peek >>
Near Southeast DC Past News Items: Square 701
See JDLand's Square 701 Project Page
for Photos, History, and Details
In the Pipeline
1244 South Capitol
Virginia Ave. Tunnel
New Douglass Bridge
Yards/Parcel O
JBG/Akridge/Half St.
Ex-Monument/Half St.
Chiller Site Condos
Yards/Parcel A
Yards/Icon Theater
1333 M St.
Capper Apts.
250 M St.
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
Congressional Square
1000 South Capitol
SC1100
Completed
Southeast Blvd. ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
Posts on Food/Fun
Retail News
Restaurants/Nightlife
 

Go to Full Blog Archive


30 Blog Posts Since 2003
Go to Page: 1 | 2 | 3

/
"Honey, what do you want to do when you grow up?"
"I want to peek through construction fences to take pictures of huge holes in the ground!"
While I'm pretty sure this wasn't on my childhood list of aspirations, I'll still present to you the latest JDLand State of the Dirt report.
From oldest hole to newest hole, we have residential projects 800 New Jersey/Whole Foods*, Florida Rock/Riverfront, 1111 New Jersey/Galley at Capitol Riverfront, 909 Half, and 82 I, then the Homewood Suites at 50 M, and finally the F1rst/First residential and Residence Inn combo.
* If you are wondering about the new one-story structure at the far left of the above photo that has popped alongside the Park Chelsea and the 800 NJ excavation, which you can, it is the "covered vehicle court" that will serve the garage and loading docks for these two projects and the eventual third building on the block.
(Click to enlarge, as always)
If you wish for more context with any of these photos, follow the links up top to go to the project pages.
 

/
I see that the two new owners on Half Street decided it was time to clear away the traces of the previous occupants and introduce themselves to the neighbors:
Also now appearing on Half Street (below left) is a spiffy logo for Due South, the restaurant coming this year to the Lumber Shed at the Yards. (The restaurant is a Bo Blair enterprise, as is the Fairgrounds, hence the cooperative crossover deal.) And, one block to the east (below right), it didn't take long for Grosvenor to make its F1rst presence known.
(Yes, I finally went out and took pictures. Be prepared for the coming onslaught.)
 

/
We've been calling it Ballpark Square, but now the Grosvenor/McCaffery residential, hotel, and retail project along 1st Street SE between M and N has its official name:
F1rst.
(Yes, that's a numeral "1" in place of the "i".)
We also now have an operator for the 170-room hotel--it will be a Residence Inn by Marriott, joining the chain's Courtyard location that's been in the neighborhood since 2006.
The residential building will have 325 units--a mix of studios through 2 BR/den--plus a fitness center, club room, outdoor courtyard, garage with bike parking, and a rooftop deck with a pool, grilling stations, dog park, and an "outdoor multimedia theatre" on the building's southwest corner that will have stadium-style seating and a view into Nats Park.
It will take about two years for the buildings to be completed, though some retail tenants could move in starting in the first quarter of 2017.
And, as I reported a few weeks ago (even though nobody believed me), Taylor Gourmet and Chop't are already signed for some of the project's 25,000 square feet of retail.
The event today did not have shovels and hardhats--which made sense given that the ground has already been broken--but there were dignitaries and speeches, and a ceremonial throwing of baseballs into the construction footprint.
I took photos, of course, and here's the full gallery. A few snippets here, though:
 

/
The digging is already underway on the west side of 1st Street SE midblock between M and N, but that won't get in the way of a ceremonial groundbreaking scheduled for Wednesday, April 8, at 2 pm, that will celebrate the start of the 450,000-square-foot Grosvenor/McCaffery residential/hotel/retail project just north of the already under construction Hampton Inn.
This development has been referred to up until now as "Ballpark Square," but apparently its real name will be unveiled at this event.
The rendering above shows, from left, the project's two-story retail building at 1st and N, just across from Nats Parking Lot C, then a blank spot where the Hampton Inn is being built, then the 285-unit (or is it 325-unit) residential building, then the 170-room hotel (no operator so far named). At far right is the 233,000 square foot 99 M Street office building being developed by Skanska, which isn't technically part of this groundbreaking but which appears to be close to getting its own permits to start digging.

