Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Square 743N
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


141 Blog Posts Since 2003
Go to Page: 1 | ... 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15
Search JDLand Blog Posts by Date or Category

Today the Board of Zoning Adjustment heard an application by Donohoe to waive the rear-yard requirement for its planned 146,000-sq-ft office building at 1111 New Jersey. I don't want to get too far into the weeds of it all, but basically this rear "yard" requirement was actually applying to the airspace along the alley between L and M above the project's first floor (because by right the first floor can run right to the alley line). Donohoe's position was that, by allowing them to build to the rear property line on all floors, they could build an 11-story building with higher ceilings on the 1st floor (16 feet), making the space far more desirable to prospective retail tenants. If they were unable to use that airspace, they would instead build a 12-story building of the same square footage, but with only 12-ft ceilings on the 1st floor (and shorter ceiling heights on the other floors). Although ANC 6D opposed this application on the grounds that it lacked a community benefits package (which is not required in a "by-right" project), the BZA felt that the higher ceiling heights on the first floor that would be allowed by granting this special exception, and the resulting higher-quality retail prospects that could be drawn to the building, could be considered to benefit the community. And with the pastor of St. Matthew's Church (which sits directly to 1111's north) saying that he is in favor of the project, and with the Office of Planning, the Capitol Hill Historical Society, and the neighboring developments (100 M Street and Onyx on First both sit across the alley from 1111 New Jersey) supporting it as well, and with other required standards of the rules met (sufficient distance between 1111 and adjacent structures, sitelines sufficiently separated, and adequate off-street parking [114 spaces], loading docks, and delivery space), the BZA voted 5-0 to approve this application. I've been told that this project could begin construction this summer.
UPDATE: Actually, I now hear that the project may not start until closer to the end of 2007. I don't know for sure, but perhaps the schedule is also being impacted by an upcoming item on the WMATA Planning, Development and Real Estate subcommittee agenda for June 14: "Approval of Developer Selection and Term Sheet for the Navy Yard East Entrance", which is referring to a joint development solicitation proposal back in September 2006, looking to develop the 4,400 square feet owned by WMATA above the Navy Yard station entrance at New Jersey and M with some combination of a public plaza at ground level and development above it. So we shall see....
 

Donohoe's planned 146,000-sq-ft office building at 1111 New Jersey Ave. (on the west side of New Jersey between L and M) takes a step forward tomorrow with a hearing in front of the Board of Zoning Adjustment--they're looking for a special exception for a waver of the rear yard requirement, which apparently would allow them to put up an 11-story building with higher ceilings as opposed to a 12-story building with lower ceilings if they have to keep the rear yard. ANC 6D voted in April to oppose this application, but more because the developers are not providing a community benefits package than any issues with the application itself. The hearing should be webcast, and I'd tell you what time it's scheduled for, but the Zoning Schedules and Agendas site has been down for three days now, so I can't look it up to confirm.
UPDATE: The BZA site is back, so I can tell you that the hearing is the third item on the agenda for the session that begins at 9:30 am.

 

Today I saw for the first time new signs hung on the fence surrounding the firewood lot on the southwest corner of 1st and I Streets, emblazoned with "DRI Development/Office and Retail" (or some such). I have absolutely no information on this--this lot has been owned for quite some time by the Potomac Development Corporation, but I don't see any records as of yet in the online public records to indicate a sale has taken place, so perhaps it's a joint venture. Or not. I don't know. Anyway, I'll try to see what I can find out (whispers in my ear always welcome!), and hopefully some light can be shed on perhaps ANOTHER project getting started in the North of M section of Near Southeast, to go along with JPI's two residential towers, ADC Builders' Square 699N, Faison's Onyx on First condos, and Opus East's 100 M office building (and maybe the Nation site, too?), and perhaps something on the Sunoco lot by Monument Realty.
 

