Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Metro/WMATA
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


218 Blog Posts Since 2003
Go to Page: 1 | ... 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 ... 22
Search JDLand Blog Posts by Date or Category

On Monday night the Zoning Commission considered two Near Southeast cases on its consent calendar. I wasn't there (having chosen to go to the ANC meeting scheduled for the same time), and the ZC's web feed experienced technical difficulties, so I'm posting some bare bones info that folks at the meeting have been nice enough to pass along.
Monument Realty asked for 22 "minor modifications" to its previously approved design for the under-construction eastern side of Half Street. According to the Office of Planning report, the changes mostly centered on adjustments to the exterior architecture and the layout of the residential component. The most noteworthy change request is probably switching from a multicolored LED screen at the Metro entrance at Half and M (which WMATA turned down, apparently) to a backlit laminated glass panel. Also, nestled deep in the OP report is a request to modify the design for the hotel windows because the "hotel operator has pulled out" -- early on, the word had been that W Aloft would be running the midblock hotel on Half Street, but apparently this is no longer the case; I've heard nothing on any new operator. You can read the report to see the other requested changes. Though this was on the Zoning Commission's consent calendar, and the commission acknowledged that the changes are small, they still wanted to see some renderings showing the befores-and-afters of the proposed changes, and have scheduled a special public meeting for Jan. 28 at 6 pm to consider the request.
Now that the eastern side of Second Street (running along Canal Park) is considered "re-opened" (it's a long story), the developers of 250 M Street are requesting to base the office building's height on the width of Second Street, which is wider than M Street. This would allow 250 M to go up to 130 feet, which apparently is the same as the height of 1100 New Jersey on the west side of the park, although apparently the building's planned square footage would actually decrease slightly which would increase the total square footage to 233,405. Though this was on the consent calendar, the commission asked the Office of Planning to submit a report on this, and there will be a public hearing.
UPDATED to fix an error about 250 M's proposed new square footage.
 

Just a quick couple of links:
* The Washington Times profiles Steve Cohen of Opus East, who's been promoted to vice president of real estate. Opus's two current projects in the District are both in Near Southeast: 100 M Street and 1015 Half Street (not "1015 F" as the article says). The article touches a bit on how Opus plans to handle any slowdown in the commercial real estate market.
* A few days back the WashBiz Blog on washingtonpost.com featured a quick overview of Monument's Half Street project and an interview with the company's executive vice president, F. Russell Hines. No news in the piece to any regular readers of JDLand--it mentions Monument's lawsuit against WMATA over the Southeastern Bus Garage, but gives no status report on where it stands.
* This is also a few days old, but I can't let an entry go by without mentioning parking, so here's a link to a WUSA piece from last week that, in a stunner, finds baseball fans who are upset at the idea of Tommy Wells's Performance Parking Plan, given that it might prevent them from parking for free on neighborhood streets for three-plus hours 81 nights a year.
 

