Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2693 Blog Posts Since 2003
Go to Page: 1 | ... 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 ... 270
Search JDLand Blog Posts by Date or Category

In March 2011, I posted on the proposed 2012 tax assessments for the 900-plus tax parcels that I track as Near Southeast properties, which valued the neighborhood at just a teensy bit under $6 billion ($5.994B). But there's a reason those are just "proposed": property owners need a chance to prostrate themselves before the city to try to get their assessments revised. In addition, new properties come onto the rolls during the year as projects get completed.
So, I can now report that the 2012 tax assessment total for Near Southeast is: $6.06 billion. Since the final assessments for 2011 came in at about $5.81 billion, 2012's number is a $248 million increase for actual assessments year-over-year.
There were 15 properties that received reductions for their 2012 bills, totaling about $148 million. The big property owners managed a few hefty cuts, with JBG's US Department of Transportation building leading the way with a $47.7 million reduction to just under $615 million, followed by CSX's empty lots near the freeway north of I Street getting a $46.3 million haircut down to $66.2 million. Many of the other shiny new-ish buildings of the neighborhood also got their tallies reduced, such as apartment buildings 70/100 I and 909 New Jersey and office buildings 20 M, 55 M, 225 Virginia, and Maritime Plaza I and II.
But these reductions were offset by $216 million in upward revisions. Most of this is thanks to 1015 Half Street finally being completed, taking that parcel's assessment from last year's $41.1 million to just a hair under $144 million. Three other buildings (80 M, 100 M, and 300 M) received higher final assessments as well. Plus, 32 townhouses in Capitol Quarter came onto the rolls as completed buildings, bringing just under $14 million in new tax revenue. (Yes, yes, PILOT/payment in lieu of taxes--don't stop me when I'm on a roll.)
And, because people always want to know, the ballpark's assessment for 2012 remains the smidgiest smidge under $1 billion, unchanged from 2011, at $999,982,800.
Alas, I can't give good year-to-year comparison numbers on final assessments in previous years because I didn't really grasp this whole revision thing until last year (oops), but I can say that proposed assessments were just a mite over $6 billion in both 2010 and 2011, after having been at $4.47 billion in 2009. My March post has the year-by-year proposed assessed values for the neighborhood, if you want those numbers.
If you feel like digging deeper (since you don't pay me enough to just post all my numbers for you to use), here's the the current assessments database, which you can search yourself. Tune in this March to see what the city proposes for 2013 values, and then in January for what the values really end up being....
Comments (0)
More posts: assessments
 

If you're expecting to use the Navy Yard Metro station to get to and/or from your cavalcade of weekend Halloween events, be forewarned: as part of WMATA's continuing track work, the Navy Yard station (along with Waterfront, Anacostia, and Congress Heights on the Green Line) will be closed beginning at 10 pm on Friday, Oct. 28, through the system's closing time at midnight Sunday.
According to WMATA's press release, there will be shuttle buses running between L'Enfant Plaza and Southern Avenue, with stops at the closed stations. "Riders using the shuttles should allow 30 minutes of additional travel time"--which makes that 15-minute-or-so walk up to Capitol South sound not quite so bad.
(The Circulator that runs from the eastern entrance of the Navy Yard Metro station at New Jersey Avenue up to Eastern Market and then Union Station would be a fine alternative, except that it's now on its Winter Hours schedule of only running on weekdays from 6 am to 7 pm.)
The 10 pm Friday close might have a bit of an impact on the final hours of Truckerboo at Half and M, SE; residents might need to be prepared to see larger numbers of pedestrians than usual in the late hours hoofing it northward to Capitol South.
The Green Line isn't the only one seeing closures this weekend--read WMATA's press release for all the details.
Comments (0)
More posts: Metro/WMATA
 

