Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: The Yards
See JDLand's The Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


504 Blog Posts Since 2003
Go to Page: 1 | ... 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 ... 51
Search JDLand Blog Posts by Date or Category

Not that there's probably anybody left in town (*tap* *tap* -- is this thing on?), but just in case, here's a few items before I downshift into low-posting holiday mode over the weekend and into next week:
* My Ballpark and Beyond column in today's Post covers some of the latest news on retail (i.e., banks) I've posted here over the past few weeks (Wachovia at 20 M, SunTrust at 100 M, plans for 900 M). There's also a blurb on the month-old news of the zoning approvals for the Waterfront Park at the Yards. The column normally appears in just the District Extra, but If you live in Prince George's County, you got a crack at it this week as they snuck it in on page 11 of the P.G. Extra, too. But note that we're scaling way back on how often the column will appear (probably just monthly from now on) since the news isn't flowing as fast and furious-ly as it was last year.
* No one's invited me to the roof of any of the sparkly new Near Southeast buildings to watch the fireworks. I'll say it: I'm miffed. I do and I do and I do for you people, and this is the thanks I get.... [/sarcastic martyr mode off]
* I've tinkered again with the big homepage map, trying to have it make a little more sense. I've added checkmarks for the completed projects, and turned the list of projects down the left side (marked on the map with boxes) into only ones that are under construction or ones which the developers have done an especially good job of making me believe they'll start soon. The rest of the map is a whole lot of stars marking proposed projects. And they're all color-coded to differentiate between office, residential, and recreational/retail.
My real desire is to completely redesign the homepage, but I haven't had any inspirations come to me yet. Although, in the meantime, I've added another three random before-and-after photo pairings down on the bottom right of the homepage (after you do a lot of scrolling), just to fill some space. I also expanded my Neighborhood Blogs list of links.
Happy 4th, everyone!
Comments (0)
More posts: 900m, Retail, The Yards, Yards Park, zoning
 

Today is the city council's monthly legislative meeting, and since they don't have one in August, this one--like all July ones--has an agenda a mile long, with a few items related to Near Southeast:
There's an emergency bill to correct a problem with the 2005 bill that transferred Tingey Street to the city--a drafting error apparently drew the road through part of the Pattern Shop Lofts.
And the "Taxation Without Representation Federal Tax Pay-Out Message Board Installation Act of 2007" (Bill 17-0028) is finally getting a vote--this is the bill that would put electronic tote boards on the Wilson Building and the ballpark showing the federal taxes that District residents pay while still having no votiing representation in Congress. You can read more about it here and here--I don't know if the bill being voted on today has the same language as the original one introduced in 2007, since the council was told pretty clearly by the Sports and Entertainment Commission that the stadium's lease agreement states that the Nationals control the signage on the stadium's interior, exterior, and perimeter, and the DCSEC's outside counsel feels that this tote-board bill "could conflict" with the lease.
But first up, on the consent agenda, is the bill to close the alley between South Capitol and Van just north of the old BP Amoco station on N Street across from the ballpark. This request is coming from Monument Realty, so they can combine the Amoco lot with the parking lot to the north of the alley and develop the site as a residential building with somewhere between 180 and 210 rental units, with 15 or 16 of them being affordable units priced at between 50 and 80 percent of the area median income. There would also be about 14,000 square feet of ground-floor retail.
I failed my fiduciary duty to ever post a summary of the hearing on this bill held back in May, but most of what was said at the council hearing wasn't too different from the presentation about the closing to ANC 6D in January. Monument's representatives told the council that they would expect to start the project approximately 18 months after receiving the alley closing (depending on market conditions, of course), meaning it wouldn't deliver before 2011. Monument is not so far committing to any sort of LEED certification for the building (though I imagine that changes if they don't build it before the city's new green building laws go into effect). The project would also need a Capitol Gateway Overlay Review by the Zoning Commission.
The hearing starts at 10 am, and can be seen on DC Cable 13 or via streaming video. I'll update this entry later today with the various outcomes.
UPDATE: I haven't started watching the proceedings yet (I'll be spending my evening fast-forwarding through them), but the Post's DC Wire blog has an entry on another bill of interest being brought up today, to improve upon the locations carved out for street vendors near the ballpark (here's the map). Some council members want the vendors much closer (presumably, along Half and N streets), which the Nationals and MLB are not much in favor of. Other council members say that bringing the vendors closer should wait until the construction near the ballpark is completed. We'll see what happens with the bill today.
FAST-FORWARDING UPDATE: What more could I want to do with my evening than to sit here speeding through 8-plus hours of city council proceedings? Here's what I'm finding:
* The Square 700 alley closing passed its first reading on the consent agenda.
* The Tax Pay-Out Message Board bill passed its first reading--Chairman Gray said that the second message board would be built "on public space near the Washington Nationals baseball stadium," which gets around the problems I described above with the original bill. Apparently Chairman Gray had discussions with the Nationals earlier this year about putting the sign at the ballpark, and the Nationals did not indicate any sort of desire to have the sign, so the compromise was hatched to put it on public land near the ballpark (I'm trying to find out where). Marion Barry pronounced himself "appalled" at the Nationals' refusal to put up the sign at the city-funded ballpark, calling the team "not good citizens." The sign at the Wilson Building is to be erected in time for the 2009 presidential inauguration, so that the entire parade can march right past it.
* The "Tingey Street, SE Right of Way Amendment Emergency Act of 2008" passed its first reading, so the street will no longer run through Building 160. Whew!
* I'm going to address the vending expansion bill in a new entry. Check back later for that.
 

