Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: districtwinery
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


5 Blog Posts Since 2003

Sunday morning brought a confluence of a clear calendar, clear skies, and a sort-of-unexpected desire to "get back to work," such as it is, so I took a long walk to get the JDLand camera caught up with the goings-on in the neighborhood. Here's the rundown:
* UPWARD: The biggest news (for me, anyway) is that at last the 99 M office building project has peeked up above ground-level. Also worth getting excited about is seeing the structural steel going up for the new DC Water headquarters along the banks of the Anacostia.
* DOWNWARD: There's digging underway (or about to be) in multiple locations, and the camera peeked past the fences to check out the holes. In order, may I present the current state of: the former McDonald's site at 2 I Street (where a 380-unit apartment building will rise), the Yards Parcel O site at 4th and Tingey (where a joint condo/apartment project has been slooowly underway thanks to the need to dig very carefully when it's an old munitions site), the mixed-income Capper apartment building at 3rd and L, and the JBG West Half residential project directly north of Nats Park.
(I missed the hole at South Capitol and M where the new NAB headquarters and the 10 Van residential building will rise, but it probably doesn't look all that much different from this.)
Then there's the Half Street Hole, where work does appear to be underway, but since excavation was done in 2007, it's kind of hard to tell what's new (I should have gone up to the Hampton Inn roof). Finally, there's the lot at Half and L where fences recently went up around the site that will be Phase II of the Parc Riverside apartment building, but while some dirt has been turned, heavy equipment isn't quite yet on site.
So, if you are counting, that is eight additional projects that will rise out of the ground in the coming year or so, along with the four others that are already above ground but not done.
* OUTWARD: Vertical construction has been finished for a while at the residential building 1221 Van just north of the ballpark, but exterior work has progressed since I last wandered by. And ditto for the District Winery building at 4th and Water.
* ONWARD: Some additional catching up.
And there are going to be lots of other "for the historical record" photos that have been needed to be taken for some months added to various project pages in coming days. Just click around from the main map--you'll never know what you might find.
Coming Soon, a Coming Soon post.
 

These days I'm generally the last person laying eyes on something new in the neighborhood, but I still find it necessary to conduct photo documentation when the calendar and forecast align. Which they did on Sunday.
Let's look at signs and entrances, starting first at F1rst and its Residence Inn, where it looks like the homestretch has been entered (click to enlarge, of course):
Then, let's go over to 4th Street, where the District Winery building continues to zip along. It's also where the Bower is now signed, as is Conte's space in Arris:
Then we'll double back westward (you're getting a sense for how far I walk on these excursions), taking a look at the new sidewalk on New Jersey Avenue in front of Insignia on M. Shake Shack's signage at the Homewood Suites, and the One Hill South entrance (very New York, isn't it). (I caught the Bethesda Bagels signage back in December, just in case you think I'm missing it.)
I even caught the view from the bridge of the new Bardo beer garden at Florida Rock, with a few hardy souls in attendance. Plus, views of both Agora on New Jersey Avenue (aka the Whole Foods Building) and 1221 Van (aka That Big Building On South Capitol Immediately North of the Ballpark):
All the links above to project pages have additional brand spanking new pics, and of course Before photos.
Next up, checking out holes in the ground, both current and coming soon.
 

The photo from the 300 block of Tingey St. SE says it all--"fine men's salon" Eighteen Eight is apparently coming to the former leasing office space in the ground floor of the Foundry Lofts at the Yards.
This would be the second DC opening for the company, joining its 14th St. NW location (along with one in Bethesda and two others in Maryland).
In addition to haircuts, 18|8 offers face, scalp, and nail treatments, shaves, waxing, and coloring; there are also grooming party packages for when you guys want to get with your buddies and get all gussied up.
It's Tingey Street's second grooming outlet, joining the Bang Salon one block to the east. (Too bad Unleashed doesn't offer grooming, otherwise there'd be a Tingey trifecta.)
No official word on when it will open, so don't let your hair get too long while waiting.
Meanwhile, one block to the south, the new District Winery building is getting its face on.
(h/t to reader RMP for the 18|8 sighting)
Comments (4)
More posts: districtwinery, eighteeneight, Foundry Lofts/Yards, Retail, The Yards
 

