Since January, 2003
            
 (a random before-and-after moment)
April 27, 2006
June 16, 2018
1st at L, Looking South-Southeast (see more)

At the Ward 6 Redistricting Task Force's meeting on Sept. 22, final recommendations for ANC and SMD boundaries were approved, and the 6D map they are recommending remains close to their original draft proposal, despite 6D's request for substantial changes.
I'm not going to talk about the changes in western Southwest, but you can see on the two maps below the large differences close to and east of South Capitol Street between what the task force is recommending (left) and what the ANC wanted (right) (click to enlarge):
(Task Force final recommendation on left, ANC proposal on right. 6D02 is green, 6D03 purple, 6D07 fuschia)
The task force's original recommendation in August (very similar to the map above left) was for 6D02 to come across South Capitol Street into Southeast, covering the area bounded by I, New Jersey, and N. Then 6D07 would cover the rest of Near Southeast (except for the small cut-out on the northeastern side, which has been and will continue to be in ANC 6B). This would mean that 6D07/Near Southeast commissioner David Garber's current address would no longer be in 6D07 but instead in 6D02, where commissioner Cara Shockley also still resides under the new boundaries.
This, with a number of other changes that the 6D commissioners disapproved of, moved them to proffer their own map (above right), which kept 6D02 all in Southwest and instead expanded chair Ron McBee's 6D03 SMD across South Capitol, in such a way that Garber's block would remain in 6D07. (It also had 6D07 coming west across South Capitol for one small block, bounded by South Capitol, M, Carrollsburg, and N.) Cara Shockley vehemently disapproved of this map at the commission's September meeting, while Garber did not vote on it (citing what he described as his constituents' desire to be instead be a part of ANC 6B).
I was not at the task force's Sept. 22 meeting, but the ANC's arguments do not appear to have held much sway, and the final 6D map being recommended by the task force (above left) is very similar to the original draft map, at least in terms of how it handles blocks east of South Capitol.
The task force will be meeting again on Monday, Sept. 26 at 6:30 pm at 1100 4th St. SW (DCRA hearing room) to approve the report that will "include the narrative to explain the recommendations as well as the required text description of the ANC/SMD boundaries." That report and the maps will then be submitted to Tommy Wells on Sept. 28, who will then submit Ward 6 redistricting recommendations to the council on Sept. 30.
UPDATE: Guess it wouldn't hurt to include a link to the current 6D SMD boundaries.
Comments (6)
   
 
 More About ANC News
 All posts: ANC News, redistricting

JDLand.com Home

Comments

Bob Craycraft, ANC 6D01 Commissioner says: (9/27/11 12:00 PM)
If I may chime in on western Southwest, there is a huge problem with the funny little "panhandle" coming out of the east side of 6D01 (the red SMD) in that the purple across the street represents one of four HOA's of identical townhouses that have always been in the same SMD. Removing THM3 from THM1, 2, and 4, would certainly fracture a community of common interest.


MJM says: (9/27/11 2:47 PM)
It would have been nice to see both Half St and the stadium included in that piece of Near-SE that is now part of SW. Half St and the Stadium will be tied together once built. If you are going to split Near-SE it would have been nice to tie the high rises along with Half St/Stadium together since that area (high rises) will be impacted by stadium traffic/events/planning.


JD says: (9/27/11 4:03 PM)
I think that if Near SE had been big enough to have two SMDs completely east of South Capitol, there would have been a setup like you are suggesting, probably right down 1st Street all the way to the river. But, in the current setup, that green 6D02 might have looked kind of odd to be stretching that far south, and after all the areas east of 1st (Yards) are closely connected to the stadium doings as well.

(Also gives the Near SE SMD some say in what happens with the reconstruction of South Capitol Street and the Douglass Bridge.)



JD says: (9/29/11 9:57 AM)
One interesting thing about the task force boundaries that I hadn't noticed until reading their final report posted today: link Their configuration (especially of 6D02) ensures that all seven 6D single member districts touch M Street.


dhdc says: (10/2/11 8:46 PM)
Living in Southwest sometimes I feel like a red headed step child, or a skunk at a garden party, or an ugly guy trying to impress a cute girl in Near Southeast . . .


