
While the neighborhood's big Beer Garden News last week was the
plan by the Bullpen folks to create one at Half and M, SE, the other
proposed beer garden in the area, at 8th and L, SE, is continuing to proceed through the city's bureaucracy. With its liquor license having been dealt with
last month, this "Bier Garden" is now undergoing the Historic Preservation Review process, a necessary step thanks to its location within the Capitol Hill Historic District (which I'm sure Das Bullpen is thankful to be well outside of).
Original plans for a temporary structure were undoable thanks to historic district restrictions, so now the applicant, Mark Brody, and his architect have opted to go with a one-story building with a roof deck, in addition to the proposed ground-level summer garden. The look of the building (which is closer to 1 1/2 stories high) is very industrial, with large multi-paned windows and lots of "wood rainscreening" on the exterior and the roof deck. (I've asked for electronic versions of the color renderings that were shown at Tuesday night's ANC 6B meeting, but Mr. Brody is still pondering whether to pass them along.) UPDATE: Since the renderings have been submitted to the Historic Preservation Office and have been shown at a public meeting, an interested party passed them along. (UPDATE 1A: And Mr. Brody's architect has now sent it to me as well--thank you!) Here is the main image, looking at the corner of 8th and L:

The ANC's Planning and Zoning Committee had a first look at the designs on Feb. 1, and, according to the
committee report, expressed a number of concerns about "the proposed materials, the open deck design, and the lack of letters of support from other establishments and or affected neighbors" as well as the "unfinished appearance" and issues with not having received details such as "views of the affected area with relationship to existing structures and plat specifications."
By the time the full commission met Tuesday night, Brody had made some changes to the initial designs, and forwarded letters of support from two neighbors on L Street as well 18 letters from Capitol Quarter residents (thanks probably to an e-mail that went to the private CQ mailing list asking for support). When asked, Brody said that Mark Batterson of the National Community Church (which is
buying up the north side of this "Saints and Sinners" block to build a new office and performance space) has decided that he "will take no position" on the beer garden plans.
There ensued much discussion, with the bulk of concerns coming from Kirsten Oldenburg (in whose SMD this is) and David Garrison, who both clearly are unhappy with the design, especially the roof deck. (Perhaps Kirsten will write more about this project
on her blog so I don't have to try to summarize, HINT HINT.) But other commissioners made clear their desire to get
something built on this portion of Barracks Row south of the freeway to help jump-start the area.
After an initial motion to oppose the designs while the applicant and the city's Historic Preservation Review Board continue to make refinements failed 3-7, a second motion to take no position failed 4-6, followed finally by a motion that passed 7-3 to support the designs, with an accompanying letter to the Historic Preservation Office detailing the commission's concerns about safety on the roof deck, the design of the doors (too stubby, Oldenburg says), the "parapet" that is above the front door, and the design's "historic character." Commissioners Oldenburg, Garrison, and Norman Metzger were the three commissioners in opposition. The HPRB may hear this case at its Feb. 24 meeting, though that agenda has not yet been set. (Note that the Capitol Hill Restoration Society will be a source of comments about the project as well.)
Interestingly, the liquor license apparently will not cover the roof deck, so Brody will have to come back to the ANC if he intends to serve alcohol in that space. There was also mention made of wanting to have sidewalk tables during warm weather, which will require a public space permit and another trip back to the ANC (athough the bus stop right out front might make for a space issue).
There's probably more to write about this, but I'm pacing myself, since I'm guessing there will be plenty of additional chances to cover the process. And hopefully I'll get some renderings to post soon, but when the project gets onto an HPRB agenda they'll become part of the public record, so I'll definitely have them then.
There were some additional South of the Freeway tibits that came out during these discussions, but I'll save those for another post.