Since January, 2003
            
 Sliding from Before to After

The Bullpen, the outdoor bar and festivities spot that has operated just across the street from Nationals Park during stadium events since 2009, is making plans to open a "Beer Garden" at the northern end of their current block, at Half and M streets, SE, facing the western entrance to the Navy Yard Metro station. (See my high-quality graphic at right.) With 79 picnic tables holding eight people each, it would have a seating capacity of 632 people, and would offer draft German beers (and perhaps other European beers) along with German sausages, kielbasa, and other light (ahem) fare.
"Das Bullpen" [copyright JD] is being envisioned as having a very different atmosphere from the current Bullpen, with the beer garden not having game areas with lots of kids running around. There would be no amplified music, and it would operate during the same hours as Bullpen 1.0 (which will be remaining open this year as well). It would have its own entrance, right across from the Metro station's entrance, and would be fenced in and partially covered/tented in the same way as the existing Bullpen.
At an ANC 6D ABC subcommittee meeting tonight, a Bullpen rep explained that Akridge, the owners of the entire block bounded by M, N, Half, and Van, has informed the Bullpen owners of plans to begin construction perhaps as early as October of this year on the southern end of the block, where Bullpen 1.0 is located. (There seems to have been some sort of "hint" that if the Bullpen wants to have a shot at a permanent home in the new ground-floor retail spaces that will be available when the block is completed, they need to expand to this additional area this year.) If Akridge's plans are unchanged from what went through the zoning process a few years ago, the southern end of the block would be a 300-unit residential building with ground-floor retail. You can see renderings on my Akridge Half Street page.
As you can see on my cruddy map, there will still be substantial parking available between the two locations. (For old-timers, this new site is where WMATA's old Southeastern Bus Garage entrance was located.)
The Bullpen's lawyers are trying to determine whether this constitutes an expansion of the current operation, to allow Das Bullpen to open under their existing liquor license, or whether a new license (and then a new voluntary agreement with the ANC) will be needed. More to come, I'm sure.
UPDATE: And it should be noted that this is a completely separate venture from the Bavarian Beer Garden plans at 8th and L, SE. Beer gardens to the left! Beer gardens to the right!
UPDATE II: To clear up any confusion, they are intending to have Das Bullpen open this spring, with Bullpen 1.0 open as well through the end of the 2011 baseball season.
UPDATE III: Another clarification: The new site has no official name yet. "Das Bullpen" is purely my invention, because I wanted something catchy to describe it.
Comments (8)
   
 
 More About West Half St.

JDLand.com Home

Comments

E. Carlin says: (2/2/11 10:25 PM)
I understand the German theme has the backing of the team's Internet fan club, the Nats E-Party.


Jay Roberts says: (2/3/11 9:21 AM)
From buses to buzzes, he, he...


Alan says: (2/3/11 1:32 PM)
Slightly confused; is the goal to open this secondary watering hole by opening day this year and have two places for the 2011 season and then just the Beer Garden for 2012 and beyond or will it be just the bullpen this year and then just the beer garden next year?


JD says: (2/3/11 1:34 PM)
The goal is to have both for this year and just the beer garden next year.


Tom says: (2/3/11 5:07 PM)
I'm slightly disappointed that the folks who operate the Bullpen and Das Bullpen don't seem to have any desire in opening a permanent facility in the neighborhood.

To me, they want our money, but only during baseball games. What about when the team is in Chicago and I still want a beer on a Saturday afternoon?

There's plenty of ground floor retail that would be perfect for a restaurant (even one above the Metro!).

Very disappointed.


JD says: (2/3/11 6:00 PM)
"Tom", I think in this case what they're doing is trying to (p)reserve a permanent spot in Akridge's Half Street project, which will be a prime place to be when it is ever finished. The Bullpen rep basically said last night that they were told that if they didn't add Das Bullpen this year, they would lose the chance at one of the permanent retail spaces when that side of Half Street is built out.

I'm guessing there will be at least one new sit-down restaurant option announced in the area before 2011 is out.


Tom says: (2/4/11 9:22 AM)
While I understand that, even if ground were broken tomorrow, it would still be at least two years before the structure is complete. The key words are "when it is ever finished".

Obviously they see a need for increased space during the baseball season, it's just a shame that they don't see the need for ANY space during the rest of the year, as it stands right now.


rj says: (2/6/11 2:37 PM)
Maybe the bullpen guys are opening up das bullpen to make money. its called business.

