Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: The Yards
See JDLand's The Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


504 Blog Posts Since 2003
Go to Page: 1 | ... 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51
Search JDLand Blog Posts by Date or Category

A press release just in over the transom is announcing that Forest City has hired CB Richard Ellis to handle the leasing of what's being called 401 M Street, the office building to be built on the southeast corner of 4th and M just east of the US Department of Transporation HQ. This is "Parcel D" on my Yards First Phase page, and is the building that will have a grocery store on the first floor in addition to the 300,000 sq ft of office space. Construction is scheduled to start next year, with delivery in spring 2010. (There's also an ad announcing this in today's print edition of the Washington Business Journal.)
More posts: Retail, The Yards, Twelve12/Teeter/Yards
 

This afternoon, the National Capital Planning Commission gave their "does not adversely effect federal interests" approval to the recent zoning amendment allowing temporary surface parking lots on various blocks near the stadium, subject to the removal of the Canal Park parcels from the amendment and also that any of the temporary lots on waterfront parcels be set back a minimum of 75 feet from the Anacostia shoreline. They also want the final order of the text amendment to make clear that the five-year cap on these lots cannot be extended via a Board of Zoning Adjustment Special Exception.
The staff report indicated what we've heard in the last day or so, that the Office of Planning will indeed be modifying the amendment to take out Reservation 17 parcels B, C, and D (the Canal Park blocks) before the Zoning Commission's final vote on July 30. There was also slightly curt exchange between two of the commissioners during the discussion of the parking situation about why the US Department of Transporation headquarters can't make some accommodation to allow public parking (as the Reagan building does) in some of its 800 parking spaces; as is now so often the case in this city, "Sept. 11" was the answer.
The commission also approved the 35% design plans for The Yards--many of the renderings and drawings that were in the presentation to the board today are already on my Yards First Phase page. This submittal to the NCPC covered the streetscape, landscape, and infrastructure improvement plans, and the plans for the first four developments on the site--renovation of two existing buildings to create 430 residential units, the renovation of Building 167 into a 46,000-sq-ft retail space, and the construction of two new buildings at 4th and M that would have 320,000 sq ft of office space, a grocery store, and 170+ apartments. Work on the streetscape and infrastructure improvements will be starting this summer, and the first of the building renovations will get underway next year, with 170 apartments and the Building 167 retail to be delivered in mid-2009. This plan will also be in front of the Commission on Fine Arts on July 19.
I hope to get electronic versions soon of the staff recommendation documents for both of these votes, which contain lots of good summary information for people who haven't been following these cases quite as, um, closely as SOME people. I'll update here when I get them.
So, for Canal Park fans, everything seems to be pointing to the hoped-for conclusion, though it won't be 100% written in stone until the July 30 Zoning Commission meeting.
UPDATE: Here's the recommendation document for The Yards; I hope to have the parking one on Friday, so check back.
UPDATE II: Believe it or not, NBC 4 covered the meeting today. (Maybe they got the idea from today's District Extra!)
More posts: Canal Park, parking, The Yards, zoning
 

At Tuesday's council meeting, an emergency resolution was passed to allow the issuance of bonds that will bring $140 million in proceeds to fund various Anacostia waterfront projects, including the waterfront park at The Yards and Diamond Teague Park. The money is coming from a Payment-in-Lieu-of-Taxes agreement for the Department of Transportation HQ, land that can't be taxed by the city because it's federal property. The original PILOT bill laying out the specifics was passed last October and the city and DOT developer JBG signed the agreement in February. I'm not 100% sure why there's now this new emergency resolution, although my bleary-eyed morning reading of it sees that perhaps the council was required to officially approve which projects were designated to get the funding. And, in order to issue the bonds before the end of this fiscal year, the council needed to act quickly, hence the emergency legislation.
A tidbit from the resolution: one of the projects listed as needing this funding is "a new ferry pier at the foot of First Street, SE"; this is the Diamond Teague Park location that's right across the street from the ballpark. I've been hearing rumors lately that the Anacostia Waterfront Corporation has the building of this pier on a very fast track, with the intention of getting it ready by Opening Day 2008; there's scuttlebutt is that the permit applications have already been filed with the US Army Corps of Engineers, though I don't see evidence of that just yet. Perhaps we'll hear more about this at tomorrow's hearing on the move of the AWC into the Office of the Deputy Mayor for Planning and Economic Development.
More posts: Nationals Park, Teague Park, The Yards, Yards Park
 

