Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Canal Park
See JDLand's Canal Park Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


181 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 19
Search JDLand Blog Posts by Date or Category

* The agenda for Monday's ANC 6D meeting has been sent around (not yet posted online). They'll be revisiting the designs for exterior trash enclosures on certain Capitol Quarter townhouses that were discussed and given the thumbs down last month. Other items include the potential modification of the 70 bus route, the franchise agreement between the city and Verizon for FiOS, and street closures for the SunTrust National Marathon on March 21. The meeting is at 7 pm at St. Augustine's church, Sixth and M streets, SW.
* Meeting at the same time on Monday (well, starting at 6:30 pm) will be the DC Zoning Commission, with a vote on the proposal to move 225 Virginia Avenue into the Capitol South Receiving Zone (read about it here).
* The city's Public Space Permit feed is back. Yay! Hopefully the Building Permit feed won't be far behind.
* One thing we've all learned over the years is to not believe anything about the school buses leaving Canal Park until we actually see them all drive away. But I will note that the DC Housing Authority currently has a solicitation out for a contractor to build surface parking lots at DC Village (which is where the buses are relocating to). Bids are due Nov. 18. I'm hearing "mumbleJanuarymumbleFebruarymumble" as a potential timetable for the departure of the buses, but see sentence #1 of this paragraph.
Comments (0)
More posts: ANC News, Canal Park, Capper, meetings, zoning
 

On Monday night the Zoning Commission held a brief hearing on Case 06-32a, the request by the city to move the old Post Plant at 225 Virginia Avenue into the "Capitol South Receiving Zone," which would allow the block to receive transferable development rights, allowing greater height and density than the 6.5 FAR and 90-ft-height currently allowed.
When this was originally brought before the commission by developer Washington Telecom Associates for setdown two years ago, the Office of Planning indicated that they wouldn't support the request because of concerns about the added density on that block affecting both Canal Park to the south and Capper/Carrollsburg townhouses to the east (read the transcript for more details). Since that time, the city subleased the building (paying $500k a month in rent), but has decided not to use it to house police department functions and so is in the process of finding a developer to take over its sublease (which also has an option to buy).
In their pre-hearing report and during last night's session, OP said they are now prepared to support the move to the receiving zone, "provided that there is Zoning Commission review of the design of the portions of a building proposed to rise higher than 90' " which would confirm that the building "will be sufficiently setback from the eastern building face to avoid shadowing the lower buildings in Square 797 to the east" and that it "will provide a suitable northern focal point for the Canal Blocks Park." The OP report says that this lot would not be exempt from the city's inclusionary zoning requirements.
The three commissioners in attendance (Hood, May, and Turnbull) asked a few cursory questions, and noted that there was no report from ANC 6D nor any witnesses in support or opposition. The ZC will vote on this case at its Nov. 10 public meeting.
With the OPM page on the 225 Virginia Request for Expressions of Interest saying that notification was to have happened yesterday, I thought there was a possibility that this hearing would give us some hint as to who might be taking over the city's lease, but the Office of Planning said they didn't know who the developer might be.
 

Yes, it's time once again for What's the Deal With.... Canal Park? Now that the ballpark's open and people have stopped asking me about the baseball that was originally planned for the roof of the Red Loft, I can safely say that there is no question I receive more often than this one. Here's the latest:
Over the past few months, the Canal Park Development Association has been resurrected, and is now being led by Chris VanArsdale, a local lawyer-turned-green-developer. An agreement is being worked on with the city that will allow the CPDA to take on moving the park forward, a task that ended up in the Office of the Deputy Mayor for Planning and Economic Development after the demise of the Anacostia Waterfront Corporation.
Of course, there will be no moving forward of the park until the dang buses are gone. The timeline being put forward by DMPED is now "December or January" for the departure of the buses, since a new location has been found (*cough*DC Village*cough*) but a lot still must be built. (It's at this point that I'm always required mention that it was in October 2003 when I first heard the city had been given 90 days to get the buses off the park site.) The park's blocks would then be graded and temporary sod planted until the park itself is built.
So, when will the park actually be completed? You didn't actually expect anyone to tell me that, did you? However, indications are that once the license agreement between the CPDA and the city is finished, we'll get a better sense for what's left to be done and when it all could happen.
In the meantime, while twiddling your thumbs waiting for the next news tidbit, take a look at the designs and plans for the park, which came as the result of a 2004 design competition held by the city. Are they still holding up? Discuss. (Hey, it's summer, I've got to do something to perk up the energy around here.)
Comments (0)
More posts: Canal Park
 