I want more permanent businesses in the neighborhood too, but to be disappointed by an entrepreneur who sees an opportunity to make a profit is pretty childish.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

dcgent on Inching from Quarantining: Secon try on Bammy link https://dc.eater.com/2020/5/2nk9/21274400/bammys-caribbe...
dcgent on Inching from Quarantining: Another look at Bammy
jaal on Checking in From: @Sasq & @ Jscott280 Fellow envy here! Any updates on closing?
GaryRKarr on Inching from Quarantining: Looks like ColdStone Creamery is getting ready on Half Street.
Jscott280 on Inching from Quarantining: Apparently Bammy (in the old whaleys space) is opening up today for takeout ...
conngs0 on Inching from Quarantining: Heard the Navy Yard Bang is not on the main website any longer? Or is that becau...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/24/20
1200 B/O VAN ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/23/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/20/20
1100 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/19/20
1100 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/19/20
1200 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/17/20
100 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/15/20
1200 B/O 4TH ST SE   ASSAULT WITH A DANGEROUS WEAPON  05/12/20
300 B/O WATER ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/07/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/03/20
100 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/03/20
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/28/20
400 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 04/24/20

Recent Issued Building Permits Archive  
1300 4TH ST SE RU-1   
05/14/20 
AP BOWER RETAIL LLC / null
P2006042 / SUPPLEMENTAL
1300 4TH ST SE   
05/08/20 
null / ;
P2005886 / SUPPLEMENTAL
   
05/15/20 
null / ;
P2006066 / SUPPLEMENTAL
929 5TH ST SE   
05/18/20 
CHRISTOPHER D FRENCH / CHRIS FRENCH; HERCULES FENCE OF MARYLAND, LLC HERCULES FENCE OF
F2000461 / CONSTRUCTION
1. Removal and replacement of front metal fence and gate in kind.  2. Removal and partial relocation of existing 6' tall wood fence in rear patio. The fence is currently approx. 30" inside the rear property line, and we intend to move the fence to our rear property line. The work includes removal of existing wood gate that opens from neighbor's property to our property along shared property line ...
300 M ST SE 4TH FL   
05/05/20 
FEDERAL CENTER LP / ;
P2005798 / SUPPLEMENTAL
250 M ST SE   
04/29/20 
SQUARE 769 LLC / TAMIKA STATON; OTIS
EN2001825 / SHOP DRAWING
Install 3 New Elevators - 3500Lbs @ 350FPM - Elevators 1 - 2 and 4
   
04/29/20 
SQUARE 769 LLC / TAMIKA STATON; OTIS
EN2001826 / SHOP DRAWING
Install 1 New Elevator - 4000Lb @ 350FPM - Elevator 3
   
04/29/20 
SQUARE 769 LLC / BRIAN C STROTT; NA
TL2000026 / CONSTRUCTION
9 story 173,125 GSF tenant improvement fit out.
   
04/29/20 
SQUARE 769 LLC / TAMIKA STATON; OTIS
EN2001827 / SHOP DRAWING
Install 2 New Elevators - 3500LB @ 200FPM - Elevators 5-6
300 M ST SE   
04/30/20 
FEDERAL CENTER LP / SAM HOLLEN; TBD
B2006591 / CONSTRUCTION
INTERIOR RENOVATION TO 5TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. NO STRUCTURAL. 4499 SQUARE FEET. NTT DATA.
   
05/01/20 
FEDERAL CENTER LP / null
E2007254 / SUPPLEMENTAL
   
05/14/20 
AMENTUM / null
E2007609 / SUPPLEMENTAL
111 N ST SE   
05/07/20 
BROOKFIELD PROPERTIES / MAHMOUD KHACHAN; NA
SB2000288 / CONSTRUCTION
Drill temporary eight soil borings to a depth of 80 each at the existing parking lot at 111 N Street SE, Washington DC. The diameter of the borings is 6 inches. The borings will be grouted upon completion in accordance with DCRA requirements as indicated in the work plan.
1111 NEW JERSEY AVE SE   
05/12/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E2007563 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
05/06/20 
UNITED STATES OF AMERICA / JUSTIN BELLOW; NA
B1913803 / CONSTRUCTION
PARCEL G PROJECT CONSISTS OF A NEW 12 STORY OFFICE BUILDING WITH STREET LEVEL RETAIL AND 2 LEVELS OF BELOW GRADE PARKING. 2 LEVEL PARKING APPROVED UNDER FOUNDATION TO GRADE FD1900047 & SHEETING AND SHORING SH1900050
   
05/19/20 
UNITED STATES OF AMERICA / null
M2002480 / SUPPLEMENTAL
   
05/19/20 
UNITED STATES OF AMERICA / null
P2006118 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.