In advance of Thursday's National Capital Planning Commission meeting that will review the surface parking lots zoning amendment, the Voice of the Hill has posted a piece about the controversial inclusion of the Canal Park blocks within the parcels approved for parking. Much of the piece covers territory I've written about over the past few days, but has some new nuggets. Money quote: "Joel Lawson, the Office of Planning's acting deputy director for neighborhood and long-range planning, said the portions of squares containing Canal Park were never intended to be used for parking and should not have been included. 'I can understand why people are concerned about this,' he said. But, he added, 'We knew the parking wasn't going to go there.' He said the planning office will amend its request to make explicit this provision." Another quote, from the spokesman for Deputy Mayor of Planning and Economic Development Neil Albert: "We have no intention to use this three-block site for stadium parking, and we fully expect to move forward in building this important public amenity on schedule." This would appear to make the NCPC meeting less of a critical juncture, but I'll still be there to check it out. Besides, they're also having a big presentation on the first-phase plans for The Yards.
More posts: Canal Park, parking, The Yards, zoning
 

Once again venturing reluctantly into the world of live human beings, I went to last night's Zoning Commission meeting. Here's a wrapup:
* After waiting a month to get input from the Office of Planning, the ZC gave some guidance on Florida Rock's revised plans for its 5.8-acre site on the Anacostia. The phrase uttered most often was "on the right track" -- each commissioner mentioned something in the new designs that they weren't completely crazy about (the glass "campanile" viewing tower on the east building seemed not to have wowed them), but they were mainly complimentary, making clear that the new design was an improvement over the last go-round and is closer to what the ZC wants to see on the site. (Read my entry from February for more background on the ZC's objections to the last design.)
This was not any sort of decision-making stage--the Florida Rock developers were wanting to make sure that they didn't expend vast amounts of energy pursuing a design that would end up again being nixed by the commission, and now with the sense that their latest idea has the ZC's support, they can work on their designs in more detail and apply for a modification to their second-stage PUD, which would then have a public hearing. I don't have any idea at this point what the time frame on this would be.
* Camden Development's planned 276-unit residential building at 1325 South Capitol Street was looking for a vote to approve its PUD, after a hearing a few weeks ago when Commissioner Turnbull complained that the western side of the building (facing Southwest) wasn't designed well enough given how "on display" it will be, and Commissioner Hood wanted more information on how the affordable units would be allocated throughout the building. So tonight, after some revised submittals, it came before the commission for a vote to approve its design--and Commissioner Turnbull complained that the western side of the building wasn't designed well enough given how "on display" it will be, and Commissioner Hood wanted more information on how the affordable units would be allocated throughout the building. In other words, neither felt that their concerns from last time had been addressed, and so have requested further filings before a scheduled vote on July 30.
* In an easier item, the commission voted 5-0 to give final approval to the design of the planned office building at 250 M Street. But, as reported a few weeks ago, developer William C. Smith has indicated that they are waiting for the building to be about one-third leased before starting construction.
* Finally (yay), the commissioned approved for setdown (meaning there can be a hearing) on Forest City's request for various amendments to the Southeast Federal Center Overlay as part of their plans to develop The Yards. These requests address some pretty darn technical issues in the overlay and are pretty baffling, even for obsessives like me, so I will just point you to the Office of Planning report if you really want to know what's happening. Please note that this is not the case requesting surface parking lots at The Yards--it's having its hearing on July 26.
 