The Nationals have just announced that tickets are on sale for "America's Night of Hope," the large stadium event held by the Joel Osteen Ministries. It will be on April 28, 2012 at Nationals Park, with tickets priced at $15. In its three previous years, the national version of this event was held at Yankee Stadium, Dodger Stadium, and most recently at US Cellular Field (home of the Chicago White Sox) in August.
(There are smaller "Night of Hope" events held across the country as well, but apparently this is the big national version.)
This is all a little bit out of my realms of expertise, so as more information becomes available, I'll pass it along. But here's how Osteen's web site describes it:
"On April 28, 2012, people from across America will gather at Nationals Park, home of the Washington Nationals, in Washington D.C. to pray for this great nation. Come and experience this unprecedented America's Night of Hope with special guests, great music and hosts, Joel and Victoria Osteen. It will be a night you don't want to miss.
"Joel will be sharing a powerful message of HOPE that will inspire you to become all that God wants you to be. Make plans now to attend this exciting event and discover God's best for your life!"
 

October may be my favorite month for taking photos of Near Southeast--if you can get a bright clear day, the just-starting-to-change trees give a nice additional color pallette, plus the sun still gets high enough in the sky to (mostly) allow for southward-facing photos. It was eight years ago I first found this out, as you can see in this October 2003 gallery--there's still a lot of shots where clearly I hadn't found my routine yet (and you can see my dirty windshield here and there!), but there is still something special about the light in them. And looking at how different things look is kind of cool, too.
There isn't really all that much to take photos of in the neighborhood right now, especially since I did a full set back in September, but I did take a quick walk through Capitol Quarter and over to 225 Virginia/200 I to get updated images:
The old Post Plant monolith ain't quite so monolith-y anymore, is it?
You can browse the expanded photo archives for 225 Virginia and Capitol Quarter Phase 2 for lots and lots of images (with today's shots marked by the icon, as always), or visit the Capitol Quarter and 225 Virginia/200 I project pages for a more "narrated" tour.
There's apparently been some concern by Capitol Quarter residents about the 200 I construction, but representatives of Stonebridge gave an update to them saying that "base building work" (i.e., outside stuff) will be completed in the next four months, which seems pretty much on the schedule announced when work began back in February. Interior work will begin in December, with DC agencies expected to begin moving in around June 2012. But 3rd and I streets will probably be a bit of a mess as utility work and the construction of the single-deck parking garage continue. My post from March on the parking garage configuration may also be of interest, if you haven't been following along, as might all of my 225 Virginia/200 I posts, going back many years....
And, once you're finished wandering through these shots, how about filling out my Reader Survey? (I PROMISE that this link actually works!) It's only going to be up for a few more days....
 

My post on Wednesday about the rumors of a not-quite-yet-signed tenant for the ground-floor restaurant space at 100 M Street SE shook loose quite a few mouths, and it is unanimous amongst those gabbers that the newcomer in negotiations is Gordon Biersch, the brewery/restaurant that already has a location at 9th and F Streets NW, not too far from the Verizon Center. With 100 M being within sight of Nationals Park, it would seem a plausible destination, assuming the final papers get signed (which does not appear to be imminent). It'll be interesting to see their timeline, especially vis-a-vis the baseball season (getting it done by Opening Day, 5 1/2 months from now, would seem to be a bit optimistic, I think?).
On a 100 percent unrelated note (I really do hate teeny tiny posts, so felt the need to combine these), the Capitol Riverfront BID's latest newsletter is out, and they're asking for respondents for their annual "online perception surveys" for both the BID itself and for the Yards Park.
But don't you dare click on either of those survey links if you haven't yet filled out my readership survey--my feelings will be terribly hurt! (Argh! I'm snakebitten with the dang survey. This link was a bad one until about 9 am on Friday. Sorry! Please try again!)
The BID also is co-hosting a Community Planting Day on Saturday, Oct. 29, from 9 am to noon, along with the US Green Building Council National Capital Region. They're going to plant thousands of daffodil bulbs throughout the neighborhood.
The rest of the newsletter is here.
 