Having just about reached my limit when it comes to writing about stadium parking, I'm going to cut to the chase and pass along the biggest items from today's hearing by the Committee on Economic Development on parking and traffic issues at the new Nationals ballpark. (It's a torrent of words, so I've bolded the most important items.)
The session began with ANC representatives testifying about the community's concerns that no traffic and parking management plan has yet been unveiled, and with not many days to go (no one was sure whether it was 82 or 81 or 80 days--it's actually 79, but I didn't pipe up), neighbors are getting increasingly nervous that plans and signage won't be ready by Opening Day. While Tommy Wells's proposed Performance Parking plan could eventually become the mechanism for handling on-street parking near the ballpark, it won't be able to be in place by Opening Day, and so residents want to know how parking is going to be restricted to prevent stadium-goers from descending on nearby streets in search of free parking and bringing what has frequently been referred to as "controlled chaos."
Kwame Brown became frustrated when trying to find out who is actually in charge of coordinating all the government agencies who have a hand in the ballpark and communicating information to the public--"Who do I call? Who's driving the train?" he asked a number of times. After much back and forth with Greg O'Dell of the Sports and Entertainment Commission and Judi Greenberg from the Office of the Deputy Mayor for Planning and Economic Development, it was finally agreed that DDOT is now in charge of organizing and implementing the stadium's traffic and parking plans.
Determining this was a good step for this hearing that had been convened to discuss those plans, except for one small detail--council member Brown's Committee on Economic Development does not have oversight responsibilities for DDOT, so no one from the agency was in attendance.
Oops. (Apparently there had been plans to hold this hearing jointly with Jim Graham's Committee on Public Works and the Environment, which oversees DDOT, but that did not come to pass.)
It was said that DDOT will be unveiling the traffic operations and parking plan next week, though of course no one from DDOT was actually there to confirm or deny this.
Greg McCarthy of the Nationals testified about the team's continuing efforts to plan for the onslaught of fans, ranging from the mailing next week of parking information to season ticket holders to a planned media onslaught beginning in February to educate stadium-goers about the best ways to get to the park. (Short version: Take Metro! Walk! Bike! Park in Metro parking lots! Don't drive to the ballpark unless you've already got a parking pass!)
There still is no signed agreement between the Nationals and the city for use of RFK as free satellite parking for non-season-ticket holders, though clearly both sides anticipate it will get done, especially since the Nationals are working out the best routes for the free shuttle buses they plan to provide from RFK to the new stadium. (But Kwame Brown did not seem too enthused that the city might not be getting any revenue from the parking spaces.)
The team anticipates having 5,000 spaces for season ticket holders available in lots within walking distance to the ballpark--and, other than one lot that sits on the west side of South Capitol Street underneath the freeway, all lots will be in Southeast and none will be in Southwest.
Tommy Wells focused a number of times on the idea of the neighborhood embracing the ballpark as part of its culture and part of the character of the community. How neat it will be for residents to be able to walk to games, he said, expressing his hopes that the ballpark is a positive experience for both fans and residents. (Putting the stadium there "was not a hostile act by the government," he said). He also spoke of how the stadium's on-time and on-budget completion should be a real celebration for the city, but that he doesn't want it to become known as the "ballpark with a traffic catastrophe."
My favorite moment of the hearing was when discussion turned to how exactly the onslaught of papal groupies will be handled when the Pope comes to the ballpark on April 17: I realized that all this time I had assumed Pope = Mass = Sunday, when in fact the event will be on a Thursday morning, which will make traffic and parking that much more of a challenge. Start planning your vacation day now.
Other items of interest:
* Charter buses are expected to be parked across the South Capitol Street bridge during games.
* The Nationals have secured 4,000 of the 5,000 spaces they are eyeing near the ballpark, and expect to have the other 1,000 by Opening Day. There will be about 3,000 spaces at RFK, in Lots 7 and 8, and the team will be running a test of the RFK shuttle buses on Friday.
* There will be 130 handicapped parking spaces in the two lots on the ballpark site.
* The Navy Yard Metro station is expected to be ready by Opening Day.
* The Nationals will be responsible for clean-up around the ballpark and surrounding streets after games, most likely through an augmentation of the Capitol Riverfront BID's "clean teams".
* There are still plans for two job fairs to be held in Southwest, perhaps on Feb. 9 and 23 at Greenleaf Rec Center.
There's probably other items I missed that some people might be interested in, but I think that's more than enough for a Friday night.
It's anticipated that a joint hearing of both the Committee on Economic Development and the Committee on Public Works and the Environment--which oversees DDOT--will be scheduled soon.
The broadcast of the meeting is already available on demand, if you have three hours of your life you're not doing anything with. I've also posted the prepared statements of the witnesses from today, which you should definitely read to get more information than I've been able to summarize here. Also available is a press release from Kwame Brown's office about the hearing, in which he calls for "enhanced coordination from DC agencies and increased public involvement."
UPDATE: Here's the WashTimes article on the hearing. And the Examiner's.
Comments (0)
More posts: ANC News, Metro/WMATA, parking, Nationals Park, Traffic Issues
 

Time to dip back into the What's the Deal With...? mailbag, where once again I'm being asked fabulous questions that I don't actually have any answers for. But that hasn't stopped me yet....
* Readers B. and K. are the most recent readers to ask about the Public Space Storage building on South Capitol between M and N, just a few feet north of the ballpark, wondering whether it has any plans to close. I know that Monument Realty was interested in acquiring the building, since it owns the lots just to the building's south as well as all other parts of the block not owned by WMATA, but that was before Metro awarded the Southeastern Bus Garage and its parking lot (on the north side to the storage building) to Akridge. It's certainly a valuable piece of land, and I don't think it's going out on a limb to say that I doubt it will be there many years from now, but as of this point I've heard of no deals.
* Reader R. has asked about Canal Park, which continues to appear stalled, with no public pronouncements on it in months. (And with that "Spring 2008" still displayed for all to see on the sign at Second and M.) Is it still the school buses throwing up the roadblock, which is what we last were told? Is there some new wrinkle? I haven't heard anything, I'm sad to report.
* Reader F. asks about Ann's Beauty and Wig Shop, the dazzlingly pink building sandwiched between St. Matthew's and Onyx at 125 L Street, wondering if it's going to be sold. Ann's came to this block in 2005, after I believe being forced out of Waterside Mall in SW, and the owner has apparently been pretty vehement with potential suitors that she has no intention of selling. Perhaps the pending sale of St. Matthew's to Ruben Companies could change that, but as of now, I've heard nothing.
That's the best I can do for now--absolutely no useful information at all! No doubt there's scuttlebutt on each of these that I'm not privvy to, but I continue to be unsuccessful in my quest to get all city officials and private-sector parties operating in Near Southeast to inform me at all times about all their dealings. It's almost like they think I'm just some sort of powerless pesky neighborhood blogger or something....
Got a WTDW question? (maybe even one that I might know the answer to?) Pass it along. But I'll close with a hint--when it comes to oft-discussed projects around Near Southeast, as soon as I hear information that I can confirm, I post it. (I do tend to stay away from posting rumors, and considering some of the ones I've heard over the years that have turned out to be fabulously incredibly wrong, I don't regret this.) If you haven't seen any updates lately about Canal Park, or Capitol Quarter, or the Post Plant, or any other project, it's because nothing new has come my way. I'm as desperate to post the latest news flashes as you are to read them....
 