Rumored a few months ago after a liquor license application appeared in the pipeline, it's officially being announced today by Forest City Washington that the owners of Brooklyn Winery will be opening DC's first "urban winery" in a new 16,000-square-foot pavilion on the southwest corner of 4th and Water Streets SE in the Yards Park.
It will be named District Winery, and is to "feature the most popular components" of the Brooklyn version--it will be a full-service restaurant, and will also have a wine tasting area, a private events space with an open-air terrace, and, "of course, an impressive collection of wines, crafted and aged onsite." The Brooklyn operation is also apparently a quite popular venue for weddings.
The new pavilion's design will apparently be quite a wood-and-glass look that will echo the nearby Lumber Shed and the Yards Park itself. When I wrote about the rumors back in May, I included some 2009-era imaginings of what the pavilion could look like from when the Yards Park was going through its approvals process, but my understanding is that the design has evolved considerably, with District Winery's input. (No new renderings are being made available just yet, however.)
Forest City says it expects to start construction in the spring of 2016 and that the winery would open in the fall of 2017.
Comments (19)
More posts: districtwinery, Restaurants/Nightlife, Yards Park
 

A Friday afternoon post over at City Paper's Young and Hungry site broke the news of a liquor license application for a "multipurpose facility" by the name of District Winery, saying that it would have "450 seats (with a total capacity for 750) plus dancing, a 100-seat summer garden, and a wine pub."
And that it would be at 385 Water St., SE.
Which is pretty cool news, except that right now there is no building with an address of 385 Water St., SE.
There were theories that it would be the first hint of retail leasing in the under-construction Arris, which is indeed in the 300 block of Water, but is on the north side of the street and so would have to be an even-numbered address.
The Lumber Shed is 301 Water--if all of the retail spaces in that building weren't spoken for, the notion of just a fat-fingering of the address could have been assumed.
But, 385 Water... Hmmm....
Many of you may not have been around back in 2009 when Forest City received approvals for its plans for Phase 2 of the Yards Park. This included approving the remaking of the Lumber Shed as a glass-enclosed retail pavilion--and also included the plans for two additional retail pavilions on what is now open lawn space between the Shed and 4th Street SE.
The drawings you see here are from 2009 and have actually been on my Yards Park and Lumber Shed pages since then--they show various views of all three pavilions, including a view from a deck on the easternmost pavilion looking toward the west with the Shed and other pavilion visible. (Click to embiggen.)
The larger, eastern pavilion, dubbed P2B (because this is Parcel P) would have a footprint of about 10,300 square feet, while the smaller middle one's footprint would be about 6,300 square feet. Each of them would be less than 40 feet high and would have "open roof terraces on the second story for outdoor dining." And, as the drawings show, they would have much the same glass-and-concrete look as the Lumber Shed does.
And it could certainly be possible that the larger eastern one could have an address of 385 Water Street. And it looks sizeable enough for a venture looking for 450 seats with capacity for 750, plus dancing.
Forest City, as always, makes no comment on tenant-related information when there is no signed lease. And so it's also interesting that District Winery (which City Paper says appears to be from the same folks behind the Brooklyn Winery in New York) has made the move to apply for a liquor license before any lease has been signed.
We Shall See on all of this, including what any potential timeline might be for the construction of one or both of these new pavilions, but at least it means there would appear to be some definite leasing interest for these spaces. Either that or I am terribly off base with all this pondering.
UPDATE: All that pondering, and I could have just read that yes, it is indeed a new building being planned."Plans are still in the early stages, putting an opening at least two years away[.]" (h/t @JES)
Comments (15)
More posts: districtwinery, Restaurants/Nightlife, Lumber Shed/Yards, Yards Park
 




                  © Copyright 2024 JD.