Some very brief Near Southeast-related updates from two ANC meetings this week (I wasn't in attendance at either, so these are just quick summaries I received from Other Parties): At ANC 6D on Monday, the commissioners voted 3-2-2 to oppose a zoning special exception request (waiver of the rear yard requirement) for the planned office building at 1111 New Jersey Ave., the Donohoe project on the west side of New Jersey between L and M (on top of the eastern Navy Yard Metro station entrance); the Board of Zoning Adjustment hearing is on May 8. As always, the biggest sticking point appeared to be battle between the ANC's we-want-a-community-benefits-package-in-return-for-our-support stance and the developer's this-is-a-matter-of-right-project-we-don't-have-to-give-you-anything stance. (And you wonder why I avoid these meetings like the plague.)
Meanwhile, over at ANC 6B (which is in charge of the sliver of Near Southeast around 8th Street/Barracks Row), the process is beginning about the possibility of razing the abandoned beige apartment building on Potomac between 8th and 9th and replacing it with a new four-story building with ground-floor retail and two levels of underground parking (though this is still just in the conceptual phase and may not be the final plan). A raze permit has been applied for, but because this small section of Near Southeast is part of the Capitol Hill Historic District, the Historic Preservation Office will be involved in the process. More later, I'm sure.
 

I gave you inside-the-ballpark photos on Monday, and today there's a new set of exterior shots of the Nationals baseball stadium (note that I've now separated the interior and exterior stadium photo galleries into separate tabs). Remember that clicking on the Click to see all available photos of this location. icon will show you all uploaded photos of that angle, not just the oldest and newest (so you can watch the stadium construction change in two-week intervals). I also "freshened" the Photo Archive's database of photos at all the intersections around the perimeter of the stadium, giving you additional viewpoints not shown in the Construction Gallery: check out 1st Steet at N, N Place, O, and Potomac; Half Street at N and Potomac; and South Capitol Street at N, O, P, and Potomac. (You can also browse the archive by map to pick and choose locations.)
I also did what is probably the final major photo update for 20 M Street, and updated some other intersections as well--Half and M, Cushing and M (both of which are part of the Monument Half Street footprint); Cushing and L; and 1st and M and 1st and L, home of the construction sites for 100 M Street and Onyx on First, which each got updated as well, although the pictures aren't particularly exciting (still just a big hole in the ground). Or you could just look at all the photos I took today, then click on the intersection link if you want to see previous photos.
And now, I must go watch my Gators.

 

From today's print edition of the Washington Business Journal: "CNN and a couple of law firms are sampling the wares in Southeast DC by taking tours of new office buildings cropping up around the new baseball stadium. No leases have been signed yet, but the buzz of these high-profile tenants looking at Southeast as an option is quite a victory for a neighborhood formerly known as an industrial zone crawling with seediness and crime. [...] Also, rents in Southeast are expected to be around $40 per square foot for full service, $20 to $30 cheaper than new or renovated buildings in the Central Business District." Of course, right now, "tours of new office buildings" means 20 M Street, the only new office building currently completed and with plenty of space to lease. But by 2009 there will also be 100 M, 55 M, and probably 250 M and 1111 New Jersey. And maybe a couple more, depending on what happens within the next few months at Square 699N, Square 697 (Nation), and the Willco site at 83 M. (The article fudges a bit by mentioning 1.8 million square feet of office space was under construction in Near Southeast back in December, but, well, 1.35 million of that was the DOT HQ.) UPDATE: Added the link to the story, since WBJ was nice enough to bring it out from behind the pay wall.
 

