Please note that JDLand is no longer being updated.
peek >>
CSX East Residential/Hotel Project
861 New Jersey Ave., SE

11-acre site formerly owned by CSX, bought in 2018 by Greystar
Plans for three buildings, including an AC Marriott and two residential buildings, plus a large co-working facility
Excavation begun September 2019, could be completed by 2023

In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Sept. 9, 2019 - A stunning JDLand graphic showing the footprint of the 11-acre site purchased by a development group headed by Greystar in 2018. 1st Street would be extended north of I, and H Street would be built through from New Jersey. Note that only the large portion on the right side of the footprint is currently slated for development.

Looking at the construction site along New Jersey Avenue SE between H and I Streets.
Sept. 9, 2019 - There are no renderings publicly available yet, so this site plan showing three buildings will have to do. According to reports, the east building will be a 225-room AC Marriott, the middle building will be both a residential building and a large co-working facility, and the western building will be another residential offering, with about 800 total apartments between the two of them. There will also be a below-ground parking garage with about 300 spaces.
Feb. 19, 2006 - An extremely rare (and high-speed) view looking south from the freeway toward I Street, before the 70/100 I apartment buildings were built.
Aug. 20, 2016 - A surprisingly similar (and similarly high-speed) view 10 years later, with the 1st Street footprint about the only landmark visible in both.
March 30, 2009 - Looking southward down New Jersey Avenue from just south of the freeway, in the old days.
January 12, 2020 - ... And a wider view of the same spot, much changed, with ORE 82 at the end of the block. This is where the Marriott will be built. Click to see all available photos of this location.
March 30, 2009 - Looking across New Jersey Avenue into the CSX site almost a decade before its sale.
January 12, 2020 - ... And the same view, where H Street will be extended into the property. Click to see all available photos of this location.
April 11, 2004 - Looking across I Street at 1st Street, a million years ago.
November 4, 2019 - ... And the same view, where 1st Street will also be extended into the property. At left is 100 Capitol Yards, and at right is ORE 82. Click to see all available photos of this location.
Latest News



                  © Copyright 2024 JD.