MJM says: (10/4/11 7:15 PM)
Hey dhdc - some of us are joining you in SW so you might be hooking up with the ugly girl from Near-SE instead of the cute one.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

jdc on CSX East Three-Building: The continuing increase in vehicular and pedestrian traffic in JD land requires ...
JES on CSX East Three-Building: That 4th & M light needs updating. They either need to make the left turn ar...
202_cyclist on CSX East Three-Building: Happy Park-ing Day! We met a great group of volunteers setting up wildflowers o...
202_cyclist on CSX East Three-Building: Walt— we saw it as the police were towing away the vehicle. We heard from a bys...
walt on CSX East Three-Building: Any info on the car v. pedestrian accident at Harris Teeter yesterday (9/19)? I...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/21/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/19/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/16/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/15/19
70 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/15/19
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 09/13/19
300 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/19
400 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/11/19
400 B/O M ST SE   THEFT
Shoplifting
 09/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/09/19
54 M ST SE   BURGLARY
Burglary Two
 09/07/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/05/19
400 B/O M ST SE   THEFT
Shoplifting
 08/30/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/28/19
800 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O L ST SE   ROBBERY  08/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/23/19
300 B/O K ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 08/23/19

Recent Issued Building Permits Archive  
1346 4TH ST SE   
09/11/19 
FC 1346 HOLDCO I LLC / null
E1911472 / SUPPLEMENTAL
900 5TH ST SE   
08/30/19 
CAPPER CARROLLSBURG VENTURES, LLC / DFM DEVELOPMENT SERVICES, LLC
B1906215 / CONSTRUCTION
Reconstruction of 4-story residential building, the Arthur Capper Senior Center, damaged by fire.
200 I ST SE   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904525 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904526 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904529 / POST CARD
100 M ST SE 9TH FLOOR   
09/05/19 
SQUARE 743 INC / DAVID FLEMING; DAVID FLEMING
P1909280 / SUPPLEMENTAL
100 M ST SE   
09/05/19 
SQUARE 743 INC / FREDERICK S. DONHAM; FREDERICK S. DONHAM
P1909275 / SUPPLEMENTAL
ONE OPEN SITE DRAIN
250 M ST SE   
08/26/19 
null / ;
P1908962 / SUPPLEMENTAL
   
08/27/19 
SQUARE 769 LLC / STEVEN CHEN
AH1901196 / CONSTRUCTION
After hours permit is respectfully requested from 3am to 7am daily.
   
09/04/19 
SQUARE 769 LLC / JEFFREY D WOLF
AH1901226 / CONSTRUCTION
After hours permit respectfully requested from 3 am to 7 am daily.
410 M ST SE   
09/16/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MICHAEL B. BELL; MICHAEL B. BELL
E1911625 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
08/26/19 
CSX TRANSPORTATION, INC / ; N/A; TBD
R1900100 / CONSTRUCTION
RAZE 1 STORY WOOD FRAMED STRUCTURE
880 NEW JERSEY AVE SE   
09/20/19 
880 NEW JERSEY AVENUE LLC / PATRICIA J STAUB
BP1904750 / POST CARD
1275 NEW JERSEY AVE SE   
09/03/19 
UNITED STATES OF AMERICA / PARKER HARRELL; PARKER HARRELL
SB1900287 / CONSTRUCTION
We propose to furnish and install fifteen (15) gravel packed wells, fourteen (14) around the perimeter, and one (1) at the elevator pit. We will also be installing 3 monitoring wells and potentially 5 contingency wells. We will only pump from up to 15 wells at a time. All wells will be located in a mutually agreed layout. The wells will be installed by advancing up to a 10.25 I.D. hollow stem auge...
125 O ST SE   
09/13/19 
DISTRICT OF COLUMBIA / FRED T FALCONE; JOSEPH SCRIBELLITO
SB1900423 / CONSTRUCTION
Soil borings to collect samples and installed a grouted in place vibrating wire piezometer approximately 30 feet below grade. Two geotechnical soil borings to 75 feet below grade, and 3 soil borings to 20 feet below grade with 5 feet of coring though buried foundations.
301 TINGEY ST SE C-1   
09/03/19 
SEFC 160, LLC / JEFF NOLD
AH1901221 / CONSTRUCTION
Work will occur on 3rd Street SE between Tingey St SE & Water St SE. We will be assessing and providing a CCTV inspection of a sewer line.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.