Goings on about town.... Earlier this week the construction crane arrived at the Onyx on First/100 M Street construction site, signaling the beginning of the end of the digging-down phase and the start of the building-up phase. (Though these two projects are being developed by different companies, they are being built concurrently--that's synergy, and cost savings!) Two blocks over, a big sign has gone up at 2nd and M advertising Washington Canal Park--the graphic on the sign is the same one I found a few weeks back in the Capitol Riverfront BID executive summary. And, today, fences have been erected around Square 699N, the entire block bounded by Half, K, L, and 1st, the former home to Wet/Edge and various other small businesses. Permits appear to be in place for demolition and excavation, so with the fences up I'd expect something to start happening soon--now if only the Cohen Companies would tell us WHAT! You can see a few new shots on my Square 699N and Canal Park pages, or here in the Photo Archive all at once. UPDATE: I should add that, back in September 2005 when Ron Cohen purchased Square 699N, it was reported that the block would be developed with 650 condos, a hotel with condos, a stand-alone 250,000 sq ft office building, and retail. But there's been little reporting since on his plans.
More posts: 100 M, Canal Park, Onyx, Square 743N, Square 699n, Velocity Condos
 

The draft agenda for the March 12 ANC 6D meeting has been sent out (although not posted on their web site as yet, alas), and there are a few Near Southeast items of interest: discussion and vote on an construction agreement (presumably between the developers and the neighborhood/ANC) for 1325 South Capitol Street (the 276-unit residential project across from the ballpark); a presentation on modifications being requested in front of the Zoning Commission to the plans for the office building at 100 M Street (I don't know any details, will post when I find out); and a presentation on streetscapes at the The Yards/Southeast Federal Center (ooooh, more hints of moving forward!). There's also a meeting on the planned Monument Realty project on the Randall School site at Half and I Streets SW (blissfully outside of my purview). The meeting is at St. Augustine's Church at 6th and M Streets, SW at 7 pm.
UPDATE: The 100 M Street change is quite minor, according to Opus East, a result of actual construction drawings evolving from the original design drawings. I also hear tell that First Street is going to be widened at some point by DDOT, which means that 100 M and Onyx on First won't have a wide/deep sidewalk along as originally thought. (I don't have any details on the First Street work.)
UPDATE II: The ANC 6D report in the new issue of the Hill Rag has more details on the 1325 South Cap construction agreement as discussed at the February meeting, though I don't know whether it's changed or not going into tonight's meeting. It also says the project has 276 units, not 244 as I've been reporting.
Comments (0)
More posts: 100 M, 1325sc, ANC News, Onyx, South Capitol St., Square 743N, The Yards, zoning
 

Today I was able to take some photos from up high at the Courtyard by Marriott--since it was a clear day, I could indeed see forever. First off, with the Capper/Carrollsburg demolition west of 5th Street now complete, I've posted before-and-after photos of the Capper footprint that illustrate the astonishing difference 10 months and six blocks' worth of demolition can make; this page also has new photos as you scroll down showing ground-level shots of the final demolished block north of K between 2nd and 3rd. Next are photos-from-above of the holes in the ground at 70/100 I and 100 M/Onyx, with comparison shots from last year (scroll down a bit from the top of the page). And, if you can bear to scroll ALL the way to the bottom, I have views of the Nats ballpark construction from this Courtyard vantage point--it's pretty much like looking into the stadium from dead center field, except four blocks away. And, at the top of the Capper Seniors page, there's a neat shot of all three Capper Seniors buildings. Alas, now I will have to return to taking boring street-level shots for a while....
 

Adding to the projects that look to be starting in 2007, it appears that the 1111 New Jersey Avenue office building being developed by Donohoe is moving forward--they've recently applied for a zoning special exception ("for a waiver of the rear yard requirement"), which has been added to the Bureau of Zoning Adjustment's May 8 agenda. This is slated to be a 146,000-sq-ft, 12-story project with ground-floor retail, and I've heard tell that they're planning a mid-2007 start date. It will be on the land between the Navy Yard Metro station entrance at New Jersey and M and St. Matthew's Baptist Church at L Street (St. Matthew's is not being demolished)--and no, it won't be built up on the grassy hill, they'll dig down to street level! This will make the third project underway on what is known as Square 743N, along with the 100 M Street office building and the Onyx on First residential tower on the other side of the block, along 1st Street.

 
141 Posts:
Go to Page: 1 | ... 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15
Search JDLand Blog Posts by Date or Category