peek >>
Near Southeast DC Past News Items: 2ist
In the Pipeline
1000 1st St.
Yards/Parcel L
The Garrett
Square 696
Yards/Icon Theater
1000 South Capitol
25 M
Chiller Site Condos
Yards/Parcel A
1333 M St.
New Douglass Bridge
More Capper Apts.
250 M St.
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


7 Blog Posts Since 2003

Sunday morning brought a confluence of a clear calendar, clear skies, and a sort-of-unexpected desire to "get back to work," such as it is, so I took a long walk to get the JDLand camera caught up with the goings-on in the neighborhood. Here's the rundown:
* UPWARD: The biggest news (for me, anyway) is that at last the 99 M office building project has peeked up above ground-level. Also worth getting excited about is seeing the structural steel going up for the new DC Water headquarters along the banks of the Anacostia.
* DOWNWARD: There's digging underway (or about to be) in multiple locations, and the camera peeked past the fences to check out the holes. In order, may I present the current state of: the former McDonald's site at 2 I Street (where a 380-unit apartment building will rise), the Yards Parcel O site at 4th and Tingey (where a joint condo/apartment project has been slooowly underway thanks to the need to dig very carefully when it's an old munitions site), the mixed-income Capper apartment building at 3rd and L, and the JBG West Half residential project directly north of Nats Park.
(I missed the hole at South Capitol and M where the new NAB headquarters and the 10 Van residential building will rise, but it probably doesn't look all that much different from this.)
Then there's the Half Street Hole, where work does appear to be underway, but since excavation was done in 2007, it's kind of hard to tell what's new (I should have gone up to the Hampton Inn roof). Finally, there's the lot at Half and L where fences recently went up around the site that will be Phase II of the Parc Riverside apartment building, but while some dirt has been turned, heavy equipment isn't quite yet on site.
So, if you are counting, that is eight additional projects that will rise out of the ground in the coming year or so, along with the four others that are already above ground but not done.
* OUTWARD: Vertical construction has been finished for a while at the residential building 1221 Van just north of the ballpark, but exterior work has progressed since I last wandered by. And ditto for the District Winery building at 4th and Water.
* ONWARD: Some additional catching up.
And there are going to be lots of other "for the historical record" photos that have been needed to be taken for some months added to various project pages in coming days. Just click around from the main map--you'll never know what you might find.
Coming Soon, a Coming Soon post.
 

While I was on the roof of F1rst earlier this week, the view to the west was striking. Immediately north of Nats Park, with the long-forlorn block of Half Street between the Center Field Gate and the Metro station running down the middle of the frame, my camera spied:
* The first piles being driven for JBG's West Half residential and retail project;
* Some evidence of initial activity at Monument Valley, where Jair Lynch's 1250 Half Street residential and retail project is set to finally fill in the hole that has existed on the east side of Half Street since 2007; and
* Shoring/sheeting/excavation underway on the southern part of Monument's combination project of the new headquarters for the National Association of Broadcasters and a residential building at 10 Van Street (here's a closer shot).
Here's what West Half, 1250 Half, and the NAB HQ will look like when they are finished, perhaps in very late 2018 or probably 2019:
These three projects join the other buildings that complete the N Street lineup across from the ballpark--JBG's under construction apartment building at 1221 Van (at the upper left of the above photo) and the Hampton Inn that's been open at 1st and N since late 2015.
What this means is that we will now move from nine years' worth of complaining about how nothing has been built directly north of Nats Park to two years of complaining about construction noise and ickiness, leading into the inevitable future complaining about how these new buildings with all of the retail people have complained about not having end up ruining what views remained of the Capitol dome from inside the ballpark.
Progress!
And these are not the only projects just getting started. Piles have also been driven for the DC Housing Authority's latest Capper Hope VI mixed-income apartment building at 3rd and L, and digging is well underway for the new apartment building at the old McDonald's site at 2 I St., which I don't actually have a recent photo of and so one from February will have to do. I suck. Plus, digging sloooowly continues at the Yards Parcel O apartment/condo dual project.
On the bright side, we're about to have a long-watched hole finally graduate to above-ground construction, as Skanska's 99 M office building is at last reaching street level.
With the completions in 2016 and early 2017 of eight apartment buildings, and with eight more buildings looking to join them in the next two years, the neighborhood now has what can not-so-charitably be called a "glut" of new apartments, as Bisnow reported last week in its story on how the city is seeing a record number of residential units deliver in the second quarter of 2017. (I should of course give you hard numbers of total units, but see my earlier comment about my current state.)
However, if you are looking for a place to live in Near Capitol Ballpark River Yards, having multiple buildings vying for your business is certainly good news for you.
 