With the calendar inching toward DC's annual August shutdown, there's a boatload of meetings and hearings on the agenda this week as everyone tries to get their work done before heading for the beach. Here's a not-very-detailed rundown, so follow the links if you want more detailed information:
* Monday starts bright and early with the "public hearing and preliminary finding" by the office of the Deputy Mayor for Planning and Economic Development on the Capitol Riverfront Business Improvement District application, in Room 301 of the Wilson Building, 10 am.
* The Zoning Commission's monthly public meeting on Monday night includes a final vote on the plans for the 250 M Street office building and a first vote on the 1325 South Capitol Street residential project. In addition, there's a new case looking for various amendments to the Southeast Federal Center overlay; here's the Office of Planning report spelling them out. The commission is also scheduled to address Florida Rock's request for guidance on its revised design, which has the support of the Office of Planning. The meeting is at 6:30 pm at One Judiciary Square (Suite 220 South), but also can be watched via live webcast.
* At about the same time, ANC 6D is having its monthly meeting, and will be having a presentation and vote on Forest City's July 26 zoning hearing to allow temporary surface parking lots at The Yards. This meeting is at 7 pm at St. Augustine's Episcopal Church, 6th and M Streets, SW. (Having to make a choice, I'm opting for the zoning meeting, so it might take a little while before I find out what happened at the ANC.)
* Tuesday's city council meeting at 10 am will include a final vote on the bill to create the Capitol Riverfront Business Improvement District.
* On Tuesday night WMATA is having a public hearing on the proposed move of the Southeastern Bus Garage from its current location at Half and M to a new facility at DC Village in Southwest. (It's probably geared more toward residents near the new location.) There's an open house at 5:30 pm, and the hearing itself starts at 6:30, at 2700 Martin Luther King Dr. SE.
* The Nationals ballpark is having its "Topping Out" party on Wednesday at noon.
* WMATA's Planning, Development and Real Estate Committee is meeting in executive session on Thursday morning to address something having to do with the Southeastern Bus Garage, but they're not saying what.
* Thursday also sees the National Capital Planning Commission meeting that Canal Park fans mobilized for, with the NCPC's agenda including the zoning commission case approving temporary surface parking lots on various blocks in Near Southeast that include Canal Park in their boundaries. There's also a presentation on the the first phase of The Yards. The meeting is at 12:30 pm at 401 9th St., NW, Suite 500.
* Wrapping up the week (pant pant pant) is a city council Subcommittee on Economic Development hearing on the transition plans for folding in the Anacostia Waterfront Corporation and the National Capital Revitalization Corporation into the office of the Deputy Mayor for Economic Development; it's in the council chamber at the Wilson Building at 10 am, and may also be broadcast on DC cable channel 13 and via streaming video.
And then I will spend the weekend alseep.
 

With many thanks to Forest City Washington, I've posted a bunch of renderings of the four projects that are on the boards at The Yards in its first phase of development. These came from the submission on the first phase that FC made in advance of its July 12 presentation in front of the National Capital Planning Commission, and while they have some nice drawings of the plans that I've written about in the past for renovating three of the historic buildings at the old Southeast Federal Center, the big news is the first hints of what's planned for "Parcel D", currently a parking lot on the east side of 4th Street south of M: it's to be a residential building the south end of the site and an office building on the north end that would have a grocery store on the ground floor at 4th and M. The drawings also show the additional floors to be added to the brown-and-white Building 160 and imposing red-brick Building 202, both of which have interior atrium/courtyards I never knew about. And there's a few cool renderings of the plans for transforming the very industrial Building 167 that sits right behind the new DOT HQ into retail space. (Plans for the five-acre waterfront park and other areas in the Yards were not part of this submission.)
I didn't get the entire submission, so I'm not knee-deep in details, but everyone should definitely look at these drawings to see what's coming at The Yards. We should be seeing the beginnings of the streetscape improvements Any Minute Now (which include landscaping that barren area on the west side of New Jersey Ave. south of M), but the completion of the Building 167 retail and Building 160 residential won't happen before 2009, and the Parcel D/grocery store project *could* finish in 2010. So don't pack your bags or write your shopping list just yet.
 

As expected, there is now a request in front of the Zoning Commission to approve temporary surface parking lots on parcels totaling 396,000 sq ft in the Southeast Federal Center (i.e., "The Yards"), to last no more than five years and to be available for Nationals ballpark parking (among other uses). There are four lots, which I highlighted a few months back on my Stadium Parking page map: on the southeast corner of 1st and N (where there is already a parking lot, along with a one-story brick building scheduled to be demolished); two spots on the SEFC land south of Tingey and DOT and east of the WASA pumping plant; and on the southeast corner of 4th and M, behind the red brick wall, where a surface lot already exists. According to the meeting notice, temporary lots at the SEFC are already permitted under the existing Southeast Federal Center overlay, subject to approval by the Zoning Commission.
I don't know anything more about this other than that there will be a ZC hearing on July 26; I'll be working to find out exactly how many spaces these lots may make available, although in the presentation slides from the March public meeting there was an indication that 1,700 additional spaces could be available at the Federal Center. These would be on top of the other temporary surface lots recently approved, and would bring the count of potential available spaces on all temporary lots to 5,475 spaces, on top of the 1,225 spaces being constructed on the stadium footprint (adding up to 6,700 spaces, higher than the 4,900 spaces that planners anticipate will be needed for the highest-attendance games). Of course, not all of the identified potential lots will end up being used, and the likely total count from all lots is probably closer to 5,200, but this is clearly a healthy-sized addition to the lots approved last month. More information as I get it.
UPDATED with corrected numbers on the potential spaces, because math is apparently not my strong suit late on a Friday night. But these new numbers are still just speculation on my part based on that March public meeting on parking--we have to wait to see exactly how many spaces planners are anticipating at the SEFC.
UPDATE, 6/11: This zoning request apparently would allow for 925 paking spaces in four lots at The Yards; so it's far lower than what was projected for the SEFC at the March public meeting on the stadium transportation planning. It does mean that, if approved, up to 5,925 permanent and temporary spaces are in the mix around the stadium site (1,225 on the ballpark site itself and the rest from the temporary surface lots). And that doesn't count any possible spaces in lots beneath already-constructed buildings near the stadium. But hopefully some clarity will arrive when the draft Traffic Operations and Parking Plan is released by the DC Sports and Entertainment Commission, supposedly this month.
More posts: parking, Nationals Park, The Yards, zoning
 