The folks at the Washington Navy Yard are going into spooky mode again this year, offering the "Ghost Ship Barry" on October 28. Ages 12 and under are invited from 5 to 7 pm, with a slightly scarier version open to ages 13 and up from 8 to 10 pm. While RSVPs are not required, they are now instituting a timed ticket entry system, so all parties must check in at the US Navy Museum, where there will be additional children's activities. They're also discouraging costumes. Read the details.
Maybe DDOT can cover a Circulator bus in spiders and webbing to allow easy shuttling along M Street between the Ghost Ship and Truckerboo, being held at the same time.
Are there any other ghostly festivities on tap in the neighborhood? I imagine Capitol Quarter will have a record number of trick-or-treaters this year....
Comments (0)
More posts: Events, Navy Yard
 

Word is starting to bounce around that a tenant is close to being signed for the prime restaurant space in the ground floor of 100 M Street SE, on the northeast corner of 1st and M, one block north of Nationals Park.
As to who the tenant may be, I don't have confirmation, but rumors are mentioning a "semi-chain type place." (I'm trying to find out more, but since recent surveys indicate that 93 percent of all JDLand readers are interested in retail/restaurant news, I'm just going to go with what I've got.)
The location is advertised as 8,500 square feet, and I don't know if this rumored lease is for the entire space (though I imagine it is). One way or another, it will probably be a level of food and dining experience that's a step up from the last eating establishment on that corner, the old On Luck Cafeteria that was demolished five years ago.
I hope it goes without saying that as soon as I know more, I'll pass it along. And please remember that this is all still rumor territory, so until there's an official announcement, don't be skipping meals waiting for the new offering to arrive.
UPDATE: The rumor mill is strong that the not-yet-signed tenant is Gordon Biersch. But there's no official confirmation of that. But I've heard it from enough different places since yesterday to pass it along.
 

Oh, I really wanna know.
After nearly nine years of blindly stumbling along, curiosity has finally gotten the better of me, and I've crafted what is hopefully a quick and easy reader poll. Pretty please, with sugar on top, take a moment to answer some quick questions to help me better understand who's out there reading this stuff I'm still churning out. I want to know why you read, what you read, and how you read it. Your answers will help me as I continue to try to make all of this work be somewhat interesting and useful, given how much the world of a "just a neighborhood blogger" has changed since 2003.
Don't delay! Reply now! (And, oops, if you tried it in the first few minutes and didn't get a "Thanks" page, you ran into a boo-boo I've since fixed, so please try again? Sorry. Sorry.)
(Dang it, I had another half-hour blip between 12:45 and 1:15 where submittals weren't working. I've got to hire a better staff.)
Comments (3)
More posts: JDLand stuff
 

The folks at EYA have passed along that the fourth and final lottery for workforce-housing units at Capitol Quarter was completed on October 1, with 66 people entering for the 12 houses that were made available. (EYA also drew 24 names for a backup list in case any of the chosen 12 withdraw.)
I don't have any of the documents for this round of the lottery (didn't get any notification of it in advance this time around), but here's the information provided for the last lottery, back in March. At that time, household income needed to be under $119,025 in order to qualify, and there were scads of qualifications and requirements that potential lottery entrants needed to be certified as having passed in order to participate.
As for the rest of Capitol Quarter, it is nearing the finish line, with seven or eight market-rate homes left to sell on the second-to-last block (bounded by 3rd, 4th, K, and L), along with the 12 market-rate homes that will be available on the final block on the south side of L between 3rd and 4th (right behind the 300 M Street office building).
This portion of the Capper/Carrollsburg redevelopment should be completed by next summer, with the two phases of the Capitol Quarter townhouse development bringing approximately 120 market-rate houses, 82 workforce-rate units, 25 Section 8 ownership units, and 86 subsidized rental units. This is in addition to the 162 subsidized senior housing units at 900 5th Street and 138 subsidized units at 400 M Street. This leaves five mixed-income apartment buildings and the 250 M and 600 M office buildings still to be built to complete the Hope VI plans that will replace the 707 units of public housing one-to-one, along with constructing an additional 1,000-plus market-rate and workforce-rate units. No timelines have been announced for the next phases.
Comments (0)
More posts: Capper, Capitol Quarter
 