Comments (5)
More posts: F1rst Residential/Hotel, Development News, Square 701
 

/
The second week in March started off pretty notably in Near Southeast:
First, the one that's probably of most interest, the arrival of Bonchon's signage, now hung outside of its space on the southwest corner of Half and K, inside 1015 Half Street.
I peeked in the door, and it appears to still be a few good weeks from opening, which would seem to jibe with the "early April" target date that the restaurant posted on its Facebook page back in February. So everyone will just have to look at these signs and dream for a little while longer.
One block to the south, fences and equipment arrived at the parking lot on the northeast corner of Half and M, and this morning ground was being broken (for real, not ceremonially!) for what will become a 195-room Homewood Suites.
This will be another addition to the neighborhood's burgeoning lineup of hotels, with the long-established Courtyard by Marriott at New Jersey and L about to be joined by the under-construction 168-room Hampton Inn at 1st and N, plus eventually also the as-yet-unnamed brand in the as-yet-unnamed Ballpark Square project.
Speaking of which.... Fences went up Monday afternoon around the sidewalk on the west side of 1st Street south of M, generally along the boundary of the residential and hotel portion of the Grosvenor/McCaffery project currently referred to as Ballpark Square. No heavy equipment has arrived, and as I mentioned recently there's plans for a ceremonial groundbreaking in coming weeks, but fencing off the public sidewalk would seem to be a bit of a "tell."
This project will have a 285-unit apartment building alongside the 180-room hotel, and 45,000 square feet of retail that will stretch across these two buildings, the Skanska 99 M office building at the corner of 1st and M that is also expected to get started Any Minute Now, and a separate two-story retail building at 1st and N.
And, just to emphasize how many new projects have gotten underway in the past few weeks, here's official documentation (finally) of the work underway at residential projects 909 Half (left) and 82 I (right), which together will add another 615ish units to the neighborhood inventory when they open.
Having a hard time keeping all of this straight? Check out my refreshed-for-2015 What's New in the Neighborhood Since Last Season page, with handy maps of the restaurants that have opened or are coming soon, the new lineup of project plans just north of Nats Park, and the 10 (TEN!) residential projects currently under construction or starting momentarily. Be prepared for a lot of blocked sidewalks and a lot of construction vehicles on your way to the ballpark this year....
 

/
If your tastebuds are on the lookout for additional options in the neighborhood, tell them that I am hearing that Taylor Gourmet and Chop't are slated to be tenants in the pending Grosvenor-McCaffery-Skanska mega project along 1st Street SE between M and N currently dubbed Ballpark Square.*
But said tastebuds will need to be patient, as the project is still a few weeks away from an expected ceremonial groundbreaking, and then it will take a while to construct the project's 285-unit apartment building, 180-room hotel, and 233,000-square-foot office building in the block just north of Nats Park.
All told, there will be about 45,000 square feet of retail across the project, with about 7,000 of it in the separate two-story 7,000 square feet retail building at the corner of 1st and N, also being developed by Grosvenor/McCaffery.
The rendering at right showing the 99 M office building, the hotel, and the residential building as seen from the northwest corner of 1st and M may help get your bearings on the location and plans.
No operator for the hotel has been announced as yet. (And note, as always, that this is separate from the Hampton Inn currently going up on the south end of the block.)
* I've also heard that "Ballpark Square" is actually not the final name of the development. This allows me to yet again point people to my June 2007 post, Name Your Own Near Southeast Development Project!
Comments (16)
More posts: 99m, F1rst Residential/Hotel, Development News, Square 701
 

/
* 82 I GETS A PERMIT: Add another project to the ready-to-start-anytime lineup. In this case, it's the 234-unit residential project on the northwest corner of New Jersey and I, which as of this morning has an approved shoring/sheeting/excavation permit. They've looked ready for this moment for a few weeks now, so it'll be interesting to see when work gets underway.
* 909 HALF GETS A PERMIT: Late last week 909 Half Street got its shoring permit as well. This is a 380-unit residential building by Ruben Companies and the Related Companies, and at least one resident is sure that activity is already underway at the site on the southwest corner of Half and I, in the wake of construction trailers having arrived within the past few weeks.
This is the first time in my 12 years of JDLand-ing that a project has gotten this far along without making available a least a token rendering of what's coming, so I figured I'd just fill in the blank. Feel free to create your own.
* BALLPARK SQUARE TEA LEAVES: The parking attendant kiosks have disappeared, the gates have been locked, and cars have stopped parking on the former Nats Lot F along the west side of 1st Street south of M. The residential and hotel project known as Ballpark Square has had excavation permits in hand for the southern part of this lot since November--keep an eye out for the arrival of heavy equipment.
(Note that the north end of the block is going to be the 99 M office building--sort of part of Ballpark Square, sort of not. It doesn't have its excavation permits approved yet, though they are in process.)
* FOUR READY TO GO: If you are keeping track, there are now these approved excavation permits for 82 I, 909 Half, Ballpark Square, and the Homewood Suites at 50 M. That's a lot of new digging to kick off 2015--it's also another 940 residential units and 365 hotel rooms about to drop into the pipeline. Already under construction? Residential projects Park Chelsea, 800 New Jersey, Lofts at CQ, Arris, 1111 New Jersey, and Riverfront, plus the Community Center and a Hampton Inn, too.
* MONUMENT VALLEY TEA LEAVES: At Monday night's ANC meeting, a representative from Jair Lynch's development company was there to discuss the revamped plans for the Half Street Hole, aka Monument Valley, which Lynch and partners bought last year. According to reports from the meeting (I wasn't there), the plans are shifting to include 130 condos alongside the rental units, and to scale it all down because it was "too large." SWill was kind enough to tweet a cellphone grab of the design shown to the commission for the northeast corner of Half and N. This will need to go through a Capitol Gateway Overlay zoning review before moving forward, so there will be more opportunities to see renderings and get additional information. Lynch's rep told me after the meeting that the project is expected to be back in front of the ANC "in the very near future."
* THE DEVIL LIVES AT PARK CHELSEA: Curbed DC took a look at the pile of new renderings on the Park Chelsea web site (with a clock counting down to the start of leasing on July 1) and noticed a very familiar someone in a few of them. Clearly this is the week for having a bit of fun with drawings.
 

