the boardwalk. You can see more renderings and designs on my Yards Park page (scroll down a bit for Phase 2), and this National Capital Planning Commission report has a lot of information as well, with many of the same drawings that were presented last night. I described it all thusly a few months ago:
The "light tower," designed by James Carpenter Design Associates, is made up of stainless steel prisms that reflect light during the day and will be subtly illuminated at night. The top is actually 70 feet from the top of the water, but 10 feet of that is the boardwalk; the structure itself is only 60 feet high.
The storage shed, as I've mentioned in the past, will lose its faaaahbulous salmon-colored corregated skin and will be enclosed with non-reflective glass. The other two buildings (currently given the wonderfully descriptive monikers of P2A and P2B) will also be mainly glass structures. There will be a restaurant court in front of the center building, overlooking the area of the park that steps down toward the waterfront.
The commissioners were very complimentary of the designs, with only a bit of concern expressed about whether the tower (made of stainless steel prisms) was either a bit too small for its surroundings (commissioners Jeffries and Keating) or if perhaps its base was a little too plain (May and Turnbull). Turnbull was also concerned about sustainable design features of the pavilions, and, more succinctly, that the walls made all of glass would just make the buildings into "a very hot box." May also said that Forest City needs to come up with better names for the vertical marker and the retail pavilions, though he also dryly added he was "not advocating selling the naming rights."
The Office of the Deputy Mayor for Planning and Economic Development testified in support of the project, and the Office of Planning recommended approval--their staff report is worth reading for more details on the project and on the various zoning exceptions and speical requests Forest City was seeking. ANC 6D voted last month 6-0-1 to support the project, and there were no other witnesses either for or against the plans.
In the end, with the commissioners having made no requests for additional materials or clarifications, it was decided to take their vote immediately, and approval was given 5-0. Because this was a Southeast Federal Center Overlay Review, this was the only vote that will be taken.
The first phase, which is expected to begin construction in the next three months and be completed by mid-2010, is the basic layout of the park and the boardwalks. The third phase will be the piers and marina, which Forest City said last night is targeted for completion in 2012 or 2013.
Comments (6)
   
 
 More About Yards Park

JDLand.com Home

Comments

SG says: (3/3/09 12:20 PM)
Will the first phase include any retail? Is the "Boilermaker" shop still happening?


Jay says: (3/3/09 2:32 PM)
The light tower seems cool.

Does it have a purpose other than art?

A Hendrix re-do, all along the light tower - groan....







JD says: (3/3/09 6:15 PM)
SG: haven't heard of any moving forward on the Boilermaker Shops--the mid-2010 opening date was the last I heard.

Jay: No purpose except public art. Just something to ooh and ahh over.


NatsFan says: (3/3/09 8:17 PM)
How can they start planning on Phase 2 of The Yards if work has just been stopped at the Lofts section in Phase 1 of The Yards for financial reasons?


JD says: (3/3/09 10:16 PM)
The park is just one part of phase one at the 1ards, and it has three phases of its own. it also has a separate funding source. and the park's second phase is probably still a couple years away.


G St. says: (3/6/09 12:16 PM)
Like the *light tower*... cue the music from 2001: A Space Odyssey!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2016!
 Top News
  

conngs0 on Signs and Wonders: I couldn't argue with anyone who is skeptical about the cost projections for the...
Chaifetz10 on Two-Year Change in: Have a random question for anyone and everyone here as 1) It's technically outsi...
JD on Signs and Wonders: {pointed silence}
202_cyclist on Signs and Wonders: Another blog has a post about the 11th Street bridge park ( ). I think this is ...

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/17/16
1000 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 08/16/16
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/16
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/14/16
16 B/O M ST SE   ROBBERY  08/12/16
1000 B/O 5TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/09/16
1200 B/O 1ST ST SE   THEFT
Theft First Degree (shoplifting)
 08/08/16
50 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/02/16
600 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/02/16
700 B/O L ST SE   ROBBERY  08/01/16
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/29/16
700 B/O L ST SE   ROBBERY  07/28/16

Recent Issued Building Permits Archive  
1150 5TH ST SE 20002   
08/11/16 
ALAN J PHELPS / DOUGLAS FOSTER
B1509540 / CONSTRUCTION
1. Renovation of existing first and second floor of the academic wing of the Van Ness building. 2. Square footage is approximately 26,000 SF ,For phase 1 3. Cost of construction is 11.5M 4. Scope of work details a. Convert existing space in to 6 new classroom space. These classrooms will be two PreK -3, two prek-4, and two Kindergarten classes. Also for phase 1,...
1150 5TH ST SE   
08/12/16 
DISTRICT OF COLUMBIA / JOHN HOMICK
E1609156 / SUPPLEMENTAL
   
08/12/16 
DISTRICT OF COLUMBIA / MATT LOSIGNOR
P1608656 / SUPPLEMENTAL
   
08/12/16 
DISTRICT OF COLUMBIA / ORLANDO M CATANA
E1609149 / SUPPLEMENTAL
82 I ST SE   
08/15/16 
GDCV EYE STREET LLC / GDCV EYE STREET LLC; KIM MITCHELL CDKM CONSULTING LLC
B1611941 / CONSTRUCTION
FIRST EXTENSION TO PERMIT B1507990 TO EXPIRE ON 3 / 17 / 17
   
08/15/16 
CSX TRANSPORTATION INC / BEDCO MOBILITY INC.
EN1602806 / SHOP DRAWING
Type of Elevator : One (1) vertical wheel-chair lift / steel / garage level 2 / handicap lift (13th floor)
125 L ST SE   
08/11/16 
CRANE SERVICE CO / CRANE SERVICE CO; CHRISTINE LONG
AH1600945 / CONSTRUCTION
An after hours permit is respectfully requested from 4AM Saturday thru 9PM Sunday
80 M ST SE 1   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608566 / SUPPLEMENTAL
80 M ST SE 2   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608568 / SUPPLEMENTAL
80 M ST SE 3   
08/10/16 
WELLS REIT II 80 M STREET LLC / THOMAS B. STEG
P1608569 / SUPPLEMENTAL
100 M ST SE PT OF 4TH   
08/11/16 
QUARE 743 INC . / QUARE 743 INC .; JOHN GIUSEPPE-RAMCO
B1611810 / CONSTRUCTION
renovation to parts of an existing 4th floor office space, tech marine business as shown on the attached mech., plumb., elect., fire protection, demolition, and arch. dwgs. interior work only. no change in use. no struct. work. 800 sf.
300 M ST SE   
08/06/16 
FGSF TEST
PC92978992 / POST CARD
Installation of 1 temporary construction trailer on private property.
   
08/06/16 
SDS SDSDS / LAVANYA SIKHINAM; SDS SDSDS; ENRIQUE LYON
E90011839 / SUPPLEMENTAL
   
08/07/16 
XVB XVBX / FSGVSF SFGS; XVB XVBX; DAVID FARMER
E77515115 / SUPPLEMENTAL
909 NEW JERSEY AVE SE 1311   
08/11/16 
null / NA NA NA
EHOP1690902 / HOME OCCUPATION
861 NEW JERSEY AVE SE   
08/09/16 
NA CSX TRANSPORTATION, INC.
AH1600944 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1111 NEW JERSEY AVE SE   
08/11/16 
null / THOMAS P MCGUIRE
E1609117 / SUPPLEMENTAL
385 WATER ST SE   
08/12/16 
FC 385 WATER LLC / STEPHEN J. EXELBERT
P1608654 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2016 JD.