I'm back from a week by the beach in Central Florida--yes, of course we went to Disney, and the Kennedy Space Center, along with logging more than 100 miles of biking along A1A. Here are some small items while I regain my blogging legs:
* The October instance of the Truckeroo food truck festival, appropriately dubbed "Truckerboo," is scheduled for Friday, Oct. 28, from 11 am to midnight at Half and M Streets, SE. In addition to the usual lineup of trucks and the drinks flowing at the Das Bullpen bar, there will be "truck trick-or-treating" for kids from 3 to 5 pm, along with costume contests (kids, individuals, and groups). They're requesting a "one buckaroo" donation this time around, with all proceeds benefitting the King Greenleaf Recreation Center in Southwest. More info here.
* The bridge between Diamond Teague Park and the Yards Park is close to finished, as you can see in this not-totally-fabulous cellphone pic. When it opens, visitors will be able to walk along the west bank of the Anacostia from 1st Street SE (at Nationals Park) all the way to 11th Street SE (as long as the Navy Yard's stretch of boardwalk is open).
* Awnings for Lot 38 Espresso have now gone up at the old Little Red Building site across from Canal Park (reader photo here), along with a "Coming Soon" sign. The owner, Yung Park, told me this afternoon that he's shooting for a Dec. 1 opening date.
* The Nationals have announced that they will be playing a home exhibition game against the Boston Red Sox on Tuesday, April 3, 2012. The team's regular season gets underway on April 5 at Wrigley Field, with the home opener scheduled for April 12, against the Cincinnati Reds. No game times have been announced yet.
 

On Friday morning I was lucky enough to get a wonderfully wide-ranging tour of the 11th Street Bridges project, and of course made sure to have camera in hand to get a pile of photos of the current state of construction. I've put together a gallery of these photos, and will slowly work on adding them to my 11th Street Bridges project page over the next week or so. Some points of note:
* DDOT expects that the new bridges carrying inbound and outbound freeway traffic will open by the end of this year. There will still be plenty of work to do in terms of ramps and connections and other necessary work surrounding those bridges, but at least these new structures will be open fairly soon. (If you haven't been following closely, one of the big "adds" of this entire project is that when completed vehicles will be able to move between the freeway bridges and northbound/southbound DC295 in all directions, which isn't currently the case.)
* The new 11th Street Local bridge, carrying traffic between Anacostia and 11th Street SE by the Navy Yard, is expected to open by fall of next year. However, according to Greater Greater Washington and other outlets, this bridge apparently will not be having streetcar tracks built into it during this initial construction phase as originally designed, because of all manner of bureaucratic falderal I'm too lazy to bother trying to explain here. If this happens, portions of the deck of the bridge would have to be pulled up and redone with the streetcar tracks a few years from now. (On the other hand, the concrete hasn't been poured on this bridge yet, so maybe there's still a chance some folks could figure out a way to get it to happen now?)
* These graphics show the plans for the paths and landscaping under the bridges along the Anacostia Riverwalk Trail (just east of the entrance to the Navy Yard's portion of the riverwalk). They appear to include an interesting little jut-out into the river, on what I imagine is the footprint of the existing downstream bridge.
* If you drive 11th Street north of M and see the big concrete piers popping up to the east, they are for the new flyover ramp that will connect inbound freeway bridge traffic to the Southeast Freeway. Work is also underway on a new ramp that will bring traffic from RFK and Pennsylvania Avenue up to a signalized interchange at 11th Street rather than continuing underneath 11th to the Southeast Freeway. There will then be a ramp from 11th to the westbound freeway, which means that folks who live on the eastern side of Capitol Hill or who work at the Navy Yard will be able to get on the freeway at 11th rather than zooming down Virginia Avenue all the way to 3rd Street.
It's a pretty big project, and I'm giving short shrift to much of the change that will be coming to the connections to the bridges on the east side of the Anacostia, but the new photo gallery should still be interesting, and my 11th Street Bridges Project page can probably help with additional details if you're in need.
The photo gallery also has this stitched-together panorama taken up on the new flyover bridge, but you'll probably want to look at a larger version, since it gives a pretty good look at a large swath of skyline alongside the Anacostia River:
If you missed my batch of photos from last week of the new Southbound 295 flyover bridge that opened over the weekend, here they are.
Comments (5)
More posts: 11th Street Bridges
 

