Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: The Yards
See JDLand's The Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


504 Blog Posts Since 2003
Go to Page: 1 | ... 45 | 46 | 47 | 48 | 49 | 50 | 51
Search JDLand Blog Posts by Date or Category

Today's DC Register has published the final version of the text amendment (case 05-10) to the Capitol Gateway Overlay District zoning regulations that has been winding through the process since early 2005. From the order: "The amendments place limits on density transferred through combined deployments, extend the Zoning Commission review and approval process and design guidelines to additional properties within the boundaries of the Capitol Gateway ("GC") Overlay, and establish preferred retail and entertainment use requirements and regulations along First and Half Streets S.E. within the area. In addition, the rules impose, within the Overlay, a 15-foot setback and a 1:1 upper story step-back above a height of 110 feet for buildings fronting South Capitol Street; an upper stories set-back for building[s] fronting Half Street S.E.; and a 1:1 upper story step-back above a height of 110 feet for buildings fronting Potomave Avenue S.E. and S.W. The rules also provide for referral to the National Capital Planning Commission of all applications for the review of buildings and uses on lots that abut South Capitol Street." Whew! The CG Overlay has yet to be posted in its entirety on the Zoning Commission web site (see that "Reserved" for Chapter 11?), but in the interim I've cobbled together the various ZC orders and other documents (we're still waiting on the publication of the final order for ZC case 06-25, which extended the CG Overlay boundary across South Capitol Street) into a single sleep-inducing document. You can also read my explanatory treatise from a few months back on this Overlay and its companion, the Southeast Federal Center Overlay.
Comments (0)
More posts: South Capitol St., staddis, The Yards, zoning
 

How's that hangover? Let's start the year off with this link to the Post's "A Family Company, Forest City, Sets Out to Transform the District", a profile of Forest City Enterprises, the Cleveland-based company that "owns about 90 acres at three major Southwest and Southeast projects where it plans to invest roughly $3 billion into a mix of parks, housing, shops, restaurants and offices. And it is one of the developers working on transforming the land around the new baseball stadium -- now mostly boarded-up storefronts, car-repair garages and nightclubs -- into a vibrant neighborhood." There's not anything that qualifies as new info in the piece, but it's a good summary piece of the developments Forest City is involved in. Its biggest project in Near Southeast is the Southeast Federal Center, where "[o]ver the next decade, Forest City plans to build an almost $2 billion development of 6 million square feet -- a space almost as large as the Pentagon. Its plans call for preserving the historic buildings and turning a boilermaker shop into a retail area, creating apartments from a former carpentry building and converting an old gun mount factory into condominiums. It will also put in streets, offices, lofts and waterfront parks. In tribute to its Navy history, the project will be called the Yards." Forest City is also behind the revitalization of Capper/Carrollsburg, and, although not mentioned in the article, is likely to be one of the companies who get to redevelop the WASA site across from the stadium (if the Anacostia Waterfront Corporation can ever finish that land negotiation). And, outside my purview, they're also part of the team redeveloping Waterside Mall in Southwest. One interesting quote about the Southeast Federal Center project, from Deborah Ratner Salzberg, head of the company's DC operations: "It really will be a mixed environment that looks like it's been here forever. It won't look like Disneyland. It will be a little edgy and have the feel of the waterfront." Can't wait to see some specific plans; the company has announced in recent months that the first projects on the site are to get underway in 2007, so hopefully we don't have to wait much longer for some concrete information.

More posts: Capper, Capitol Quarter, The Yards
 

Tomorrow (Thursday Dec. 21) the Anacostia Waterfront Corporation is having a public board meeting at 5 pm. which you can either attend in person or listen into telephonically. See the announcement for details. And, because there's hardly a Near Southeast detail too small for me to pass along, I'll note that should it tickle your fancy, DC cable channel 16 is replaying tomorrow morning at 7 am the ceremony from a few weeks back when the Southeast Federal Center officially became The Yards. (Hey, at least I didn't give it its own entry!)
More posts: The Yards
 