I've been coveting electronic versions of the newer twilight-styled renderings of upcoming Yards projects, which have been taunting me from the fence drapings along Tingey and Fourth streets; and now I've gotten my mitts on them. Above is an overhead shot of the Waterfront Park, showing not only the various landmarks planned for this stretch along the Anacostia, but also perhaps a first peek or two at designs for some of the later-phase buildings to the north of the 5.8-acre park. I've also now got dusk-time renderings for the brown-and-white Pattern Shop Lofts apartment building and the retail-to-be Boilermaker Shop. All three of these projects should open in 2009 (though the park's piers and retail pavilions will be happening in future phases).
 

If you've been wondering what this white tent-like structure is at the First and N entrance to The Yards (across from the ballpark), the nice folks at Forest City have told me it will be "The Yards Pavilion," which they describe as a "sort of marketing gallery for the project that will be open and staffed on home game dates for the Nationals for the remainder of the summer months. It will contain exhibit panels dealing with the proud industrial history of The Yards site as well as info and images of the development components to come. There will also be a fun 'Yards Personality Quiz' and helpful folks on hand to answer questions." It will also become home to the "Yards Street Team" that has been roaming the area during Nats weekend home games handing out Yards marketing material. The pavilion will make its official debut during the July 8 Nats home stand.
Comments (0)
More posts: The Yards
 

* Sorry I missed this until now: the Post reported that on Saturday evening "[a] motorcycle was headed west on M Street SE about 6:30 p.m. when a car traveling south on Seventh Street began to turn onto M Street. The car and motorcycle collided, and the motorcyclist was fatally injured, police said."
* The Post's Grounds Crew blog has only now discovered that there's a Five Guys just around the corner from the Navy Yard subway station east entrance (on Second Street north of M, if you haven't discovered it yet, either).
* The PSA 105 mailing list announced yesterday that they are having a "Summer of Safety Ice Cream Social" at Capitol Hill Tower "to show unity with the citizens of Capitol Hill and the Metropolitan Police Department by sharing some nice and cool ice cream while sharing information." The message said that the social is from 2 to 5 pm on June 25. A Wednesday afternoon? I wrote asking for confirmation, but haven't heard back. Anyone out there with the {ahem} scoop?
* Washington City Paper and WBJ both note layoffs at MacFarlane Partners through the prism of how it might affect the drive to put a soccer stadium at Poplar Point; I see the news and wonder about the capital that MacFarlane is supposed to be investing in both The Yards and Monument Realty's Half Street.
* Is the report in the July Southwester that Monument Realty and the Corcoran Gallery have received zoning approval to delay to 2015 (from 2011) their planned redevelopment of the the Randall School site at Half and I SW something to wonder about, too?
* And, while I'm heading off the reservation with all of this wondering, did anyone else read this Post story on fuel prices causing problems for school districts' transportation budgets and ponder whether buses would have to drive farther to and from their daily routes from a parking lot at DC Village as compared to one at Second and M, SE?
 

