Since January, 2003
            
 Sliding from Before to After

I said I'd post when the urge struck and when I could provide a bit of additional background, and after watching this particular lot for 15 years, there's no way I could pass up the news that apparently the District Department of Transportation "intends" to move eastward from its current spot in the 55 M Street office building to 250 M Street, where it would be the sole office tenant in a new building to be constructed by WC Smith.
According to ANC 6D commissioner Meredith Fascett, DDOT is wanting to occupy its new space by early 2021, which would mean construction would need to start in early 2019.
This location is directly across from the US Department of Transportation, which means that I'll be forced to call this stretch the DOT block of M Street, SE. It also will share the block known as Square 769 with the currently under-construction mixed-income apartment building on the north end of the block.
There are ANC and zoning approvals to be had, including giving the okay to WC Smith's desire to lower the building height to nine stories (as, ahem, illustrated at right), cut back on the ground floor retail space, and drop the expected parking spaces to 177 on three underground levels (instead of 197 on four).
This building is actually part of the Capper-Carrollsburg PUD, and it was 10 years ago this month that the plan for an office building on this site received its preliminary zoning approvals. Then the Great Recession came along, building office buildings without substantial amounts of space pre-leased became a relic of another time, and WC Smith had to file for four two-year extensions to that zoning approval, the last in late 2016.
As for DDOT's current home, it was in May 2010 that the rumor first came out that the agency would be moving to 55 M, which was a big get for that building and for the neighborhood in general at the time.
And, this lot also is dear to my heart because it was the subject of one of the first photos I ever took in the neighborhood, with my film camera (with bad film in it, dammit) in the fall of 2000. And I thought when I first really started tracking the neighborhood in 2003 that it took what seemed to me to be for-eehhhhh-ver for that little gas station to be demolished, nine whole months after I started watching, one month after the photo at right was taken in August of that year. Little did I know.
Comments (13)
   
 
 More About 250 M/New DDOT HQ

JDLand.com Home

Comments

JD says: (5/14/18 5:20 PM)
Is commenting broken for people and I just don't know it yet?


202_cyclist says: (5/14/18 5:34 PM)
JD-- welcome back!

DDOT wants to move in around 2021, so just around when the Whole Foods opens?


JES says: (5/14/18 8:48 PM)
I literally laughed out loud, 202. Well done.


dude says: (5/15/18 7:53 AM)
Hmm, a gas station, novel idea.

I love seeing those old looking photos!


JD says: (5/15/18 11:28 AM)
Reader MG passes along these rather important photos.



jdc says: (5/15/18 11:40 AM)
Nice photos MG - I haven't been out there in awhile, before any of the landscaping was finished. Looks very nice (minus that ugly highway in the background). When HQ2 arrives, maybe Amazon will pay to bury the highway.


conngs0 says: (5/15/18 1:26 PM)
Interesting news re: DC DOT. Presumably that means another tenant can slide into 55M? The more the merrier!

Thanks for the pics, MG (and for passing them along, JD)! The home stretch (to put it kindly) of the Whole Foods build out is going to be exciting. It seems like at least five years ago since folks spotted the beer garden in the permitting associated with that lot and our neighborhood's Whole Foods rumor got legs. Time sure does (not) fly!


JD says: (5/15/18 1:39 PM)
And, OMG, from JRogers202 on Twitter. link



JD says: (5/15/18 2:21 PM)
Here's the newsletter from the Douglass Bridge folks, which says that pile driving is indeed underway and also shows a fun diagram of the five stages of bridge construction: link


Westnorth says: (5/15/18 3:40 PM)
Bisnow mentions that the retail would become "a transit store." Maybe a second place to buy your [M] gear?!


jdc says: (5/16/18 1:42 PM)
So it sort of seems build out (or something) is happening at one of the two remaining bays at the First development. Did I miss something?


JD says: (5/16/18 1:43 PM)
Barre3.


JD says: (5/16/18 3:23 PM)
I'm a little concerned about the forecast for Thursday and the chosen happy hour venue. I assume the Brig has taken down its winter fortress? Do we need to relocate?

Or maybe call a rain date, because I really do want it at the Brig. And I'm not sure people are going to be too hep to go over there through bleech weather.


