Since January, 2003
            
 Page Through from Before to After

First, summer was hot, then it was really hot, then the Nationals were hot, then the Nationals were REALLY hot, and suddenly it's November and the JDLand camera has been crying out from neglect. But I took care of that this weekend (oh boy, did I), and wanted to catch up on the latest downward digging and upward construction.
Let's start by peeking through some fences to look at the digging portion, where excavation is now underway at New Jersey/Canal and N/Tingey on the first office building to come to the Yards, which will be the headquarters for Chemonics International. (Yes, it's the project that chased the Trapeze School down to 5th Street.) The other two digging locations are Lerner's residential building at 1000 South Capitol and the CSX East site on New Jersey Avenue just south of the freeway, where a hotel and 800 units of residential will be coming. In order:
Next, we have three buildings that are above ground but not yet topped out. We'll start with the reconstruction of the Capper Seniors building at 5th and Virginia, which started just a smidge more than one year after the fire. With the pad not needing to be redone and the concrete-encased stairwells still standing, it isn't taking long for the wood-based construction to look familiar. (It is an odd thing to be watching the same building go up twice, 14 years apart--the first photo below was taken on Nov. 28, 2005, then after the fire in Sept. 2018 and March 2019, and now ).
The other skeletons are the new headquarters of the District Department of Transportation at 3rd and M Streets, which at this time of year can only been seen in sunlight for about one hour, from the west.. A few blocks away, on L Street between South Capitol and Half, the neighborhood's first "sliver" residential building (condos!) at 37 L is now a few floors away from its roof.
Beyond that we have a mere, oh, 12 additional projects that are topped out but not finished. Three of them are getting their faces put on (DC Crossing, Meridian on First, and One Hill South Two):
The rest have long since stopped looking particularly different while they plod toward completion, but there are updated photos on their project pages if you wish to see some. And yes, I'm looking at you, Thompson hotel and Estate apartments, Parc Riverside Phase 2, NAB HQ, Avidian, The Kelvin, Envy, the Garrett, and the Maren.
Now I'll turn my attention finally getting caught up on sliders. Wheeeee!
Comments (9)
   
 
 More About Development News

JDLand.com Home

Comments

202_cyclist says: (11/8/19 10:03 AM)
Thank you for the update. Construction has also started at 716 L Street, the residential development next to the Brig.


GaryRKarr says: (11/8/19 12:54 PM)
Meanwhile, ESPN's Bradford Doolittle writes that during the playoffs he "Iwent to Washington, D.C., where a sterile new urbanist neighborhood is sprouting up around Nationals Park like an invasive species." (Not sure how he knows about the fertility of so many here.) link


202_cyclist says: (11/8/19 1:49 PM)
We can have an honest debate about some of the architecture in the neighborhood but does Mr. Doolittle prefer vacant lots and warehouses instead? If it is a sterile neighborhood, why are their many visitors every single day, including the days when there are no Nats games, going to the many restaurants in the neighborhood and our two great parks?


dcgent says: (11/8/19 2:18 PM)
And another restaurant is on the way, per Tom Sietsema of the Post--FOOD FLASH: The co-executive chefs at one of Washington’s most sought-after reservations tell me they’re parting ways with the restaurant they helped open two years ago. Which is another way of announcing that Gerald Addison and Chris Morgan are leaving their live fire show at Maydan on Nov. 19.


“It’s bittersweet,” says Addison. “There’s no good time to leave a restaurant,” says Morgan. “Our love for Middle Eastern food will never change.” But even before they partnered with Rose Previte to create Maydan, the chefs knew they wanted to eventually open a place of their own, and now that they have a location in the Navy Yard, the time seems right.


Both 31, the chefs can’t go into a lot of details just now. But their next act, under 100 seats, will be “completely different,” says Morgan. So no live fire. “Not every restaurant can do that.”



Clue No. 1: Their next restaurant will be "something the city doesn't have," says Morgan. Clue No. 2: The food will be something they’ve never done before in a professional setting but have experimented with on their own, adds Addison.