There was a big pile of news this past week from Near Southeast, so I'll boil it down to bullet points and links in case you couldn't keep up:
* Construction is really about to begin on the first townhouses at Capitol Quarter, now that financing has been closed for the public housing units;
* The first phase of the waterfront park at The Yards got the thumbs up from the Zoning Commission, and is expected to be completed by summer 2009;
* Onyx on First will be opening its first five floors of apartments in late July or early August, and initial rents have been announced;
* 100 M will be substantially completed in November, and tenants should start moving into the office building early in 2009. SunTrust Bank is the first retail tenant, and the developer is looking for restaurants for the other spaces;
* The planned office building at 250 M got Zoning Commission approval for a modification to its design; and
* Street vendors will start popping up for ballgames north of M Street on Tuesday (June 3). You can see the map of where they'll be.
 

In what chair Anthony Hood remarked might have been the Zoning Commission's first-ever landscape architecture-only case, the Zoning Commission on Thursday night approved the design for the first phase of the waterfront park at The Yards, the nearly 6-acre green space along the Anacostia River on the site of the once walled-off Southeast Federal Center. My project page has a number of the renderings that were displayed during the presentation, and additional descriptions of what's planned for the site can be found in these two blog entries.
Representatives of Forest City said that they are committed to opening the first phase of the park in the summer of 2009. The second phase, which will include the renovation of the Lumber Storage Shed and the construction of other retail pavilions and buildings, is expected to come before the Zoning Commission this fall. Phase 3 will be the piers and marinas. Somewhat surprising was the news that the floating boardwalk connecting the Great Lawn on the western side of the park to Diamond Teague Park and the ballpark is now going to be built by the city as part of the construction of Teague rather than by Forest City as part of this park.
Much of the discussion by the zoning commissioners (that I saw--I watched from home in my fuzzy slippers and the webcast went wonky a few times in the middle) centered around the pedestrian bridge that runs across the bulkhead and the new freshwater canal. Its very "forward" design---described by Commissioner Etherly as an "aggressive architectural play" and by vice chair Jeffries as a "Slinky," a moniker that I'm sure the developers would probably prefer to not catch on--was not met with universal acclaim. The commissioners did seem recognize its intended role as a piece of art and one of the iconic elements of the park. Jeffries emphasized--and others agreed--that because the designs for the buildings and for the "art tower" are coming at a later date, the bridge is setting the stage for the rest of the architecture at the park, and that the future designs must play off what the bridge has started.
Peter May did not like the bridge (though I missed a lot of his comments because of the webcast problems). He expressed a worry that the bridge, along with the not-yet-designed art tower and whatever's planned for Poplar Point, could create a series of "Look at Me" moments along the Anacostia, all trying to compete for attention. "The 'Look at Me' moment for a waterfront park should be the river itself," he said.
There were also discussions of the lighting plans, and concerns as to whether or not the bridge has a railing (it does). Jeffries asked a lot about the vegetation planned for the different sections of the park, and expressed a wish for some landscaping that is a bit more "wild" in nature, to which Forest City seemed receptive.
There were letters of support from ANC 6D, which voted 7-0 on May 12 to approve the plans, as well as from the Deputy Mayor for Planning and Economic Development and the National Capital Planning Commission, which approved the park's design back in February. So, in the end, the commission decided to go ahead and vote for approval of the plans immediately, although the issuance of the final order is subject to the commission receiving some new renderings showing more clearly the railing on the bridge. The vote was 4-0-1, with commissioner Turnbull not present.
Comments (0)
More posts: ANC News, Retail, The Yards, Yards Park, zoning
 