* On Saturday, Oct. 15, a group of neighbors together with Casey Trees is having a tree-planting event in the "triangle park" bounded by Virginia Avenue and 4th, 5th, and I streets, SE. No prior experience is required, and coffee and treats will be provided along with a post-planting lunch for volunteers. More information and how to volunteer here.
* WMATA staff has recommended that "Ballpark" be added to the Navy Yard Metro station name as one of its new "secondary" (subtitle) names, rather than the requested "Navy Yard-Ballpark." However, since there is not yet any organization that has committed to paying for the name change (which a DDOT rep said at a recent ANC meeting would be in the $100,000 range for a two-exit station), WMATA's board will not be voting on this name change at its meetings on Thursday. They will vote on whether to change the Waterfront-SEU station to just "Waterfront," having veteoed the city's request for "Waterfront-Arena Stage" as being over the 19-character length limit and also having a "commercial naming rights issue." (via GGW)
* The ANC 6D October agenda has been sent out (but isn't yet on the web site). In addition to the very important business of giving thumbs up or down to five different races/walks that want to use neighborhood streets, the commission will be getting updates on the 225 Virginia/200 I project and the big DC Water Clean Rivers Project that will be ripping up M Street SE for a number of years. (Won't that be fun if M Street is a construction zone at the same time as Virginia Avenue?)
* DCist spent some time pondering what Nationals Park could be used for during the baseball off-season. (On the other hand, at least baseball stadiums get used 81 times a year. How about FedEx Field, which gets used only eight times for Redskins games and maybe a concert here or there?)
 

Late tonight, DDOT will be opening the new southbound DC 295 flyover bridge, which is the first major phase of completed work on the 11th Street Bridges project. This will shift the flow of southbound traffic so that vehicles merging into 295 from the outbound 11th Street Bridge will be funneled into the left side of the freeway traffic, allowing thru 295 traffic to much more easily access the Howard Road exit without having to weave through the 11th Street Bridge merge flow.
Since this is on the east side of the Anacostia, it's not something I'd normally be writing much about, except that I got to visit the flyover bridge with camera in hand, hours before its opening, as part of a wide-ranging tour of the entire 11th Street Bridges project that DDOT was generous enough to arrange for me. In order to stay ahead of the news cycle, I've posted a quick gallery of images of the new flyover bridge,
But of course these are not the only photos I took, and so early next week look for another batch of images that I'll be posting of the work on the bridges themselves and the new approaches that are being put in place. Work began on the project in late 2009, and DDOT expects that the new inbound and outbound freeway bridges will be open by the end of this year. The new 11th Street Local bridge should open in the second half of next year, with the various new connector ramps being completed soon after. (There is one shot of the new bridges included in this batch that should whet your appetite.)
I'll hold off on the other big news of the project until then as well.
Comments (0)
More posts: 11th Street Bridges
 

The DC approved building permits feed, now back online (thank you!), brings the news today that the raze permit filed in February for the concrete plant on the Florida Rock site across from Nationals Park has now been approved. With the move of the operations around the corner down South Capitol Street to Buzzard Point finished, demolition should be able to get underway fairly soon. (Though whether it actually WILL....)
As we found out a few months ago, site owner Florida Rock Properties has entered into a joint venture with MidAtlantic Realty Partners to move forward on the first phase of the 1.1-million-square-foot "RiverFront on the Anacostia" redevelopment of the site, which they are hoping will be a 200-unit apartment building on the eastern edge of the site (across from the Nationals Park grand staircase at First and Potomac, next to Diamond Teague Park) instead of the office building originally planned. The Zoning Commission will need to approve this change, and that process should be beginning soon. Apparently there will be a presentation on the new plans at the Oct. 17 ANC 6D meeting (though the agenda isn't out yet). Their hope is to begin construction in the spring of 2013.
 