The forthcoming restaurant is expected to launch next spring and find the two chefs working side by side, like now, but more involved in business matters and service steps than they are now.


bdj says: (11/8/19 5:47 PM)
Now that is exciting!! Love when big name chefs come to the neighborhood.


RMP says: (11/9/19 8:39 PM)
Petalpalooza 2020 coming to the neighborhood. link


ValveetaChz says: (11/10/19 8:15 AM)
I just heard on the news that El Tamarindo is coming to the neighborhood near Nationals Park. Please let this be true. I love their pupusas!!!


Brett M says: (11/12/19 3:53 PM)
It's disappointing to see the new Capper Seniors Center being reconstructed with the wood frame. Hopefully this time they'll maintain the fire alarm system in working order.


conngs0 says: (11/13/19 6:06 PM)
Brett M, I echo your disappointment on the structure of the new Capper Senior Center, but if essentially rebuilding the same building is necessary to get residents back sooner, then so be it. I agree the key is the maintenance of the building. Obviously hiring a competent management company would be a good start (wouldn't it be a kick in the teeth if Edgewood is brought back?). But really the responsibility rests on DCHA to hold accountable whatever management company it hires and also enforce its own rules regarding access to its facilities. I'm hopeful but not terribly optimistic.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

dcgent on Albi Opening This: UrbanTurf looks at what's coming housing wise for the area https://dc.urbanturf....
Shogungts on Albi Opening This: @Jason - not sure if that is the plan, but it would be nice. I went by there th...
Jason on Albi Opening This: Any news on Half Street between M and N? I've heard that it's being turned into ...
202_cyclist on Retail Roundup: When parking is further reduced, people can take metro to one of the two station...
walt on Retail Roundup: I also want to comment that I greatly prefer when a new street is named 1 1/2 st...
walt on Retail Roundup: Any guesses as to what will happen when parking is further reduced in the neighb...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O 11TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/19/20
900 B/O M ST SE   BURGLARY
Burglary Two
 02/19/20
1200 B/O HALF ST SE   ROBBERY  02/18/20
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/15/20
400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  02/08/20
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/02/20
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/01/20
600 B/O VIRGINIA AVE SE   ASSAULT WITH A DANGEROUS WEAPON  01/29/20
1300 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/27/20
1100 B/O 8TH ST SE   BURGLARY
Burglary Two
 01/25/20
303 VIRGINIA AVE SE   ROBBERY  01/25/20
400 B/O M ST SE   THEFT
Shoplifting
 01/23/20

Recent Issued Building Permits Archive  
909 4TH ST SE   
02/12/20 
MEREDITH FASCETT / null
E2004655 / SUPPLEMENTAL
1300 4TH ST SE APT 214   
02/03/20 
null / NA NA NA
EHOP20983190 / HOME OCCUPATION
1021 5TH ST SE   
02/13/20 
KEVIN WILLIAMS / KEVIN WILLIAMS; KEVIN WILLIAMS
B2005053 / CONSTRUCTION
Apply for building permit to have final closing inspection for permit #B1602481 & B1602513 per inspector inspection report since these permits has expired.
82 I ST SE   
01/27/20 
GDV EYE STREET LLC / null
P2003302 / SUPPLEMENTAL
   
