Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capper
See JDLand's Capper Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


376 Blog Posts Since 2003
Go to Page: 1 | ... 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 ... 38
Search JDLand Blog Posts by Date or Category

I don't dare tally up how many photos I've taken over the past 12 months, but suffice to say it's a lot. That didn't stop me from a quick lunchtime trek around the neighborhood to grab my final pictures of 2008, with a starkly blue sky as an end-of-year gift. Here's a boatload of before-and-afters for your perusal:
I started at Capitol Quarter, where the first three townhouses at Fourth and L are already framed, wrapped, and window'ed (I imagine the developers are trying to get those units finished as close to "on schedule" as possible). Here's the before-and-afters for the intersection's southwest corner; be advised that taking southward-facing photos in winter is no fun at all, so apologies for all glare, skipped angles, etc.

I next ventured to The Yards (USDOT security guards be damned!) for updated photos of the Foundry Lofts construction, where most of the framing of the two new top floors appears to be finished. And both Third and Tingey streets are now nicely paved and curbed, which you can see along with the Foundtry Lofts construction in these Third and Tingey photos, and also in shots from one block west, at what someday will be Second and Tingey. And, for the heck of it, here's a few new New Jersey and Tingey images. (Remember to look for the icon, as always.)
And, acting on tips from alert readers, I checked out the Third and K Market, which is now being gutted. There was no one around to answer any questions as to what is up, but seeing work getting done a few months after a For Rent sign went up (and quickly disappeared) would seem to be a good sign....?

I also went to First and M, where workers at 100 M have now given back one lane of M Street and told me that the median east of First will be rebuilt soon (as the one west of M recently was). The silver bullding against the unbelievably blue sky makes for a nice tableau in these updated photos.
There are also a few updated shots of 909 New Jersey, taken mainly from the First and I intersection, which is also notable for the nice little fence and landscaping that's now gone in across the empty lot to the east of 100 I, visible in many of these new photos.

Will that tide everyone over until the new year? I know I'm now good for a while....!
 

Just got back from ANC 6D's meeting, and I'll leave you waiting until Tuesday for the first details on Akridge's Half Street plans (I don't want to give it short shrift) but here's the other Near Southeast items of the evening:
* Commissioner David Sobelsohn said an announcement is likely coming next week that the city's 2009 Artomatic festival will be held in ANC 6D, "most likely ANC 6D07" (which is Near Southeast). I know nothing more than that.
* Sobelsohn also introduced a resolution to send a letter to Tommy Wells, DDOT, and other officials expressing the ANC's support for the continuation of free parking at RFK and the Nats Express shuttle buses "to reduce the incidence of illegal on-street parking in ANC 6D by people attending events at Nationals Park." The resolution passed 6-0. A few weeks ago it was reported that Wells wants to discontinue the service.
* The DC Housing Authority came requesting the ANC's support for a series of zoning items having to do with the Capper PUD, including extending some deadlines and also expanding the number of residential units offered. (You can read all about them here; I'm too worn out to go into them all again tonight.) There wasn't much discussion of the request itself, because the commissioners were, shall we say, displeased that a huge packet of supporting materials arrived on their doorsteps just last Friday (6D07's Bob Siegel didn't receive his at all, and were unmoved when told it was basically the same information they had received in July.
There was also displeasure expressed about the request to delay the start date for the Community Center at 5th and K to 2012, with the commissioners wondering what level the DCHA would consider a "critical mass" of residents that would make the center viable. (Only 300 of the planned 1500 units have been built so far, so it would seem that the threshold might perhaps be a bit higher.) But the Housing Authority made clear that obtaining financing for the project is the larger hurdle. The support request will be brought up again at the ANC's January 12 meeting.
* I admit that I didn't stick around for the late-in-the-agenda item on the Capper trash enclosures. But DCHA mentioned that they had met with the city's Public Space Committee in advance of their monthly meeting, and were making progress on modifications to the design. ANC chair Moffatt asked if the enclosures still exist at all in the new design, and when he got the "yes" answer, that ended the discussion.
 

* As Tweeted on Saturday night (after cheering my Gators onto victory), framing has indeed begun on Capitol Quarter v2.0. They're not exactly the most thrilling photos (it was some tough almost-winter lighting conditions), but if you need proof, here they are, with their befores.
* Yet another mid-month event announcement to pass along--on December 16th, 17th, and 18th, the BID is putting on a Holiday Market at 1100 New Jersey Avenue. It will run from 11:30 am to 6 pm, and will feature "local artisans selling handcrafted jewelry, pottery, crafts, watercolors, photography, and more."
* Looks like maybe the 3rd and K Market might be stirring. I haven't heard anything official (though we saw that "For Rent" sign in the door a few months back), but there's been a slew of permits and the concrete surrounding the building has been torn up to apparently do some re-pointing of the bricks near ground-level.
* Less pleasant news from the same block--looks like there was a fire just within the past few days in the second floor of one of the rowhouses on Third Street--the top-row windows are gone, and there's black soot across the upper part of the front of the house. Anyone know what happened?
* I finally gave the new camera its first Hood workout on Sunday morning, despite the 40-mph winds and "variably sunny" weather that provided some icky overcast shots followed seconds later by brilliant blue-sky vistas, though it must be said that this model does a much better job of handling backlit buildings than my previous one. (And it was too dang cold to think about sticking around waiting for clouds to clear.) I'll post them in separate entries over the next few days. Got to s-t-r-e-t-c-h out the decent content nowadays.
Comments (0)
More posts: Capper, Capitol Quarter
 

