Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Metro/WMATA
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


218 Blog Posts Since 2003
Go to Page: 1 | ... 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 ... 22
Search JDLand Blog Posts by Date or Category

Metro has posted some information about how it plans to handle Opening Day at Nationals Park on March 30, and the Mass by Pope Benedict XVI on April 17. (This document comes from the agenda for its March 13 Customer Service, Operations, and Safety Committee meeting.) Some highlights, above and beyond the we've-put-up-a-web-site-and-printed-brochures bullet points:
* Metro is expecting 24,000 fans to come via Metro for Opening Day (21,000 of them via the Navy Yard station), and 26,000 Mass attendees. They also expect 60 percent of baseball fans to arrive via Metro during the season.
* The Opening Day plan includes the newly enhanced N22 bus service, 18 extra pre-and post-game trains (mainly on the Green line), extra eight-car trains (perhaps up to every third train), and converting the Navy Yard Station to "one-way" traffic. (I presume this means for pedestrians, though I'm not sure if this means that *no one* can enter/exit the station against the flow before and after the game.) The fact that this first game is on a Sunday night is allowing Metro and the city to avoid a possible complete meltdown of the transportation network that might happen if it occurred during an evening rush-hour.
* Because Mass attendees must be through security and into the park by 9 a.m., Metro expects the largest crushes of travel to be between 5 and 8 am (the height of the morning rush hour) and again post-Mass. All available extra trains will be used when the Metrorail system opens at 5 am, and there will be 18 extra trains after the Mass ends. And, again, the document says that the Navy Yard Station will be converted to "one-way," which ought to be interesting for the commuters trying to use the station to get to and from work during this Thursday event. And the dreaded phrase "Rolling Street Closures" is mentioned for Pope Day, in that it might affect bus routes coming into the neighborhood. If there were ever a day for Near Southeast residents and workers to telecommute....
With the uncertainties about how fans and the transportation network will handle the crush of getting to the new ballpark for the first time, and with the president expected to throw out the first pitch, the Nationals are opening the gates at 3:30 pm on the 30th, 4 1/2 hours before the 8:05 pm start time. I've been told that they've acquired more than 50 magnetometers to try to lessen the burden of passing 41,000-plus fans through security, but if you're going to the game, you might not want to show up at 7:55.
UPDATE: For more, see this Tuesday entry on additional news on Metro's plans.
Comments (0)
More posts: Metro/WMATA, parking, Nationals Park, Stadium Events
 

Just a bunch of tiny items worth highlighting on a dreary Saturday (no new photos today in this muck):
* A building permit has been approved to build a surface parking lot along First Street between M and N, where Normandie Liquors and its brethren were demolished last month. And the Archdiocese of Washington has applied for a public space permit for the 1300 block of First Street, SE--does the Popemobile need special parking permits?
* As plans at The Yards continue to move forward, there's now official names for the first-phase projects. Say hello to The Boilermaker Shop, The Pattern Shop Lofts, and Factory 202. (And 401 M and 400 Tingey, but those aren't anywhere near as catchy.)
* The 55 M web cam is no longer available to the public. Perhaps they want the Opening Day vista to be a big surprise. Or they don't want people watching the last-minute work on the Navy Yard Metro station. (I wonder if the gas main hit on Thursday was caught by this camera.)
* Some commenters are discussing the idea that's been floated of someday demolishing the Southeast-Southwest Freeway. Getting rid of this Berlin Wall that separates Capitol Hill and Near Southeast (and splits Southwest) was brought up in the National Capital Planning Commission's 1997 Extending the Legacy framework plan, if you want to see it actually on paper. (Apparently an updated NCPC framework plan is scheduled to come out this spring, which looks like it continues to have Virginia Avenue marked where the freeway currently is.) As to whether I'll see this done in my lifetime, well, it would be a nice surprise.
If you really want to go high-concept, you can read DDOT's 2003 South Capitol Street Gateway and Improvement Study to see their ideas for a tunnel that would link I-295 and the SE/SW Freeway for through traffic, leaving South Capitol Street to become the grand urban gateway boulevard planners envision. At Wednesday's public meeting on the South Capitol Street Draft Environmental Impact Statement, DDOT said that the tunnel isn't totally off the table, but they decided that a new Douglass Bridge and other South Capitol Street improvements could move forward separately. But could a tunnel still work if the dream of dismantling the SE/SW Freeway were realized?
* I've tried to remain (mostly) unopinionated on various projects during the five years I've run this site. But sometimes, it's necessary to take a stand, to come out from behind the cloak of neutrality and crusade for what you believe in. So I'm going to take advantage of this bully pulpit and fight for one thing: Arched Bascule!
 