01/27/20 
GDV EYE STREET LLC / null
M2001261 / SUPPLEMENTAL
100 I ST SE APT T-13   
01/25/20 
null / NA NA NA
EHOP20960826 / HOME OCCUPATION
150 I ST SE   
02/14/20 
SQUARE 737 LLC / JASON D DORRIS
AH2000818 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail, and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
250 M ST SE   
02/14/20 
SQUARE 769 LLC / null
P2003901 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
01/30/20 
NEW JERSEY AT H LLC / MICHELLE GABBITAS
AH2000649 / CONSTRUCTION
Manhole rehabilitation on New Jersey, 2nd St and M St SE to repair 3 existing sewer manholes in DDOT ROW. Work will all be done through existing manholes (trenchless) and include lining, rebuilding and bypass of existing manholes.
861 NEW JERSEY AVE SE   
01/28/20 
DISTRICT OF COLUMBIA / JANE MCCRAY
AH2000647 / CONSTRUCTION
Pepco contractor, W.A.Chester, will be splicing cable on 02 / 01 / 2020 - 02 / 28 / 2020, from 9 PM - 7 AM.
1275 NEW JERSEY AVE SE 20003   
02/14/20 
BROOKFIELD PROPOERTIES / TIM GOOD
AH2000849 / CONSTRUCTION
After hours to conduct work on 1275 New Jersey Ave SE on the upcoming holiday, Presidents Day, February 17, 2020. Operations would include below grade concrete and waterproofing activities with access limited to N Street. This permit would not include extended work hours beyond the normal 7am to 7pm period.
1275 NEW JERSEY AVE SE   
01/29/20 
US GOVERNMENT / null
E2004153 / SUPPLEMENTAL
   
01/29/20 
MILLER AND LONG / WILLIAM MOORE
AH2000659 / CONSTRUCTION
Afterhours to pour concrete with pump truck from 11pm to 7am from 2 / 6 / 2020 to 3 / 6 / 2020
   
01/30/20 
UNITED STATES OF AMERICA / VINCENT J. BROWNING; VINCENT J. BROWNING
P2003449 / SUPPLEMENTAL
1-Oil / Sand interceptor
   
01/30/20 
US GOVERNMENT / null
E2004202 / SUPPLEMENTAL
   
02/07/20 
MILLER AND LONG / WILLIAM MOORE
AH2000699 / CONSTRUCTION
Afterhours to put up towercrane with mobile crane saturday 2 / 8 / 2020 and 2 / 9 / 2020 from 5am to 1159pm
1299 NEW JERSEY AVE SE   
02/18/20 
FOREST CITY SEFC LLC / STRAUCHON; SEE BELOW
BCIV1800153 / CONSTRUCTION
Phase 1A BCIV Permit Description - BCIV 1800153 - The subject BCIV permit is for the Phase IA development of Quander St SE, N Pl SE, and 1-1 / 2 St SE within the overall Forest City, Yards West (FCYW) development area which emphasizes: pedestrian-focused public realm, optimized utility corridor, fully integrated SWM design, and complete street and vision zero design. The FCYW Phase IA is comprised...
1322 PATTERSON AVE SE   
02/13/20 
JOINT BASE ANACOSTIA BOLLING - UNITED STATES NAVAL OBSERVATORY SI / TONYA HARRIS; TONYA HARRIS; TBD
BCIV2000046 / CONSTRUCTION
***FEDERAL PROPERTY*** PROJECT WILL CONSIST OF DREDGING THE EXISTING RETENTION POND AND INSPECTING AND CLEANING THE OUTLET CONTROL STRUCTURE (S1) LOCATED ON THE UNITED STATES NAVAL OBSERVATORY TO REMOVE SEDIMENT ACCUMULATION. CONTRACTOR SHALL AVOID THE CLEARING OF VEGETATION ON POND EMBANKMENTS AND SURROUNDING AREAS SO AS TO KEEP RESTORATION AND REPLANTING TO A MINIMUM.
71 POTOMAC AVE SE   
02/13/20 
MRP REALTY / JAMES VANEGAS
AH2000681 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
   
02/19/20 
RIVERFRONT HOLDINGS II, LLC / JUSTIN BISHOP; JUSTIN BISHOP
SP1900054 / CONSTRUCTION
Construct a 680 sqft concrete swimming pool inside an existing waterproofed structural box on the 14th floor. All MEP, decking and fencing work by other trades under separate permits.
227 TINGEY ST SE   
02/12/20 
GONE YARD HOTEL OWNER LLC / BOB BIROONAK; BOB BIROONAK
SG2000048 / CONSTRUCTION
one double face illuminated blade sign
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.