/
Thankfully my camera shutter does not seize up in cold weather, because I spent more than two hours on Saturday wandering the neighborhood* to catch up on all of the latest doings, of which there are so many these days.
I looked at The Brig.
I looked at a few other spots that you'll hear about soon.
Unsurprisingly, I also looked up.
And what a sky to look up at.
(Just ignore all those dust artifacts marring the magnificent blue. Time to buy my own sensor cleaning kit.)
I looked up at the Hampton Inn at 1st and N, which now has most of its windows and appears to be about to get its facing. Maybe it looks a smidge less like a grain elevator now.
Then I looked up at the VIDA Fitness complex at Twelve12, originally to document the new Bang Salon and Penthouse Pool Club signs, but how I could resist yet another shot of the VIDA sign when I saw this?
I've mentioned the Banfield Pet Hospital sign before, but seeing it there reminds me that a reader passed along a Banfield tweet from early January saying that Banfield would be opening Feb. 7. Keep an eye peeled for the removal of the window coverings....
And finally, we have the Park Chelsea, which remains thisclose to getting its masonry completed, with the second photo included mainly to give me an excuse to sneak in a shot of the scaffolded Capitol dome.
If you like photos of vertical construction against a deep blue sky, stay tuned.
* But, hey, 11,000 steps!
 

/
I could blather on in some kind of forced introduction about how the weatherman sold my camera and me a bill of goods this weekend ("mostly sunny," eh?), and how the low sun and weak light and wispy clouds made for less-than-stellar images, but instead let's just jump in.
We'll start with the photo at right, which shockingly reveals that dirt is actually being moved on the northwest corner of 8th and L, where the beer garden now known as The Brig has been planned for such a long time. Clearly work is in the very early stages, but that's a nice change from no progress at all. It's supposed to open in the spring.
Continuing the tour....
Digging continues at the 1111 New Jersey apartment project (above left), with the shoring at far left helping to give a sense of how far down they've gotten so far. (Spoiler: they have a long ways left to go.) And at the Capper Community Center Building House (above right), the foundation on the south end of the site along L Street is now a pretty sizeable structure.
It's hard to get a decent shot of the Lofts at Capitol Quarter construction, because the building is so long, though the wide open space of Nats Lot W helps. Vertical construction continues at the far east end, at 7th Street, while the western end waits its turn. Here's a big version of the latest image, to make it easier to see. (But remember, you can click on all photos to pop up larger versions.)
From there I wandered to the Yards (after rejoicing that the Hull Street Gate to the Navy Yard was closed, so I was able to take photos of the Lofts construction without hassle). The Arris apartment building is now getting its second floor, from south to north, as seen in the below left shot from the corner of 4th and Water. And a different sort of progress is visible a few feet away, in the windows of the northwest corner of the Lumber Shed.
Not pictured is the lunch stop I made at 100 Montaditos, mainly to watch Mr. JDLand's continued march through the menu.
Meanwhile, the Hampton Inn at 1st and N (above left) continues to stand all but alone (I find myself thinking of it as Near Southeast's grain elevator). I also think I managed to capture a construction milestone when I spied its first installed windows. And, up at New Jersey and I, the Masonry Marathon continues at the Park Chelsea (above right), though it does look like that phase may not last too much longer.
There's one other batch of progress photos I took on Saturday, but you're just going to have to wait a bit longer for those.
 

/
Worn out from all these photo updates? Imagine how I feel. But I start getting the shakes if I don't at least touch on the status of each project currently underway, and having given the latest from Florida Rock and Arris and the Lofts at CQ, I need to run through the rest of them. It's a sickness.
Let's start with the holes in the ground. First are the two newest ones, with the initial hints of the foundation at the Capper Community Center Building House (left), and the more substantial digging underway at the 1111 New Jersey/Gallery at Capitol Riverfront apartment building.
Meanwhile, up at 800 New Jersey, the hole, it is deep. (And, as an aside, this poor project desperately needs a name, other than "that building that's going to have the Whole Foods." Even the signage looks a little forlorn.)
On the other end of the spectrum, we have the three topped-out buildings in various stages: at left is the Hampton Inn, which just reached this milestone within the past few weeks, then there's the Park Chelsea residential building, which may someday see the completion of its exterior masonry work, and finally the Parc Riverside apartment building, which is probably about to graduate out of my project updates given that the first units are expected to open in December.
 
30 Posts:
Go to Page: 1 | 2 | 3