Back in September 2006, WMATA solicited proposals to develop four of its properties, including the east entrance of the Navy Yard Metro station at New Jersey and M and the 14,100-square-foot parcel on the southwest corner of Half and L streets, SE, where the Navy Yard Metro station's "chiller" is located. While the sale of the New Jersey Avenue land to Donohoe was approved by the WMATA board in December, there hasn't been even a smidgen of news about the chiller site in more than a year.
But now, nestled deep in the posted paperwork for Thursday's WMATA board meetings is an expected agenda for the Feb. 14 meeting of the Planning, Development and Real Estate Committee that lists "Navy Yard Station Chiller Site Developer Selection" as one of the action items. Citing the ongoing negotiations, Metro wouldn't give me any additional information, so we may have to wait for Valentine's Day for the "reveal," unless someone blabs beforehand. Once the mystery developer's section is approved by the WMATA board, the final negotiations for an agreement would begin. The property is currently assessed at just under $4 million.
The solicitation described WMATA as "looking for innovative plans . . . that will yield quality developments for the local communities, increase transit ridership, enhance the local tax base and provide a stream of revenue to WMATA for capital needs." Proposals were also supposed to follow the principles of "transit-oriented development" -- "providing safe, walkable, mixed-use communities that emphasize transit connections and reduce auto dependency." While doing all that, the site's developer would still have to replace the chiller operations either on site or somewhere close to the Navy Yard station.
There's also a 7,700-square-foot privately owned parcel next to the chiller on L Street, assessed at $1.72 million and currently home to the Empire and DC Flyer Cab Company. It has had "Build to Suit" signs flying for quite some time, so it's possible that the developer of the chiller site could acquire that land as well. And this spot is already surrounded by current and planned office projects, with the completed 20 M Street and the planned 1100 South Capitol on adjoining lots, and the starting-any-minute-now 1015 Half Street across L Street. See my Square 698 page for photos.
Comments (0)
More posts: Chiller Site/WMATA, Metro/WMATA, square 698
 

The Washington Business Journal has a huge "Looking Forward" piece in today's print edition, and its first prediction is this: "The place to be in D.C. in 2008 will be the Southeast waterfront." It then gives a quick run-down of what's going on (some baseball stadium project leads the list), and references the expected lack of amenities near the ballpark until Monument Half Street opens in 2009. Also: "Real estate insiders will be watching to see when the first major private office tenant lands in Southeast. Both CNN and National Public Radio have short-listed sites, but no company has committed to pioneering the private office sector yet." And: "Major work is expected to get under way in 2008 at The Yards, which Forest City Washington is developing in the area formerly known as the Southeast Federal Center. The first offerings at the 42-acre project will be residential and retail, with projects slated to open in 2009." But JDLand readers knew all this already....
Comments (0)
More posts: Metro/WMATA, Monument Valley/Half St., staddis, Nationals Park
 

In case you've already grown tired of the ballpark photos I posted on Monday showing the eastern and southern sides of Nationals Park, I've now updated the South Capitol Street images, too. (The northern views will have to wait until the reconstruction of N Street eases.) The main Ballpark Exterior Photo Gallery is now in pretty good shape after a short span of neglect (but as I said the other day, I think I needed the break).
I also took some new photos to capture the progress at 55 M Street, plus the completion of demolition at 1345 South Capitol.
If you don't feel like clicking around on all those links, here's all the photos I've posted in the past week. Try not to be blinded by those blue skies!
A few other items of note: The BP Amoco station on the northeast corner of South Capitol and N has fences up around it--I can't believe no one let me know! It's owned by Monument Realty, and I haven't heard about any near-term plans for the site. This leaves only one gas station in Near Southeast--the Exxon way over at 11th and M. There used to be three gas stations on South Capitol, now there aren't any. (And I've lost yet another source for my Gas Prices page. Waah!)
Also, new fences have gone up around the 1015 Half Street site, taking up one lane on K Street and on Half Street. Some exterior work was done to the DC Foreign Car building, but the little building is still there. For now.
I hope to get updated photos of 70/100 I and the pile of rubble that used to be old Capper Seniors within the next week. There's just too much activity to document these days--I've got to break it up into manageable pieces....
 