There's two Near Southeast projects with hearings in front of the Zoning Commission this week:
* On Wednesday (5/28) the ZC will hear the request to extend the height of the office building planned for 250 M Street. I've written about this here, and you can read the Office of Planning's final report for much more detail on the request (and see the latest design). OP recommends approval of what is technically a modification to the Capper/Carrollsburg second-stage PUD (yes, this office building is part of the Capper redevelopment). After initially refusing to vote on the plan because of a lack of community benefits, ANC 6D voted 3-3 on it at its May meeting, which means there will be no support from the ANC. (I wasn't at this meeting, so I can't give you the specifics of what the developer offered to the ANC, or why the resolution didn't pass.) It's possible that 250 M will begin construction this year, but there's no confirmation of that.
* The next night (Thursday 5/29) the ZC will undertake a Southeast Federal Center Zoning Overlay District Review for the first-phase plans of the 5.5-acre waterfront park at The Yards. This design was approved by the National Capital Planning Commission back in February (with some suggestions for refining the pedestrian bridge that is one of the focal points of the design). The Office of Planning report for Thursday's hearing gives a lot of good detail on the plans for the park, as does my original entry from when the design was unveiled. OP supports the design for the park, while also hoping for refinements to the bridge and noting that there should be additional bike racks. You can all sorts of cool renderings of the plans on my Yards Park project page. The first phase of the park is expected to be finished by the end of 2009; subsequent phases, which will include piers and retail pavilions, will come later.
Comments (0)
More posts: 250 M/New DDOT HQ, The Yards, Yards Park, zoning
 

* The Post has an article on how today's Nationals game against the Brewers is the second of only two weekday afternoon games at Nationals Park this season. " 'We love afternoon weekday games but had to hold off this year due to the uncertainty about daytime parking availability,' Nationals President Stan Kasten said. 'We'd certainly like to have more next season, but no decisions have been made about '09.' " The article also talks to hookey-playing grownups who miss these games. Given that it's a holiday, and the gorgeous weather, and Sunday's second-highest-of-the-season attendance (35,567), this final weekday game might see a pretty big pile of people.
And, catching up on a recent few links that I've been slow to post:
* Columnist George Solomon Saturday's Post has a brief preview of the upcoming Congressional Bank Baseball Classic, which will showcase the the first-ever, city-wide high school baseball championship game, at Nationals Park on May 31. Games begin at 9:30 a.m., with private schools St. Albans and Maret meeting, followed by the DCIAA's Wilson High facing McKinley. Tickets are $5, and kids get in free--read more here.
* Dr. Gridlock hears that using the Capitol South station on the Orange and Blue lines and then walking down New Jersey Avenue to go to games is a great idea. Yes, it certainly is, even if it isn't exactly a news flash. (But use the JDLand Recommended Route instead!)
In non-ballpark news:
* Metro Weekly looks at the planned reopening of Ziegfield's and Secrets on Half Street SW in Buzzards Point, a few blocks away from their original homes at Half and O SE (now shallow left field).
* The Naval Historical Center at the Navy Yard takes a bit of a beating in a piece from Saturday's Post, comparing it with the shiny new Marine Corps museum at Quantico.
* For those of you counting the moments until the armed encampment at First and M departs, here's a May 14 story from the Mount Vernon Gazette on the progressing construction at Ft. Belvoir of the new home for the National Geospatial-Intelligence Agency. It's expected to be completed by August 2011, with NGA employees from Reston, Bethesda, and the windowless white box on the old Southeast Federal Center footprint starting to move in early in 2011. Eventually that First-and-M site will be redeveloped as office space as part of The Yards.
 

Responding to my inquiry about the windows that have recently been removed from the Pattern Shop Lofts building on the south side of Third and Tingey streets in The Yards, the folks at Forest City have let me know that interior demolition work is indeed underway on the World War I-era building. The existing interior walls, ceilings, plumbing, asbestos {cough} and whatnot is all being removed, in preparation for the actual construction/renovation work that is scheduled to begin later this year. Two floors will be added to the top of the building as part of its transformation into a 170-unit apartment building, which will also have 10,000 square feet of ground-floor retail. It's expected to be finished next year. (Its neighbor across Third Street, the Boilermaker Shop, is currently out for bid, and construction is expected to begin this summer to turn it into a 46,000-sq-ft retail space by fall 2009.)
Meanwhile, work has stopped at the 1345 South Capitol Street site (directly across from the ballpark), with the old buildings demolished and the site mostly cleared. Camden Development has been planning a 276-unit apartment building for this location, but I've been told that the company is "trying to decide what to do" with the project.
 
504 Posts:
Go to Page: 1 | ... 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 ... 51
Search JDLand Blog Posts by Date or Category