Tonight the Zoning Commission is having a public hearing on case 06-25, a text amendment to the Capitol Gateway Overlay that would include the west side of South Capitol Street in the CG Overlay and also establish a ZC review and approval process for new developments that abut South Capitol (as is currently the case for new projects along M Street). The Capitol Gateway Overlay spells out in extreme detail exactly what the requirements are for developments along South Capitol, M, and in the Ballpark District and over to Buzzards Point, and I suggest that anyone who is interested (or concerned) about the type of development that may be coming to Near Southeast should pour themselves 9 or 10 cups of coffee and read this document. (It's not a complete version because one doesn't currently seem to exist, I cobbled this together from various ZC documents.) The preamble is worth highlighting, to see how the city has spelled out what it envisions for the area:
The purposes of the CG Overlay District are to:
(a) Assure development of the area with a mixture of residential and commercial uses, and a suitable height, bulk and design of buildings, as generally indicated in the Comprehensive Plan and recommended by planning studies of the area;
(b) Encourage a variety of support and visitor-related uses, such as retail, service, entertainment, cultural and hotel or inn uses;
(c) Allow for continuation of existing industrial uses, which are important economic assets to the city, during the extended period projected for redevelopment;
(d) Provide for a reduced height and bulk of buildings along the Anacostia riverfront in the interest of ensuring views over and around waterfront buildings, and provide for continuous public open space along the waterfront with frequent public access points; and
(e) Require suitable ground-level retail and service uses and adequate sidewalk width along M Street, S.E., near the Navy Yard Metrorail station.
From there, you are treated to pages and pages and pages of very specific requirements set out for developers (i.e., items like "Each new building shall devote not less than thirty-five percent (35%) of the gross floor area of the ground floor to retail, service, entertainment, or arts uses ("preferred uses") [...]; provided, that the following uses shall not be permitted: automobile, laundry, drive-through accessory to any use, gasoline service stations, and office uses (other than those accessory to the administration, maintenance, or leasing of the building). Such preferred uses shall occupy 100% of the building's street frontage along M Street, except for space devoted to building entrances or required to be devoted to fire control.")
There is also a separate Southeast Federal Center Overlay, again laying out much detail about what is required and allowed for that development. There's even a great map on the last page that clearly shows the allowed uses, with the 5.4-acre waterfront park and residential-zoned areas being closest to the water (so there's no plan in place to allow office buildings right on the water or even near it; the commercial zones of the SEFC are all along First Street and M Street).
I think even just casual browsing through these documents can be a bit of an eye-opener for people (like me) who don't realize exactly how many requirements are already in place for these two areas. Of course, developers can ask for relief from certain rules (or the city council can just override the ZC altogether), but having documents such as these are a solid foundation. So it's good to know what's in them.
UPDATE: (like you're still reading) The Case 06-25 CG Overlay text amendment hearing was over last night in a flash; the record is being held open until Nov. 30, with action most likely to be taken at the ZC's Dec. 11 meeting.
More posts: M Street, South Capitol St., staddis, The Yards, zoning
 

Forest City Washington has issued a press release finally giving us confirmation that "The Yards" is the new name for the Southeast Federal Center. (The press release is dated Oct. 24, but just appeared on their web site in the past day or so, and is nowhere to be found in Nexis.) The release says that construction will begin in early 2007 on infrastructure improvements; and that Forest City has "several buildings currently under design, including three of the historic buildings which will involve residential and retail uses." There are more than 30 buildings planned overall totalling 5.5 million square feet of development on the 44-acre site made of up "including approximately 2,800 residential units (both rental and for sale), 1.8 million SF of office space, up to 400,000 SF of retail/dining space a public park, riverfront esplanade and trail that will connect with the Navy Yard's riverfront walk to the east and a similar feature to the west of the site that will connect with the Ballpark District development." The press release also explains how they came up with "The Yards" and its logo. A bit more interesting is this tidbit, that "Master Lease Agreement [between Forest City and the GSA] is expected to be signed in a few weeks and other supporting documents that will enable the start of construction are in final stages of negotiation." They also freshened up the project page on the FCWashington site, which says the first phase of buildings are expected to open in 2009.

More posts: The Yards
 

GlobeSt.com has a brief on MacFarlane Partners, the San Francisco-based real estate investment firm that has fronted 25% of the capital for the development of the Southeast Federal Center (hey, buddy, that's "The Yards" to you!). The article says that "the company plans to make significant investments in the Baseball district" and that "MacFarlane says he expects to announce three mixed-use projects in the area by the end of the year. These will consist of residential, retail and office totaling some $300 million to $400 million. Right now these projects are in the early planning stage, but MacFarlane says that, depending on the density patterns, he expects the projects will cover between one million sf to two million sf." I've seen MacFarlane mentioned recently as part of the group working on Herb Miller's stadium garages plan, but I don't know whether this statement about the three soon-to-be-announced projects would include the garages, or if it includes any part of the SFC/Yards, or if it's partnering with Forest City and Western Development (Herb's company) on the AWC's drive to develop the WASA site, or if it's three completely new projects. I guess we shall see. (Read the GlobeSt brief quick, because they archive after seven days.)
 