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJ1 on Inching from Quarantining: Oh wow... I live at Ore82 and didn't know about any of this.
GarfieldPark on Inching from Quarantining: @JD: Apparently, ORE will be eliminating (or making them smaller) some of it's ...
JD on Inching from Quarantining: Some interesting design notes found in the approved building permit for the thre...
KEWEE on Inching from Quarantining: Jeni's Splendid Ice Creams is coming to the retail space located at The Bower co...
CJBabyDaddy on Inching from Quarantining: Serious workplace accident on the ground this morning at the Chemonics construct...
MJM on Inching from Quarantining: Welcome to the neighborhood Pivot Physical Therapy. Its located behind Sprint (w...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/06/20
1200 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/05/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/03/20
100 B/O O ST SE   ROBBERY  07/03/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/28/20
1200 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/25/20
1200 B/O SOUTH CAPITOL ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 06/23/20
1200 B/O NEW JERSEY AVE SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 06/20/20
1000 B/O 3RD PLACE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/20
800 B/O SOUTH CAPITOL ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/14/20
400 B/O M ST SE   THEFT
Shoplifting
 06/12/20
1000 B/O M ST SE   ROBBERY
Unarmed Carjacking
 06/09/20
UNIT B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/07/20

Recent Issued Building Permits Archive  
1300 4TH ST SE RU-2   
06/18/20 
AP BOWER RETAIL LLC / MELISSA BRENT
SG2000335 / CONSTRUCTION
Install 1 illuminated wall sign & 1 illuminated blade sign - JENIs ICE CREAM
150 I ST SE   
06/15/20 
SQUARE 737 LLC / BOB BIROONAK; NA; NA
SG2000323 / CONSTRUCTION
two illuminated building sign
151 M ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI; NA
SB2000292 / CONSTRUCTION
WSP will be advancing approximately 50 soil borings to 30 feet, and an additional 8 borings to 4 feet via direct push. A water sample will be collected from 3 of the deep borings. All borings will be abandoned via bentonite grout mix. Investigation derived waste will be stored in DOT 55-gallon steel drums. Private and public utility locating will take place prior to the work beginning
250 M ST SE   
06/19/20 
WILLIAM C SMITH / null
E2008622 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
M2002834 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
P2006931 / SUPPLEMENTAL
300 M ST SE   
06/16/20 
FEDERAL CENTER LP / null
E2008501 / SUPPLEMENTAL
   
06/18/20 
FEDERAL CENTER LP / null
E2008587 / SUPPLEMENTAL
111 N ST SE   
06/16/20 
BROOKFIELD PROPERTIES / NA; CHRIS CRESCI
SB2000293 / CONSTRUCTION
WSP will advance 22 soil borings to 25 feet and 8 soil borings to 4 feet via direst push. A groundwater sample will be collected from 2 of the deep borings by installing a temporary well to be in the ground for just a couple hours. Borings will be backfilled with bentonite / grout mix. IDW will be stored in DOT 55-gallon drums. A private and public utility mark out will be completed prior to b...
861 NEW JERSEY AVE SE   
06/10/20 
CXS TRANSPORTATION INC / ;
P2006604 / SUPPLEMENTAL
   
06/19/20 
CXS TRANSPORTATION INC / ;
P2006843 / SUPPLEMENTAL
   
06/22/20 
GREYSTAR GP LLC / KIM MITCHELL
B1903035 / CONSTRUCTION
The proposed project is three structures which are connected by a shared below-grade garage, which is one story deep on the east half of the site and two stories deep on the west half of the site. Two structures will be residential, with a total of 756 units, and the third will be a 225-key hotel. The west residential structure (Building 3) is planned to be 13 stories with ground and roof level am...
   
06/25/20 
CXS TRANSPORTATION INC / ;
P2006972 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/10/20 
SQUARE 742 LLC, C/O SPAULDING & SLYE/STE 100, / PAUL WHITLEY
AN1900284 / CONSTRUCTION
PROJECT CONSISTS OF: REMOVING: (2) EXISTING EQUIPMENT CABINETS, (3) EXISTING ANTENNA'S, (1) EXISTING RRU'S AND ANCILLARY EQUIPMENT / CABLE AND INSTALLING: (6) PROPOSED ANTENNA'S, (3) PROPOSED RRU'S, AND(2) PROPOSED EQUIPMENT CABINETS ON AN EXISTING TELECOM FACILITY
1111 NEW JERSEY AVE SE   
06/12/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TRACIE CLAXTON; NA; NA
SG2000257 / CONSTRUCTION
One Wall Mounted Sign illuminated
   
06/24/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P2006938 / SUPPLEMENTAL
401 WATER ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI
SB2000294 / CONSTRUCTION
WSP will advance 23 soil borings to 30 feet and 8 additional borings to 4 feet using direct push. A groundwater sample will be collected from 2 of the deep borings by installing a temporary well. Soil boirngs will be abandoned with bentonite / grout mix. IDW will be stored for disposal in DOT 55-gallon drums. A private and public utility mark out will be completed priot to starting intrusive w...
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.