Today's Post Business section has "A Neighborhood Rises at The Yards," which gives a quick overview of the plans for the old Southeast Federal Center, as well as a profile of Deborah Ratner Salzberg of Forest City Washington. The article mentions a lot of what I posted back in March, that the infrastructure work at the Yards will begin soon (sewer lines, paving streets, putting up street lights and planting trees) so that it can look a bit more presentable when baseball arrives across the street in 2008. (It's expected that surface parking for stadium-goers will be available on lots at The Yards not slated for immediate redevelopment, but no announcement has been made yet.) The article also confirms my previously posted information that the brown-and-white Building 160/Old Pattern/Joiner Shop will be rehabilitated as a residential building, with an expected completion date in 2009. The article also mentions that Building 173/the Old Lumber Storage Shed (the terra cotta-colored building at the north end of the site of the planned five-acre waterfront park) will be remade into a restaurant pavilion; the first phase of the park is expected in 2010. Additional near-term projects not mentioned in the story are the planned renovation of Building 167/the Old Boiler Maker's Shop just to the rear of the new DOT HQ into a retail building and the redevelopment of Building 202/the Old Gun Assembly Shop at 5th and M into another residential block in a joint project between Forest City and PN Hoffman.
You can look at my Yards overview page for a hard-to-read map and guide to the various projects expected to come during the many years of the Yards' redevelopment; there's also plenty of pictures on the Yards Photos tab, as well as a new rendering that appeared with the Post story of what Building 160's renovation will look like. You'll also see at the top of the page a shot of the new Yards sign that appeared at 1st and N this past week.
 

From a press release, word arrives that soon we'll be seeing a spiffy video showing us what the Southeast and Southwest Waterfronts are projected to look like in the future: "Interface Multimedia, a leading provider of state-of-the-art visualization services, and WDCEP, the Washington DC Economic Partnership, announced today the debut of the Capitol Riverfront video, the highly anticipated overview of $13 billion of development along the southern waterfronts of Washington, DC. Following a five-month collaboration with the WDECP and 25+ area developers and architects, Interface Multimedia's Capitol Riverfront video will debut on Monday, May 21st at the ICSC Spring Convention in Las Vegas. The five-minute video fuses massing models, renderings, map graphics, fly-by animations, copy writing and narration into a montage of the current and planned development of this highly sought-after area of Washington, DC. [...] The high-density area embraces neighborhoods around the new 26-acre Washington Nationals' baseball stadium, delivering in the Spring of 2008, and creates a vibrant, walk-to-work lifestyle with retail, shopping and entertainment at every doorstep. Within the next five years, development is expected to bring 1.3 million SF of retail and 10.1 million SF of office space to the Capitol Riverfront. More than 11,500 residential units are set to deliver by 2012. Cultural additions include the new 250,000 SF Arena Stage, pedestrian-friendly bridges, 10 scenic parks, waterfront promenades and the 22-mile Anacostia Riverwalk trail. " There will soon be a web site hosting the video, according to the release. The video's creation has been sponsored by a laundry list of the heavy hitters of the neighborhood's redevelopment: the Anacostia Waterfront Corporation, Forest City Washington (The Yards), JBG (the new DOT HQ), Monument Realty (bringing you Half Street in the Ballpark District), PN Hoffman (the Southwest Waterfront and also the redevelopment of Building 202 at The Yards), and Urban-City Ventures. And it should be noted that "Capitol Riverfront" is the name given to the Business Improvement District now being set up that will cover most of Near Southeast (just in case you might have thought that a branding opportunity was being passed up, which as we know rarely happens).
 
504 Posts:
Go to Page: 1 | ... 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51
Search JDLand Blog Posts by Date or Category