Greater Greater Washington reports that DDOT has formally asked WMATA for four Metro station name changes, with "Navy Yard-Ballpark" being on the list. This seems to put to an end the attempt by the Nationals to add their Curly W to the station name, an idea which was supported by ANC 6D last month. (The BID's desire to have the station renamed "Capitol Riverfront-[Curly W]" also now would appear to have gone by the wayside.)
Also on the list is changing Waterfront-SEU to Waterfront-Arena Stage.
This is the last step in the city's process for requesting station name changes. Now it's up to WMATA to make the final decisions.
Comments (0)
More posts: Metro/WMATA
 

Just sent out by DDOT: "Today the District Department of Transportation (DDOT) announced the start of land acquisition and preliminary design work for the South Capitol Street Project, which includes replacement of the current Frederick Douglass Memorial Bridge. [...] While the Record of Decision (ROD) is still pending, the Federal Highway Administration signed the project's Final Environmental Impact Statement (FEIS) following the requisite 30-day public comment period that ended in May."
I'm posting quickly, so I shall now crib unabashedly from my post on the Final EIS, from back in April:
If you are interested in this subject, there is more verbiage and documentation accompanying the plans than you could ever dream of. (Traffic studies! Environmental consequences! Technical reports!) And I've written a lot about the process, which began more than a decade ago with other studies before the EIS got underway. And I'm sure there will be posts on other blogs delving more specifically into portions of the plans. But, since most people probably want to know "what does this mean for me?", you can see this graphic (from the 224-MB chapter 2 of the FEIS) giving a quick overview of what changes are planned along South Capitol Street if the final EIS is signed off on (and, more importantly, if funding is secured). The short version, for the west side of the Anacostia:
* Add "pedestrian amenities" and enhance the streetcape along South Capitol north of I and along New Jersey Avenue SE north of the freeway.
* Replace the existing ramp to the freeway from South Capitol and I with an at-grade intersection. (This would be a left turn onto a ramp to the freeway from under the freeway, near the current Nats HH economy parking lot.)
* Bring New Jersey Avenue SE back to a 160-foot full right-of-way, and add streetscape enhancements.
* "Reconstruct South Capitol Street as an urban boulevard." This means bringing M Street up to an "at-grade" intersection (no more tunnel), and would include new signalized at-grade intersections to allow traffic to cross South Capitol on K and L streets. (M Street would also get reconstructed between the Halfs [SE and SW].) The section of South Capitol north of M would have the same streetscape that the south portion received during its 2007/08 makeover, with wide sidewalks and a tree-lined median.
* Build a traffic oval at South Capitol, Potomac, Q, as the gateway to a new arched bascule-design Douglass Bridge that would have wide "multi-use trails" (i.e., sidewalks!) in both directions. The existing bridge would be demolished, after the new bridge is built somewhat downriver of the current location.
The Executive Summary (220 MB PDF) gives a good overview of the FEIS and preferred alternative (as it should!), but I also suggest wandering through the Chapter 2: Alternatives section, especially if you came to the neighborhood or JDLand after 2008 and didn't get to follow along during the EIS process, or if you're interested in the additional plans for east of the river, which I'm going to leave to others to discuss. My previous posts on all of this may be of interest as well. If you're wanting to see some of the earlier studies referenced in the FEIS, there are links to them at the top of my South Capitol Street project page.
How much would this all cost? The preferred alternative is priced in this final EIS at $806 million in FY 2014 dollars. (New bridges are expensive, you know.) Note that nothing in today's statement from DDOT says anything about funding, or a construction timeline.
You can also check my South Capitol Street and South Capitol Street Bridge page for all the info about the plans, along with my scores of posts over the past few years.
 

* On October 3, the following changes will be made to the Navy Yard-Union Station Circulator route: "[B]uses will no longer travel west on Constitution Avenue and north on Louisiana Avenue to reach Union Station. Buses will instead stop adjacent to Union Station on Columbus Circle at the flag poles before turning right on F Street, NE and right on 2nd Street, NE to Constitution Avenue. The route will no longer serve the Union Station garage level and the stops located at Louisiana and D Streets, NE will no longer be served." Other Circulator changes--including the end of the SW-Convention Center route and the beginning of an east-of-the-river route that will run down Barracks Row--are listed here.
* DDOT and the Washington Area Bicyclist Association (WABA), along with ANC commissioner David Garber, have launched "Rack Attack," which will result in the installation of 36 new bike racks around Near Southeast. The first one was installed this morning at Cornercopia.
 

