It took a while for the weather and the calendar to successfully dovetail, but on Sunday the JDLand Camera finally got a look at the new plaza now nestled between Diamond Teague Park and Dock 79, as well as the extension of the Anacostia Riverwalk westward. (I missed out on the fountains, though.) Once The Salt Line and All-Purpose open in their spots next year, and baseball fans figure out that there's a spot to hang out on the stadium's southeastern side (with handy built-in tables to eat carryout pizza at), this may become a pretty activated location. Especially in comparison to what it looked like 11 years ago.
JDLand.com Home
202_cyclist says: (10/19/16 3:36 PM)
My wife and I walked over there on Sunday afternoon. The public spaces of this site are very nice. On the western side of this, towards the proposed Bardo site, there is quite a bit of space. It would be nice if the Capitol Riverfront BID sponsored some kind of activity or seasonal events there, like a Saturday farmer's market, etc... I can only imagine how nice this location will be once the outside dining opens.
202_cyclist says: (10/19/16 3:38 PM)
Those photos would have looked even better if the Nationals were still playing now...
RMP says: (10/19/16 3:39 PM)
Great pictures. I also checked this out last weekend. Nice space. Dock 79 seemed completely deserted at the time. We could see pretty clearly into a bunch of units facing the river and it didn't look like any of them were occupied. I guess it only started move-ins a couple months ago so maybe it's still pretty empty.
SWag says: (10/19/16 3:46 PM)
Happy to have the new addition, but that brown surface looks horrible...
JD says: (10/19/16 3:50 PM)
There will also be prime seating for watching the Douglass Bridge construction/demolition.
Chaifetz10 says: (10/19/16 3:54 PM)
@202: Dock79 is still building out the dog park and volley ball courts. Landscaping just went in yesterday and they're on track to have them completed in the next few weeks. Look for the construction fence to come down soon after. @RMP: Move ins are happening almost on a daily basis. It appears that most have been on the South half of the building as only see a few people on the North end of the court yard from our unit. Construction crews are still finishing the rooftop deck so it's still not open to residents... and I can see cleaning crews on some of the top floors getting units ready for move ins as well.
walt says: (10/19/16 4:26 PM)
Those seats look like prime viewing for bands on a barge! We need a Barge Band ASAP!
CJBabyDaddy says: (10/19/16 10:16 PM)
If you know any barge bands auditioning to fill an inexperienced kazoo virtuoso vacancy, I can give you my agent's contact info to pass along.
dcgent says: (10/20/16 3:42 PM)
Had a long talk with a Bardo bartender last weekend. Those are its fermentation tanks farther down near the bridge. They're still quite confident of moving into that space by spring time--despite some roadblocks--and I guess they can brew beer there in any case? They say the developer doesn't want to do that third site until the old bridge is own/new is up, so they think they could have a cool beergarden site for 2-5 years. might add a pizza oven outside for slices, etc though the new pizza place is there. We'll see if they can pull it off.
JD says: (10/23/16 9:08 PM)
Nah, I was just filling in some holes this morning and testing my new camera some more.
But maybe some tidbits are in the offing.
E. Masquinongy says: (10/24/16 8:42 AM)
Regarding the Douglass Bridge demo, when will that start?
JD says: (10/24/16 9:04 AM)
They haven't even awarded the design/build contract yet for the Douglass Bridge. I can't imagine it's anything less than a year away.
NavyYahd says: (10/26/16 2:00 PM)
Does anyone know what the plan is with what appears to be landscaping in the lot across from Park Chelsea?
202_cyclist says: (10/27/16 12:09 PM)
Construction is definitely underway for the new DC Water and Sewer Authority headquarters. I saw that a barrier was installed around the perimeter of the construction and a construction crew was remove the current concrete and pavement at the site.
jdc says: (10/27/16 3:30 PM)
I've said it for other parts of the area, but turning the lower 1st St. corridor into something other than the dump it is will have a HUGE impact on JD Land.
JD says: (10/28/16 3:36 PM)
Did not really intend to go quiet this week, but gears are kind of shifting in Mr. JDLand's treatment, and so my focus is elsewhere right now as we try to get everything lined up. (He's still feeling pretty good, though.)
jdc says: (11/1/16 12:58 PM)
Paper signage on doors of Homewood Suites says "coming soon".
202_cyclist says: (11/3/16 2:46 PM)
Of possible interest -- this was sent on the Capitol Hill listserve last week. I'll be attending this meeting. =================================================================== The DC Office of Planning (OP) is amending the District’s Comprehensive Plan, a 20-year framework that guides future growth and development in the city and shapes the places we live, work, shop, and play. OP launched the second amendment cycle to the Comprehensive Plan this year to ensure that the Plan remains responsive to the needs of the community. Your ideas are essential to a successful amendment process. Between October 19th and November 14th, OP is hosting a series of 7 community meetings. The meetings are organized geographically by Area Elements. Since the Comprehensive Plan is a 20-year plan, the Plan uses Area Elements instead of Wards since Ward boundaries can change every ten years. Please RSVP and check out the map to find a meeting closest to you. For more details about the Comprehensive Plan, Area Elements and the Amendment Process, please visit PlanDC.dc.gov and sign up for alerts. Please join us for a meeting in your area element which includes Capitol Hill/Lower Anacostia/Near Southwest: Date: Nov 3rd Location: Jefferson Academy Middle School Academy, 801 7th Street SW Nearest Metro: L’Enfant Plaza Time: 6:00-8:30pm (presentation starts at 6:30) Contact the DC Office of Planning at PlanDC@dc.gov or 202-442-7600 and follow us on Twitter at @OPinDC #PlanDC #DCCompPlan. Come learn about the amendment process, share your ideas and help shape the future of the District!
dude says: (11/6/16 9:23 AM)
Walked over there last night for the first time since the new stuff was put in. Looks like a good hang out area before Nats games for people that are into that sort of thing. Did anyone else find Side Yards much more lame than in previous years?
