Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Maren Apts.
See JDLand's Maren Apts. Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


3 Blog Posts Since 2003

First, summer was hot, then it was really hot, then the Nationals were hot, then the Nationals were REALLY hot, and suddenly it's November and the JDLand camera has been crying out from neglect. But I took care of that this weekend (oh boy, did I), and wanted to catch up on the latest downward digging and upward construction.
Let's start by peeking through some fences to look at the digging portion, where excavation is now underway at New Jersey/Canal and N/Tingey on the first office building to come to the Yards, which will be the headquarters for Chemonics International. (Yes, it's the project that chased the Trapeze School down to 5th Street.) The other two digging locations are Lerner's residential building at 1000 South Capitol and the CSX East site on New Jersey Avenue just south of the freeway, where a hotel and 800 units of residential will be coming. In order:
Next, we have three buildings that are above ground but not yet topped out. We'll start with the reconstruction of the Capper Seniors building at 5th and Virginia, which started just a smidge more than one year after the fire. With the pad not needing to be redone and the concrete-encased stairwells still standing, it isn't taking long for the wood-based construction to look familiar. (It is an odd thing to be watching the same building go up twice, 14 years apart--the first photo below was taken on Nov. 28, 2005, then after the fire in Sept. 2018 and March 2019, and now ).
The other skeletons are the new headquarters of the District Department of Transportation at 3rd and M Streets, which at this time of year can only been seen in sunlight for about one hour, from the west.. A few blocks away, on L Street between South Capitol and Half, the neighborhood's first "sliver" residential building (condos!) at 37 L is now a few floors away from its roof.
Beyond that we have a mere, oh, 12 additional projects that are topped out but not finished. Three of them are getting their faces put on (DC Crossing, Meridian on First, and One Hill South Two):
The rest have long since stopped looking particularly different while they plod toward completion, but there are updated photos on their project pages if you wish to see some. And yes, I'm looking at you, Thompson hotel and Estate apartments, Parc Riverside Phase 2, NAB HQ, Avidian, The Kelvin, Envy, the Garrett, and the Maren.
Now I'll turn my attention finally getting caught up on sliders. Wheeeee!
 

Losing track of which project is which? Time for another photo tour....
First, let us welcome the two new skeletons now above ground level, the Maren on Potomac Avenue and Paradigm's project at 1000 1st St., SE, both of which are apartment projects:
(Tishman Speyer's massive Square 696 residential project is just now starting to peek up, but didn't make the above-ground cut this time.)
It's a sign that the frantic construction pace of the past two years that we only have three projects coming out of the ground, and only one where excavation is stlll underway (One Hill South 2). A breather will be nice.
That said, there are still nine other projects that are in the getting-their-faces-on stage of construction. So let's look at the National Association of Broadcasters HQ (and its sibling Avidian condos to the rear) at South Capitol and M, the Funnel on Half Street (aka West Half), the combo project of the Estate apartments at 3rd and Water by the Yards Park and a Thompson hotel at 3rd and Tingey (shown in closeup because I dig the windows), the second phase of Novel South Capitol, Parc Riverside Phase 2 at Half and L, and the Garrett at 2nd and K. The last photo in the bunch is 1250 Half, which is both a still-rising skeleton on its southern end and a face-being-put-on project on its northern end, completely mucking with my flow.
(Follow the links to the project pages for details--I've already written enough words this week!)
Still under construction as well are residential projects the Harlow and the Bower condos/Guild apartments, but I didn't take any updated photos because their exterior work is mostly done. Plus I might have collapsed.
Tired out by this? Now you know why I for the first time grabbed a scooter to cover all of the territory.
But I also used my newfound scooter freedom to get some sorely needed shots at the far edges of the JDLand coverage area. Here are my first photos of the work on the new Douglass Bridge, as seen from the old Douglass Bridge (and no, that platform is not the new bridge), as well as a picture of the Emblem on Barracks Row condo building at 8th and Virginia, now completed despite my having almost completely ignored it during its construction:
Speaking of the new Douglass Bridge, if you go to the official web site and scroll down to Project Gallery, you will see what I think is a new animation of the new bridges and ovals and whatnot.
As for what's on the boards to get underway in 2019, I'd say that the most likely contenders are the new DDOT HQ at 250 M and Lerner's 1000 South Capitol Street residential building, and maybe one other I will write about soon. As for others? We Shall See.
I also belatedly have added the GSA warehouse at 49 L to my Demolished Buildings Gallery, as #181. That's a lot of demo.
 

It would be terribly hokey for me to say something along the lines of, "It's almost Halloween, and the neighborhood is appropriately decked out with skeletons." So, I won't. But there is a whole lot of construction going on, counting not only nearly finished buildings, but also buildings getting their faces put on or heading toward topping out or now "going vertical" below ground level.
I'll go in order from newest to oldest, starting with peering down into holes that you might not be looking into yourselves.
Three residential projects that began excavating in the spring are already starting to climb upward, as you can see in the above photos from 1000 1st Street and the Maren at Florida Rock. Tishman Speyer's mystery residential project that covers all of what's known as Square 696 is a hybrid, with some excavation still underway while the eastern half is now starting to rise. (and no, we still don't have renderings.) Then there's phase two of One Hill South (Two Hill South? One Hill South Two? Return of One Hill South? One Hill South, Electric Boogaloo?), where digging is being hampered by complaints of fumes emanating from the site's past life as a gas station.
Next we turn to the neighborhood's EIGHT projects that are above ground but not yet topped out. (I could call it six, since there are two projects with two buildings going up concurrently, but let's call an eight an eight.)
Let's start with residential projects The Garrett at 2nd and I, Parc Riverside Phase II at Half and L, and the second phase of Novel South Capitol at 4 I, which was kind of a shocker to see go up since it was never really announced that the entire project would be under construction at once:
I'll note that the photo of the Garrett is a bit of a triumph, because it's the first one I've gotten from the northeast, now that the wrapping up of tunnel construction has given me some sidewalk access to the intersection at 2nd and H. (Which hopefully will be open completely by Oct. 18, the Whole Foods Day of All Days.)
Next, let's wander down to the Ballpark District, where the National Association of Broadcasters headquarters is a whisker away from topping out and its sibling the Avidian condo building is now well visble. One block away, 1250 Half is in its final minutes of not being completely above ground, as the portion closer to N Street is now right even with the street, while its northern portion has been skeletoning for quite some time. And at 3rd and Tingey, the combo project of the Thompson hotel and the Estate apartment building are beginning to change the feel of the western side of the Yards Park.
{Pant, pant.}
Now, a quick look at the buildings getting their faces on, since this is the stage when everyone is pretty much tapping their toes and waiting for the projects to be finished already. (There's a section of Virginia Avenue that qualifies for that, too.) May I present West Half at Half and N, the Harlow mixed-income building at 3rd and L, the Bower/Guild condo/rental buildings, and the new DC Water headquarters.
To wrap it up, there's one additional ghostly building to keep an eye on, though I don't wish to be flippant about it. Ward 6 councilmember Charles Allen is holding a hearing on Oct. 25 about the fire and response, for those interested.
And that's "it." Ha. Ha. I imagine the next major update will be in December, when I will spend most of the time complaining about how the low sun angle and a decade's worth of construction has made it impossible to take photos unruined by shadows. I may have to (gasp!) go out on cloudy days until spring.