|
| ||||||||||||||||||||





|
Comments (0)
|
|
Comments (0)
More posts:
Nationals Park, Stadium Events
|
|
Comments (0)
|

|
Comments (0)
|
|
Comments (0)
|
|
Comments (0)
More posts:
Nationals Park
|
|
Comments (0)
More posts:
parking, Nationals Park
|
|
Comments (0)
More posts:
Nationals Park
|
|
Comments (0)
|


|
Comments (0)
More posts:
Nationals Park
|
|
Comments (0)
More posts:
Capper, Capitol Quarter
|
|
Comments (0)
More posts:
Nationals Park, Stadium Events
|
|
Comments (0)
More posts:
Capitol Riverfront BID, US Dept. of Transportation HQ
|

|
Comments (0)
More posts:
Nationals Park
|
|
Comments (0)
|
|
Comments (0)
More posts:
Nationals Park
|

icon is a bit misleading on some of these, because it's still showing for pics taken in April that I didn't update this time around (but perhaps you missed them in the ballpark whirlwind, anyway). And use the
icon to see the range of photos between the "before" and the "after." I hope to get some more photos this weekend, weather permitting.|
Comments (0)
|
|
Comments (0)
More posts:
100 M, 1015 Half, 1111 New Jersey/Insignia on M, One Hill South, 250 M/New DDOT HQ, 55 M St., 909 New Jersey, Boilermaker Shops/Yards, Capitol Hill Tower, Florida Rock, Foundry Lofts/Yards, jpi, Monument Valley/Half St., Onyx, Retail, Square 743N, Square 697n, Nationals Park, The Yards, Twelve12/Teeter/Yards, Yards Park
|
Thanks to reader E. for the tip that demolition work is underway today along Half Street between I and K, where the little gray Alpha Towing building stands; as of earlier this morning, the brick wall was apparently down. This is the site of JPI's planned 23 I Street apartment building, which is expected to start construction by early fall. I don't yet know the fate of Wendy's next door, which is also part of the 23 I site and which was supposed to be closed down as of today. I will go check it out as soon as the rain stops. (This frickin' weather, I am so tired of it. And it scuttled plans I had today for something cool, which hopefully will happen next week--you'll have to wait to find out what it is. So do a sun dance!)
UPDATE: Yup, all gone. Building #152 demolished since 2003. Wendy's is still open, though, and one of the workers there told me they're open through the end of June. I've added a few new photos on my 23 I page to show the changed landscape as of this afternoon. (The sun appeared about 20 minutes later. Damn you, Old Sol!)|
Comments (0)
|
GlobeSt.com has a brief on 1015 Half Street, the 400,000-square-foot office building by Opus East on the site of the old Nation nightclub along Half, K, and L streets. Excavation started last month, and they're looking at a spring 2010 completion date. It will be certified LEED silver at a minimum, and possibly even reach gold status. It's being built on spec, with no tenants signed yet. There's the possibility for ground-floor retail (the zoning for the site doesn't require it), and there will be three floors of underground parking, which I imagine will be available for Nats parking. You can see my 1015 Half page for photos of the site, though I haven't updated them since digging started. (Hope to get a new batch soon.)|
Comments (0)
|


