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2018 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
530ish-unit apartment building in two phases, on old McDonald's site. Construction underway early 2017, completed summer 2019.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
Meridian on First
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
DC Crossing/Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail in two phases. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
37 L Street Condos
11-story, 74-unit condo building west of Half St. Underway early 2019.
CSX East Residential/Hotel
225ish-unit AC Marriott and two residential buildings planned. Digging underway late summer 2019.
1000 South Capitol Residential
224-unit apartment building by Lerner. Underway fall 2019.
Capper Seniors 2.0
Reconstruction of the 160-unit building for low-income seniors that was destroyed by fire in 2018.
Chemonics HQ
New 285,000-sq-ft office building with 14,000 sq ft of retail. Expected delivery 2021.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
1100 B/O NEW JERSEY AVE SE
|
| BURGLARY
Burglary Two
| 11/26/20
|
UNIT B/O M ST SE
|
| ROBBERY
| 11/25/20
|
1000 B/O NEW JERSEY AVE SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/24/20
|
UNIT B/O I ST SE
|
| ROBBERY
Carjacking
| 11/23/20
|
200 B/O M ST SE
|
| ASSAULT WITH A DANGEROUS WEAPON
| 11/22/20
|
UNIT B/O I ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/22/20
|
700 B/O L ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/22/20
|
1000 B/O 3RD ST SE
|
| ROBBERY
| 11/21/20
|
1200 B/O 1ST ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/19/20
|
UNIT B/O M ST SE
|
| THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
| 11/18/20
|
1000 B/O HALF ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/12/20
|
1100 B/O 2ND PLACE SE
|
| MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
| 11/12/20
|
1000 B/O 8TH ST SE
|
| THEFT
Theft First Degree (theft From Building)
| 11/12/20
|
1000 B/O HALF ST SE
|
| THEFT FROM AUTO
Theft (theft Of Motor Vehicle Parts Or Accessories)
| 11/10/20
|
400 B/O M ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/05/20
|
300 B/O L ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/05/20
|
900 B/O 4TH ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/01/20
|
UNIT B/O I ST SE
|
| THEFT
Theft First Degree (shoplifting)
| 10/31/20
|
900 B/O HALF ST SE
|
| MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
| 10/29/20
|
300 B/O TINGEY ST SE
|
| ROBBERY
Carjacking
| 10/29/20
|
1300 B/O 4TH ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 10/28/20
|
|
Recent Issued Building Permits
| Archive
|
|
1200 1ST ST SE
|
|
11/04/20
PEPCO / DONNA G GRAHAM
AH2100169 /
CONSTRUCTION
WO #16029084 / 02 - 1200 1ST ST SE - PEPCO / WA CHESTER TO REMOVE AND INSTALL CABLES MONDAY THROUGH SATURDAYS FROM 9PM TO 6AM STARTING 11 / 5 / 20 TO 12 / 5 / 20
|
1018 3RD ST SE
|
|
11/10/20
DAVID A LEINER / null
E2101357 /
SUPPLEMENTAL
|
1300 4TH ST SE 1001
|
|
11/03/20
YAAN REAL ESTATE LP / null
P2100950 /
SUPPLEMENTAL
|
1300 4TH ST SE RU-1
|
|
11/19/20
AP BOWER RETAIL LLC / null
E2101650 /
SUPPLEMENTAL
|
1057 5TH ST SE
|
|
11/05/20
PAM HARDER / null
E2101183 /
SUPPLEMENTAL
|
82 I ST SE
|
|
11/12/20
STARRY / null
E2101432 /
SUPPLEMENTAL
|
330 K ST SE
|
|
11/09/20
MINDY J SHAW / CASEY CHARKHABI; NA
B2008664 /
CONSTRUCTION
Adding a bathroom on the first floor
|
|
|
11/10/20
JINGSONG XIA / null
P2101107 /
SUPPLEMENTAL
|
100 M ST SE
|
|
11/12/20
LHREV WASHINGTON M ST LLC / null
P2101170 /
SUPPLEMENTAL
|
|
|
11/12/20
SQUARE 743 INC / ;
P2101121 /
SUPPLEMENTAL
|
139 N ST SE
|
|
11/10/20
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW; BROOKFIELD DEVELOPMENT
B2004436 /
CONSTRUCTION
NEW CONSTRUCTION 10-STORY PLUS PENTHOUSE APARTMENT BUILDING WITH 379 UNITS. PROPOSED GROSS FLOOR AREA: 225,000 SF.
SH2000028 issued
|
1275 NEW JERSEY AVE SE
|
|
11/04/20
USA / null
E2101168 /
SUPPLEMENTAL
|
|
|
11/09/20
BROOKFIELD PROPERTIES / TIM GOOD
BP2100588 /
POST CARD
|
71 POTOMAC AVE SE APT 1208
|
|
11/02/20
null / NA NA NA
EHOP20957167 /
HOME OCCUPATION
|
71 POTOMAC AVE SE
|
|
11/04/20
RIVERFRONT HOLDINGS II, LLC / null
M2100380 /
SUPPLEMENTAL
|
|
|
11/04/20
RIVERFRONT HOLDINGS II, LLC / null
P2100978 /
SUPPLEMENTAL
|
|
|
11/09/20
MRP REALTY / null
E2101319 /
SUPPLEMENTAL
|
227 TINGEY ST SE
|
|
11/18/20
FC 227 LLC / null
E2101630 /
SUPPLEMENTAL
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|