I was trying to take a few days off, but an idea popped into my head during an attempted nap that I just couldn't ignore. So say hello to a new page: my Nationals Park Frequently Asked Questions and Rumor Destruction Page (call it the Ballpark FAQ for short). I tried to pull together the questions that I hear and see the most often, from basics about the park's location to all the questions about Metro, parking, and entertainment options around the site. I'm going to keep it updated as events warrant--I know there's going to be a flood of information from the team and the city about how to get to the ballpark as Opening Day gets closer, which will allow many of the FAQ's "specifics haven't been announced" answers to be fleshed out with actual details. It also doesn't address much of the in-the-weeds detail of baseball at the ballpark--I'll leave that to Nationals fan sites.
This FAQ is now the default ballpark page, and replaces the old Stadium Renderings gallery, which has now been moved to a new page (after all, renderings are less important when the dang thing is just about three months away from opening!). So if your bookmarks have changed, apologies. The exterior and interior stadium photo galleries are still in their proper places.
(As for why on earth I didn't do a page like this a loooooong time ago, I plead insanity. Yeesh.)
Comments (0)
More posts: Metro/WMATA, parking, staddis, Nationals Park
 

This week's Ballpark and Beyond column in the Post is my summary of ANC 6D's deliberations on the ballpark liquor license. It also references a meeting held last night between community leaders and city and team representatives (though my deadline was before the meeting, so the column couldn't actually include anything *from* the meeting).
The meeting included updates on the road improvements in the area and the Navy Yard Metro station upgrades, both of which are still on track to be basically done by opening day (the Metro station might "still need another coat of paint", it was said, but will be "serviceable").
The Nationals are still working out their parking plans, not only in terms of the lots near the ballpark but also the satellite parking at RFK, and all the additional planning that goes with it (traffic flow, signage, shuttle buses, drop off/pick up locations, etc.). It appears as of now that there might not be season-ticket-holder lots in Southwest at all, not even at Buzzards Point. There was also mention that stadium-goers will not be funneled through the South Capitol Street exit of the freeway--the team is going to try very hard to move fans through all the other close-by freeway exits, but not South Capitol Street.
Circulator buses will not be part of the transit plans for the first season. But they're planning plenty of bike racks around the ballpark perimeter, and are also still working on a bicycle "valet" parking service.
Also, there's tentative plans for two stadium job fairs, possibly on Feb. 2 and Feb. 26 (details still being worked out).
And, everybody knows that the first few games will be "a challenge."
The general tone of the meeting was more cooperative and collegial than some of these meetings have been in the past (maybe because Tommy Wells was there for the first part and everyone wanted to be on their best behavior). There's plans for more meetings and workshops between these "stakeholders" (I really hate that word) to try to hammer out the best plans for traffic, pedestrian flow, and "curbside management" (aka on-street parking) before it's all then unveiled to the community at public meetings. There was also agreement that the group should get together after the first homestand in April to talk about what works/what doesn't.
UPDATE: Speaking of public meetings, here is the official announcement about the Jan. 11 city council Committee on Economic Development oversight hearing on "Parking and Traffic Plan for the Nationals' Stadium." It contains information on how to testify at the hearing, if you're so inclined.
 

Before the snow-that-never-was arrived yesterday, I took a quick spin to get some updated photos. There was still a smidgen of sun when I visited the old Capper Seniors site, where only the southwest wing of the huge building remained standing when I was there (but even that could be gone by now). I also wandered along Tingey Street behind the DOT HQ for the first time in a long time to see what's going on with the work at The Yards--they're now preparing to build some temporary parking lots and are doing their infrastructure work before starting the rehabs next year of three existing buildings into residential and retail offerings. I also took some shots along M Street and at Onyx on First and 100 M to take advantage of the overcast skies in those spots, since the building shadows on winter days when the sun's out are almost impossible to work with. Finally, I got updated photos of 55 M Street, the northern portion of Monument's Half Street project, where the section along M Street is now three stories high and a fourth story is underway on the southern edge of the building.
Here's the entire batch of new photos on one page--don't forget to click the if you want to see all photos in the archive from a certain angle. And in case you missed these a few days back, I recently took new overhead photos of the North of M area (looking south and west and northwest), showing quite a change in the last 21 months.
 
218 Posts:
Go to Page: 1 | ... 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 ... 22
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.