The agenda for Monday's ANC 6D monthly meeting is out, and the most enticing item is Akridge looking for the commission's support in advance of its Jan. 29 Capitol Gateway zoning overlay review for its new 700,000-sq-ft mixed-use development at 25 M, on the site of the old WMATA Southeastern Bus Garage, in the block directly north of Nationals Park. At this point, little has been put forth publicly about the project other than it'll be a office/residential/retail mix, and is expected to get underway in early 2010.
Also on the agenda is a third go-round with the DC Housing Authority over the designs for some external trash enclosures for some of the units at Capitol Quarter. I wrote about the first discussion here, and the Hill Rag has the report on the second one. Will the third time be the charm, or will bad things come in threes? There will also be a status report about the Capper redevelopment in general.
There's also apparently a letter being brought by Commissioner Sobelsohn to express the ANC's support for retaining the Nats Express shuttle bus that brings stadium-goers to the neighborhood from the parking lots at RFK. I imagine that the ANC will be expressing some level of concern about increased traffic and parking problems if that shuttle service goes away (it was reported last month that Tommy Wells is in favor of ending it).
The ANC meeting is at 7 pm at St. Augustine's Church at Sixth and M streets, SW.
 

For those who haven't wandered by Fourth and L recently to check out what's happening at Capitol Quarter, I can report that new slabs have been poured, and vertical construction should get underway (again) next week. (If you haven't been following along, this is a second start for these townhouses, after the initial construction in August showed foundation problems and resulted in the demolition of the first units that were underway.)
Comments (0)
More posts: Capper, Capitol Quarter
 

The front page of Tuesday's Post has "Building Slowdown Turns Grand Visions into Vapor," a look at projects in the DC area that are on hold because of the slumping economy: "The economic boom of recent years promised to deliver gleaming homes and high-end retail to struggling and newly forming neighborhoods across the Washington region. But that quest is running headlong into a withering economic slowdown and paralyzed credit markets, bringing new construction to a virtual stop and fueling anxiety among those who dreamed that their neighborhoods were the next frontiers."
Among the examples in the article are three delayed projects near the ballpark--WC Smith's 250 M Street office building, the residential and hotel portion of Monument's Half Street project, and also the Corcoran's Randall School development at Half and I, SW (which Monument pulled out of recently): "Perhaps no area is more central to the District's long-term ambitions than the streets around Nationals Park. At every opportunity, Fenty talks of a cosmopolitan destination featuring new parks, offices, stylish apartments and restaurants, all of it along the Anacostia River. Yet, how soon that vision materializes is fraught with uncertainty."
(Full disclosure: I provided a bit of basic status on ballpark-area projects for the piece, hence the "contributed" line.)
Some additional perspective: Certainly there's a slowdown afoot. (It's almost like there's some sort of cycle of boom and bust in commercial real estate!) I've been joking that I should just put a "Gone Fishin'" sign up here at JDLand during 2009, and come back in 2010 to see what's cooking, because other than the first offerings at the Yards and perhaps Canal Park {cough}, I'm not expecting much to get underway in the next little while. On the other hand, Capitol Quarter is moving forward, 1015 Half Street is now out of the ground, Diamond Teague Park is expected to open in the spring, and 100 M and 55 M and 909 New Jersey and Velocity will all be opening their doors before long, and perhaps the lure of another season of baseball will get some retail into the empty ground-floor spaces of those buildings and 20 M.
So, it's not like tumbleweeds are blowing down M Street or vines are growing on buildings a la Logan's Run--and it would be hard to make the case that it's the neighborhood's fault or the stadium's fault when the entire region is feeling the pain. The expectation would be that when the market improves, development in Near Southeast should pick up again. But we'll all just have to wait and see, won't we?
 

* The agenda for Monday's ANC 6D meeting has been sent around (not yet posted online). They'll be revisiting the designs for exterior trash enclosures on certain Capitol Quarter townhouses that were discussed and given the thumbs down last month. Other items include the potential modification of the 70 bus route, the franchise agreement between the city and Verizon for FiOS, and street closures for the SunTrust National Marathon on March 21. The meeting is at 7 pm at St. Augustine's church, Sixth and M streets, SW.
* Meeting at the same time on Monday (well, starting at 6:30 pm) will be the DC Zoning Commission, with a vote on the proposal to move 225 Virginia Avenue into the Capitol South Receiving Zone (read about it here).
* The city's Public Space Permit feed is back. Yay! Hopefully the Building Permit feed won't be far behind.
* One thing we've all learned over the years is to not believe anything about the school buses leaving Canal Park until we actually see them all drive away. But I will note that the DC Housing Authority currently has a solicitation out for a contractor to build surface parking lots at DC Village (which is where the buses are relocating to). Bids are due Nov. 18. I'm hearing "mumbleJanuarymumbleFebruarymumble" as a potential timetable for the departure of the buses, but see sentence #1 of this paragraph.
Comments (0)
More posts: ANC News, Canal Park, Capper, meetings, zoning
 