* Tommy Wells's web site has the details on the new times and routes for the N22 bus that runs between Union Station and New Jersey and M. The expanded hours and route changes start on March 30. I've added them to my Take Metro! page.
* After the recent columns that have caused some gnashing of teeth with their representations of the area around the ballpark, readers might enjoy Marc Fisher's "Scenes from a Changing City" posts this morning: "But it was the walk from the Metro station to the stadium that taught me something about how cities change. The Metro entrance closest to the stadium isn't open yet--it will be done by Opening Day, we're assured--so I walked the extra couple of blocks from New Jersey Avenue. Any walk around the ballpark area these days is a bit treacherous, as the area is cluttered with construction materials and work crews. But it's possible to see that what two years ago was an industrial and nightclub zone in which only the brave dared walk alone is on its way to becoming another piece of the grid. What was a collection of rutted roads, empty lots, warehouses and fringy businesses is becoming an extension of downtown in which walking around is as routine as on Seventh Street in the East End, K Street downtown or M Street NW in Georgetown." (And thanks for the shout out, Marc.)
Comments (0)
More posts: Metro/WMATA, Nationals Park
 

* The WashTimes has a getting-ready-for-the-baseball-crowds piece, surveying what Metro and DDOT are planning, and also talking about the Transportation and Residential Curbside Management Plan (formerly the TOPP) that I've been writing about extensively. (Read it already, would you?) Metro is planning 14 extra trains for Opening Night, and will be presenting its plan for handling ballpark traffic to its board on March 13. Central to this piece--and to many conversations I've had with city and team officials--is that residents and fans need to know that The Powers That Be will be watching Opening Day very closely (DDOT plans to be watching from the air) to see what works and what doesn't, and will be tweaking the initial plans as necessary. In fact, there's probably going to be an entire season's worth of responding to initial problems, not only in terms of getting to the ballpark but at the stadium as well. Patience is counseled, though of course that's never been a strong suit in this city. And it's worth a reminder that there's a public meeting on the transportation plan on March 12 from 6 to 8:30 pm at 20 M St., SE.
* Commenters yesterday were quick with the news about the gas leak that closed the Navy Yard and Waterfront Metro stations yesterday afternoon, thanks to construction workers at Half and M hitting a gas main. Considering all the work that is being done in the area (not just on new buildings but with a lot of digging in the streets lately), it's kind of surprising that something like this hasn't happened sooner.
Comments (0)
More posts: Metro/WMATA, parking, staddis, Nationals Park, Traffic Issues
 

One quick outbound link this morning, to The Post's piece on the scoreboard at Nationals Park, in advance of today's official unveiling.
Plus, here's a few links for recent items that you might have missed in the flurry of posts around here these days:
* I posted new photos of the ballpark exterior, including the Center Field Gate at Half and N. (I'll probably have new interior photos later today, though the weather doesn't look to be that much better than the last time I was inside, on that icky dreary day.)
* Read the damn Ballpark Traffic Management Plan already. And my pages on on-street parking and taking Metro. And the new pages by Metro and the Nationals about getting to the games. (And listen for the radio ads that debuted yesterday urging fans to take Metro.)
* Monument Realty has won a preliminary injunction preventing WMATA from selling the Southeastern Bus Garage to Akridge.
* Watch for announcements of a community meeting about Opening Day on March 12, at the ballpark.
And, a reminder: the parking garages that look so stark in photos from inside the ballpark will have big banners draped on them by Opening Day. So what you see now is not what you're going to see in four weeks.
Comments (0)
More posts: West Half St., Metro/WMATA, parking, Nationals Park, Traffic Issues
 

* The tarp is coming off the field today--look at that pretty turf! It's probably being done today because Tuesday the Nats are holding a ceremony to install home plate and officially unveil the HD scoreboard (not open to the public).
* The Examiner reports that Metro is tamping down expectations a bit for performance along the Green line for weeknight ballgames: "The transit agency expects the number of riders on the Green Line, which serves the Navy Yard station near the ballpark, to more than triple on game days. But Metro can't add more cars to that section of the system during the week because all of its 820 railcars are committed to rush hour service, officials said." So, perhaps that notion of walking from Capitol South is looking more attractive--I've added to my Take Metro! page a map of the JDLand Suggested Route between Capitol South and the stadium, along with a few photos showing the current state of New Jersey Avenue (which certainly isn't as scary as it used to be).
And, Tuesday is just chock full of Near Southeast-related activities. In addition to the ceremony mentioned above, there's also these items to remember:
* Single-game ticket sales open at 9 am (yes, including Opening Day).
* The City Council will be meeting at 10 am for its monthly legislative meeting, and the agenda includes emergency legislation to enact the "Performance Parking Pilot Zone Emergency Act of 2008", B17-0644, the "Ballpark Safety Emergency Amendment Act of 2008", and B17-0608, the "Vending Regulation Emergency Act of 2008". It's in Room 500 of the Wilson Building, beginning at 10 am, and will be broadcast on DC cable 13 and live webcast.
* The first of two public meetings on the South Capitol Street Draft Environmental Impact Statement is at 6:30 pm at Birney Elementary School, 2501 Martin Luther King Jr., Ave., SE, from 6:30-8:30 pm. The second one is Wednesday night (March 5) at Amidon Elementary School, 401 I St., SW, also from 6:30-8:30 pm.
Comments (0)
 