At the Ward 6 Redistricting Task Force's meeting on Sept. 22, final recommendations for ANC and SMD boundaries were approved, and the 6D map they are recommending remains close to their original draft proposal, despite 6D's request for substantial changes.
I'm not going to talk about the changes in western Southwest, but you can see on the two maps below the large differences close to and east of South Capitol Street between what the task force is recommending (left) and what the ANC wanted (right) (click to enlarge):
(Task Force final recommendation on left, ANC proposal on right. 6D02 is green, 6D03 purple, 6D07 fuschia)
The task force's original recommendation in August (very similar to the map above left) was for 6D02 to come across South Capitol Street into Southeast, covering the area bounded by I, New Jersey, and N. Then 6D07 would cover the rest of Near Southeast (except for the small cut-out on the northeastern side, which has been and will continue to be in ANC 6B). This would mean that 6D07/Near Southeast commissioner David Garber's current address would no longer be in 6D07 but instead in 6D02, where commissioner Cara Shockley also still resides under the new boundaries.
This, with a number of other changes that the 6D commissioners disapproved of, moved them to proffer their own map (above right), which kept 6D02 all in Southwest and instead expanded chair Ron McBee's 6D03 SMD across South Capitol, in such a way that Garber's block would remain in 6D07. (It also had 6D07 coming west across South Capitol for one small block, bounded by South Capitol, M, Carrollsburg, and N.) Cara Shockley vehemently disapproved of this map at the commission's September meeting, while Garber did not vote on it (citing what he described as his constituents' desire to be instead be a part of ANC 6B).
I was not at the task force's Sept. 22 meeting, but the ANC's arguments do not appear to have held much sway, and the final 6D map being recommended by the task force (above left) is very similar to the original draft map, at least in terms of how it handles blocks east of South Capitol.
The task force will be meeting again on Monday, Sept. 26 at 6:30 pm at 1100 4th St. SW (DCRA hearing room) to approve the report that will "include the narrative to explain the recommendations as well as the required text description of the ANC/SMD boundaries." That report and the maps will then be submitted to Tommy Wells on Sept. 28, who will then submit Ward 6 redistricting recommendations to the council on Sept. 30.
UPDATE: Guess it wouldn't hurt to include a link to the current 6D SMD boundaries.
Comments (6)
More posts: ANC News, redistricting
 

Readers are reporting that late Saturday night three or four shots were fired on the Southeast Freeway that resulted in a bullet going through a window of one of the houses in the 300 block of Virginia Ave. SE, with the one of the bullet's shards then ending up either lodged in or very near the bassinet of a 5-day-old baby. No one in the house was injured. The gunfire seems to have been the result of people in one car on the freeway shooting at another car.
There's no police report anywhere as yet, so these are only details I'm getting from readers, but perhaps more information will become available. (I've sent a request into the MPD 1D mailing list.)
UPDATE: This is Commander Hickson's reply to my question on the MPD-1D list: "There was a shooting on the Freeway that involved a passenger in one moving vehicle firing at another moving vehicle. As a result of that shooting a shot struck and entered a private premise in the 300 block of VA Ave SE, causing damage to the home and the targeted vehicle. Thankfully, no one was injured in the vehicle or the home. The only description that was provided was for a black "luxury" vehicle, occupied by three subjects."
UPDATE II: Here's WJLA's story on the episode (though goodness, it needs a copy editor desperately). And Fox5's.
Comments (1)
 

A little birdie tells me that the National Geospatial Intelligence Agency folks are having a "site closure ceremony" sometime next week for their operations on the southeast corner of 1st and M, SE. (You know, the place with hardly any windows and the guys out front with guns.) As part of the Base Realignment and Closure (BRAC) process, their operations have moved to swank new digs down at Ft. Belvoir.
The closure ceremony is apparently for "cleared personnel only."
This site, officially known as Building 213 from the old Navy Yard/Southeast Federal Center days, is on the footprint of the Yards and as expected to be home to an office building someday, but not anytime soon.
In the meantime, maybe that parking lot will become available to the public?
Comments (3)
 
2693 Posts:
Go to Page: 1 | ... 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 ... 270
Search JDLand Blog Posts by Date or Category