As first reported by commenter NJAve late yesterday, and then confirmed on Twitter (with photographic evidence) by another reader, the McDonald's at South Capitol and I Streets, SE, is closing today, Tuesday, Dec. 13.
It was about 14 months ago that word first started filtering out about plans to redevelop the site, and in early 2016 the designs were unveiled for a two-phase project starting with a 380-unit apartment building at the corner of South Capitol and I. A raze permit has been filed for, and excavation and foundation permits are currently in process.
Until such time as McDonald's decides to deign the neighborhood south of the freeway with its presence again, the closest outlet for Big Macs, Egg McMuffins, and the best fountain Diet Coke on the planet is at 4th and C, SW (though 15th and Pennsylvania SE is the closest drive-through, and perhaps the one in Crystal City on Route 1 is the quickest-closest).
See my 2 I project page for more renderings, and photos. And maybe I'll throw this one out, for one last time. ("One last time / Relax, sit and have a Diet Coke with me / One last tiiiimmmeee.....")
Comments (17)
More posts: 2ist, Restaurants/Nightlife, mcdonalds
 

I suspect this will bring about some strong feelings, but it is still incumbent upon me to report that a raze application has been filed in recent days for the McDonald's at South Capitol and I Streets.
This is where RCP Development is planning a two-phase project that will start with a 380-unit apartment building.
I know nothing about any expected closing date for Mickey D's, which was just renovated in 2012. But I have heard rumors that the developers are looking to start construction on the apartment project late this year, and this raze application would certainly seem to be in line with that.
As a devotee of McDonald's fountain Diet Coke, I am willing to go on record in saying that this pains me.
Comments (26)
More posts: 2ist, Development News, mcdonalds
 

With a Board of Zoning Adjustment hearing coming soon (as now advertised), the developers planning a residential project on the site where McDonald's currently provides (among other items) tubs of Diet Coke to addicted bloggers have submitted some revisions to the design first seen back in October. The original version is on the left, the new submission on the right:
While there is no change to the overall "program"--a first-phase apartment building with about 380 units and around 2,700 square feet of retail, plus a second phase with either another 170ish apartments, or condos, or maybe even a hotel--there have been some "enhancements and modifications" in response to comments from ANC 6D at its December meeting, including revising the facade facing South Capitol Street and adding glass balconies to the southwest and northwest corners of the building.
They've also revised the rendering of the entranceway (original here, new one seen below). I'm also including the floor plan of the ground floor to show where the "phases" will be, as well as how the interior driveway/courtyard is laid out.
The BZA hearing is February 9.
Comments (13)
More posts: 2ist, Development News
 

Of all the "old" lots in the neighborhood, one that never really seemed to enter into the discussions of "will it get redeveloped?" has been the McDonald's lot on the northeast corner of South Capitol and I Streets, SE. But lo and behold, RCP Development (the company behind the under-construction apartment building at 82 I/801 New Jersey) has filed plans with the Board of Zoning Adjustment for a two-phase residential building with a total of 558 apartments.
(RCP doesn't actually own the land, but is listed with Crescent Communities LLC as "Contract Purchaser/Development Team," and there is a letter from McDonald's authorizing RCP and Crescent to "represent the Property owner" in all BZA proceedings. McDonald's has owned the land since 1985.)
The first phase would run along South Capitol Street and turn toward the east in an L-shape, paralleling the Southeast Freeway. Tthe second phase would be a tower built to the east, with a glass walkway structure connecting it to the first tower along I Street, and with an open courtyard and driveway (as seen below).
The filings show only about 3,200 square feet of retail at the building's southwest corner. (No word as to whether McDonald's would return, though I note that the rendering above shows a "bank" in that space.) The architect is SK&I.
(As for that Southeast Freeway ramp shown just to the west of the proposed building in the top rendering, it is slated to eventually go away as part of a not-yet-funded not-yet-scheduled later phase of the South Capitol Street reconstruction, with cars instead turning left onto a ramp at a location under the freeway about where Nats Lot HH currently is.)
More as I get it, clearly.
UPDATE: One or two additional tidbits: the first-phase building would be about 380 apartments--the second phase could be more apartments, or condos, or a hotel, at this point undetermined. Also, it's worth keeping in mind that the design in the renderings is a pretty early one.
Comments (31)
More posts: 2ist, Development News, mcdonalds
 

Never let it be said that I have completely abandoned my mission.
South Capitol and I Streets, SE. At left, August 14, 2005; at right, November 11, 2012.
Thank you, drive through.
 




                  © Copyright 2017 JD.