I've been passed the news that a judge has granted Monument Realty's request for a preliminary injunction prohibiting WMATA from taking "any further action to dispose of" the Southeastern Bus Garage. The two sides are to file recommendations on further proceedings by Wednesday at noon, and the injunction stays in effect until the court orders otherwise. Monument filed suit in October, asking that the planned sale be invalidated.
(Adding that this shouldn't, as best I can tell, delay the removal of the buses from the garage by Opening Day, since just yesterday the WMATA board approved a plan to fund the relocation of the buses with monies from other accounts and from the District, and not from any proceeds of the expected sale of the garage site.)
UPDATE: I now have a PDF of the ruling, which gives a lot of background on how the bidding process for the garage site was handled by WMATA. My background in law is slim to none, so I'm wanting to be very cautious about how I characterize all this (I'm sure there will be plenty of media coverage coming soon), but the ruling does state that Monument has "demonstrated a likelihood of success on the merits of their claim that they were substantially prejudiced when WMATA considered Akridge's nonresponsive bid and participated in improper ex parte discussions with Akridge."
UPDATE II: Here's a short Post piece on the ruling.
Comments (0)
More posts: West Half St., Metro/WMATA, Monument Valley/Half St.
 

* Today's the day that the Archdiocese of Washington is announcing the distribution of tickets for the April 17 Mass by Pope Benedict at Nationals Park to churches in the District and suburban Maryland. The Post reports on the pleas that church officials are receiving from parishioners desperate to get one of the hottest tickets in town. A spokeswoman says they've received nearly twice as many requests as there are tickets. There are even raffles where the winner gets a ticket to the Mass.
* Metro has decided to create a one-day "Pope Pass" for $9 for the estimated 25,000 Pope-goers who will be arriving at the ballpark on the subway. (Normally one-day subway passes can only be purchased after 9:30 am, but because of security concerns, those going to the Mass are going to be arriving much earlier than the 10 am start time.)
* Metro's board gave final approval to expanding the hours of the N22 bus route that runs between Union Station, Eastern Market, and the east entrance of the Navy Yard station at New Jersey and M. It will now run on evenings and weekends to help shuttle stadium-goers between those locations. And the board also gave final approval of some money-shuffling that will allow the closure of the Southeastern Bus Garage at Half and M. More on both of these items can be found in these two entries.
* And, in one final Metro item, the Post reports that council member Jim Graham says "he has been contacted by Washington Nationals representatives who wanted to know if the name of the Navy Yard Station could be changed to reflect the name of the corporation that buys the larger naming rights of the stadium." Answer? No way. Uh-uh. Nope. Forget it.
Comments (0)
More posts: West Half St., Metro/WMATA, Nationals Park, Stadium Events
 

After reading this in Tom Boswell's column today--"On the other side of Half Street is a huge block-long hole, several stories deep, where construction by Monument Realty has stopped"--I contacted Monument to find out if this is indeed the case.
(For those just joining us, a little background: Monument owns the entire east side of Half Street between M and N, just to the north of the ballpark, and is currently building the 55 M Street office building on the north end of the site, on top of the west entrance of the Navy Yard Metro station, which was expanded as part of the office construction. The south end of the block is slated to be a 200-room hotel and a 340-unit residential building, and is current a half-block-long excavated hole.)
Monument executive vice president Russell Hines has told me that construction drawings for the the hotel and residential part of Half Street are being finalized, and construction will begin in late spring or early summer, with completion in late 2009 or early 2010. The entire block was excavated early in 2007 because it made economic sense to do it all at once, but that because of the need to complete the subway station improvements by Opening Day, the 55 M construction was "accelerated" and the hotel/residential part of the project is just now "catching up." In fact, Hines says, work on the office building is continuing, with the building "topping out" in the next week or so. (You can check the web cam for up-to-the-quarterhour progress.)
Hines also wanted to make clear that what Boswell called a "legal battle between two developers" over the Southeastern Bus Garage site is in fact litigation between Monument and WMATA, not Monument and Akridge.
 

Wednesday's Post has a column by Tom Boswell ("Nationals Park: Best of a Bad Lot") listing the myriad problems he sees with the ballpark and its surroundings, with Opening Day now just a month away. The Navy Yard subway station. The parking situation. The Florida Rock site ("an enormous and inexcusable 5.8-acre eyesore" that will be "sitting there all season, damaging the river views from all the ramps to the first base upper deck"). (He does mention that fences to obscure the view at ground level will be going up, which I posted about a few days ago.) The WASA site (which "would be the Most Unsightly Thing Near Any Big League Park if Florida Rock and Gravel hadn't already retired the trophy.") The Monument Half Street site, where he says "construction has stopped." The fact that city views are only available in the cheap seats.
But he ends with a stab at optimism: "Someday, the Anacostia riverfront will amaze us, just maybe not as soon as we hoped. When it comes to fulfilling huge civic dreams, what's a few years, more or less. In for a dime, in for a decade. "
On the other hand, the article confirms that the garages, which have long been a focal point of much complaining, will indeed be covered, as has long been shown in the renderings, with "league logos, replicas of the 'Washington All-Stars' from the right field scoreboard in RFK as well as colorful baseball-themed ads."
 
218 Posts:
Go to Page: 1 | ... 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 ... 22
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.