On Monday night the Zoning Commission held a brief hearing on Case 06-32a, the request by the city to move the old Post Plant at 225 Virginia Avenue into the "Capitol South Receiving Zone," which would allow the block to receive transferable development rights, allowing greater height and density than the 6.5 FAR and 90-ft-height currently allowed.
When this was originally brought before the commission by developer Washington Telecom Associates for setdown two years ago, the Office of Planning indicated that they wouldn't support the request because of concerns about the added density on that block affecting both Canal Park to the south and Capper/Carrollsburg townhouses to the east (read the transcript for more details). Since that time, the city subleased the building (paying $500k a month in rent), but has decided not to use it to house police department functions and so is in the process of finding a developer to take over its sublease (which also has an option to buy).
In their pre-hearing report and during last night's session, OP said they are now prepared to support the move to the receiving zone, "provided that there is Zoning Commission review of the design of the portions of a building proposed to rise higher than 90' " which would confirm that the building "will be sufficiently setback from the eastern building face to avoid shadowing the lower buildings in Square 797 to the east" and that it "will provide a suitable northern focal point for the Canal Blocks Park." The OP report says that this lot would not be exempt from the city's inclusionary zoning requirements.
The three commissioners in attendance (Hood, May, and Turnbull) asked a few cursory questions, and noted that there was no report from ANC 6D nor any witnesses in support or opposition. The ZC will vote on this case at its Nov. 10 public meeting.
With the OPM page on the 225 Virginia Request for Expressions of Interest saying that notification was to have happened yesterday, I thought there was a possibility that this hearing would give us some hint as to who might be taking over the city's lease, but the Office of Planning said they didn't know who the developer might be.
 

On Monday night, the Zoning Commission briefly took up a group of items having to do with the Planned Unit Development (PUD) approved for Capper/Carrollsburg back in 2004. The first was the request that I've written about in the past to expand the allowed number of residential units in apartment buildings planned for two spots along L Street (between Second and Third behind the proposed 250 M Street office building and on the north side of the Old Capper Seniors site). See my previous entry for specifics.
There were also requests for three time extensions: to extend the first-stage PUD for an additional five years, to extend the deadline for filing second-stage approvals for the apartment building sites along Canal Park (including the trash-transfer station site) to 2013, and to extend the deadline for filing a building permit application for the planned community center at Fifth and K to January 2011, with an included extension of the start of construction to January 2012.
The commission voted 4-0-1 to have all of these items come up together on a future date to be determined (as one public hearing and one special public meeting for those of you well-versed in ZC phraseology).
 

Here's a brief wrap-up of Near Southeast-related items from last night's ANC 6D meeting (though the folks following my Twitter feed got some pithy tidbits in real time):
* JPI was there requesting support for a public space permit to put up a sign at 909 New Jersey. If you've been thinking that this apartment building looks pretty far along, you're correct: the JPI rep said that they're looking to deliver the first units in February. The building has 6,000 square feet of ground-floor retail space, of which 4,000 is expected to be leased to restaurants. The discussion about the sign permit devolved into concerns about the main staircase on New Jersey Avenue splitting up the public space, which DDOT's public space committee has already approved but which ANC members weren't sure they'd ever seen. The vote on the sign permit request was 4-0-2 in favor of asking DDOT to postpone the decision on the sign as a protest against the sign and NJ Ave public space permits not having been done together.
* EYA and the DC Housing Authority presented their request for ANC support for some new brick "screens" on certain public housing units at Capitol Quarter that won't have alley access and so will need to have their trash and recycling cans placed by the buildings' fronts. There are nine corner buildings in Capitol Quarter with 27 public housing units that will need these screens, though there are also corner buildings at CQ that are not public housing, and there are additional public housing units that are not in these corner buildings. But the ANC felt that these trash screens would make the affected units easily identified as public housing, which would negate what commissioners described as the "concept of Hope VI" where you're not supposed to be able to "tell the difference" in market-rate and public-housing units from the outside. There were also concerns about units with windows above the trash enclosures (i.e., the smell and also having to look out at the trash bins). The rep from DCHA asked the ANC to table the request for support rather than oppose it (so that EYA and DCHA could come back with some revised designs), but the ANC voted 5-0 to oppose the request anyway.
Both these public space permits are on Thursday's agenda of the city's Public Space Committee.
There was also to be a discussion of the stadium Traffic Operations and Parking Plan, but it got moved to late in the agenda, and it sounded like it was going to be just in terms of the impact on Southwest, so I will admit that I didn't stick around.
Comments (0)
More posts: 909 New Jersey, ANC News, Capper, Capitol Quarter, jpi
 
376 Posts:
Go to Page: 1 | ... 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 ... 38
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.