I don't quite know what to make of this, but here goes, from NBC4: "The fast-redeveloping Southeast Waterfront next to the Navy Yard and near the new baseball stadium is being turned into new offices, condos and shops. But, the area will now be called 'The Yards,' in honor of its nautical history." Putting aside for the moment why they didn't instead choose a catchy name like "JDLand", I'm trying to divine from this piece actually what area they're talking about. My initial thought is that this is just for the 44-acre Southeast Federal Center land, which is indeed next to the Navy Yard and near the stadium, and is in the hands of a single private developer (Forest City Washington) and also the Feds, which dovetails with the spot being described as a "federal entity" at one point in the article. If I'm guessing correctly, I actually don't mind rechristening the SFC as "The Yards." But if they're trying to rename all of Near Southeast, including the Ballpark District and everything, we might have a problem. Anyone out there (with CB Richard Ellis or with the city) have any light to shed? And, if I pegged it correctly as being the Southeast Federal Center, does this mean that they're about to get moving on their first phase? UPDATE: A little birdie passed along this link to (not quite launched) dcyards.com, confirming that "The Yards" is indeed the Southeast Federal Center. And construction apparently will begin in 2007. Man, I'll tell ya, NBC4 had to work pretty hard to make sure that almost no useful information was in that article, seeing as the who/where/when (Developer? Location? Timeline?) were all AWOL.
More posts: Nationals Park, The Yards
 

Yet another Near Southeast-related bill has been introduced to the DC Council--this one is B16-0932, the "Square 770, Lot 802 Securitization Act of 2006." My not-so-learned reading of the bill tells me that this bill is authorizing the issuing of bonds not to exceed $140 million (principal), $40 million of which will go toward funding a portion of the costs of the five-acre Anacostia Waterfront Park planned along the river between 2nd and 4th Streets (within the Southeast Federal Center land), as well as the infrastructure improvements needed to allow for public access to the site. An additional $75 million will help fund other (unnamed) Anacostia Waterfront Initiative infrastructure improvements. The bill also sets up the DOT HQ's parcel (Square 770, Lot 802) to now be exempt from property taxes and instead have those payments go into the new Anacostia Waterfront Park Fund, to be used to repay the financing of the bonds and other expenses related to the park. You can read more about this PILOT plan in this June 2 post. UPDATE: There is also now PR16-1004, which appears to be amending the earlier DOT PILOT bills a touch. There is also a DOT PILOT technical amendment being voted on as emergency legislation at the Oct. 18 city council session--might be the same as PR16-1004, but I can't tell for sure. UPDATE, 11/2: Here is the actual resolution that was passed on Oct. 18 on an emergency basis, PR16-1039, The "DOT Pilot Revision Emergency Approval Resolution of 2006."
 

Now that the tiff over the 1,200 on-site spots required by the Stadium Lease Agreement seems to be heading toward some sort of settlement, attention is turning to the lack of additional parking. WTOP reports ("Not Enough Parking Planned at New Stadium, Critics Say"). I've heard of plans for temporary surface parking at the Southeast Federal Center until that project gets more built out, and of course there's plenty of underused land at Buzzards Point that I might guess could be converted to temporary parking lots (which would also funnel more people toward the open South Plaza and away from the northern entrance by the garages), but people used to 10,000 surface spaces at RFK (the same people who have no interest in taking Metro) are getting antsy. Then again, how many on-site spaces are there at MCI Center (especially in comparison to the acres of parking lots at the old Capital Centre)? But, as Adrian Washington of the AWC is quoted as saying, "Almost every development that will go in there on other parcels -- that either we control or private developers control -- will have a substantial amount of underground parking." This handout from a Nov. 2005 community meeting mentions on page 15 the surface lots on undeveloped land, noting that they estimate a need for around 4,000 spaces.
More posts: parking, staddis, The Yards
 

This week's Washington Business Journal has a cover story ("Seeing the Future") about the coming Ballpark District, and the challenge of creating from a blank slate something new and vibrant that works but isn't "Disneyfied." There's a lot of comment from architects and planners about which design cues the area should take (Navy Yard and Southeast Federal Center, not the stadium itself). A little bit of news: Monument Realty is planning its first two buildings in the Ballpark District, on the east side of Half Street between M and N, a residential project designed by Shalom Baranes (one of the firms working on the SEFC) and an office building designed by Davis Carter Scott. (UPDATED to add the link now that the story's posted.)
 
504 Posts:
Go to Page: 1 | ... 45 | 46 | 47 | 48 | 49 | 50 | 51
Search JDLand Blog Posts by Date or Category