* Sorry I missed this until now: the Post reported that on Saturday evening "[a] motorcycle was headed west on M Street SE about 6:30 p.m. when a car traveling south on Seventh Street began to turn onto M Street. The car and motorcycle collided, and the motorcyclist was fatally injured, police said."
* The Post's Grounds Crew blog has only now discovered that there's a Five Guys just around the corner from the Navy Yard subway station east entrance (on Second Street north of M, if you haven't discovered it yet, either).
* The PSA 105 mailing list announced yesterday that they are having a "Summer of Safety Ice Cream Social" at Capitol Hill Tower "to show unity with the citizens of Capitol Hill and the Metropolitan Police Department by sharing some nice and cool ice cream while sharing information." The message said that the social is from 2 to 5 pm on June 25. A Wednesday afternoon? I wrote asking for confirmation, but haven't heard back. Anyone out there with the {ahem} scoop?
* Washington City Paper and WBJ both note layoffs at MacFarlane Partners through the prism of how it might affect the drive to put a soccer stadium at Poplar Point; I see the news and wonder about the capital that MacFarlane is supposed to be investing in both The Yards and Monument Realty's Half Street.
* Is the report in the July Southwester that Monument Realty and the Corcoran Gallery have received zoning approval to delay to 2015 (from 2011) their planned redevelopment of the the Randall School site at Half and I SW something to wonder about, too?
* And, while I'm heading off the reservation with all of this wondering, did anyone else read this Post story on fuel prices causing problems for school districts' transportation budgets and ponder whether buses would have to drive farther to and from their daily routes from a parking lot at DC Village as compared to one at Second and M, SE?
 

(Yay! Non-ballpark news!) The *most* asked question at JDLand.com these days (apart from "what happened to the baseball on top of the outfield restaurant" and "can you start covering Southwest") is What's the Deal With Canal Park, the three-block long new public park planned for the strip along Second Street between I and M, which for years has been the home to DC Public School buses. This project was on the boards when I started this site in 2003, and yet has had a hard time getting going, despite a design completed years ago by landscape architects Gustafson, Guthrie, and Nichol Ltd. After originally being under the purview of the defunct Anacostia Waterfront Corporation, the park is now the responsibility of the Office of the Deputy Mayor for Planning and Economic Development.
After spending some time explaining what the heck JDLand.com is ("uhhhh, it's, like, this web site, and stuff?"), I was able to get a general update, which jibes with the rumors that have been flying for weeks. A relocation site for the school buses has indeed been found (though they won't say where), but some construction work has to first be done at this undisclosed location to prepare it. It's expected that the buses will be moved there "by the fall," with construction on the park starting soon after, lasting about 12 months. The park is a "top priority" for the city, I was told.
Will it happen? I guess we shall see....
Comments (0)
More posts: Canal Park
 

A thought: With more than a dozen DC public schools closing at the end of this school year, and the Fenty administration stating that they have no intention of selling off the buildings, wouldn't one or two of them make a good location for a school bus parking lot? Or, at the very least, a better location than some of the locations currently being used?
Comments (0)
More posts: Canal Park
 

This morning's quick hits:
* The Voice of the Hill has posted a piece on its web site surveying the community reaction to the 11th Street Bridges EIS, while the December issue of the Hill Rag looks at the project from the perspective of Hill East.
* The Hill Rag also has a recap of the November ANC 6D meeting, which focused mainly on Southwest issues, though there is a small blurb about the ballpark liquor license (it sounds like there were some concerns about the 8 am to 3 am time frame listed on the application).
* Meanwhile, the December Southwester reports on the Oct. 3 groundbreaking at The Yards by reprinting much of the Forest City press release on the project.
* Out of my realm, but I'll still pass along that the four short-listed development teams will be presenting their proposals for Poplar Point at Dec. 12 at 6:30 pm at Birney Elementary School, 2501 Martin Luther King, Jr., Ave., SE.
* I'm watching with interest a public space permit application this week by Cofeld LLC for 1271 First Street, which is the lot on the northwest corner of First and N, which had a raze permit filed for it in June. Hints of demolition? We'll see if the permit data, when approved, tell us anything further.
* UPDATE: One more quickie to add. The Garfield Park-Canal Park Connector Project has posted notes and summaries of discussions at their Oct. 24 workshop. Topic areas discussed included Biking and Walking, Under the Freeway, Public Art, Urban landscape, and History & Neighborhood Heritage.
 

During my poking around on the DC Office of Cable Television web site recently, I discovered that many of the groundbreakings and other events in Near Southeast this year that have been broadcast on the city's cable channel 16 are also available On Demand; the same goes for council hearings, available on Channel 13's On Demand page. (I kinda sorta knew that the On Demand stuff was there, but when I checked it many moons ago, it didn't seem quite so complete, so I hadn't looked back in on it for a while.)
So if you've missed any of the following four-star telecasts from 2007, you can watch them at your leisure:
* The July bill-signing ceremony at the Earth Conservations Corps pumphouse where the Anacostia Waterfront Corporation and the National Capital Revitalization Corporation were officially abolished;
* JPI's June "groundbreaking" for its four projects along I Street ("Capitol Yards");
* The January groundbreaking marking the start of the Navy Yard Metro renovation and Monument's Half Street project;
* And pretty much any ceremony anywhere in the city the mayor was at since the beginning of the year, plus a lot of other presentations and events. (Be sure not to miss the Reporters' Roundtable "Snitching Debate.") Check the dropdown boxes on the On Demand page for the offerings. I've added the above links to all of the various project pages in case you're desperate to find them again someday.
Two of the most recent shindigs haven't gotten added to the lineup yet--the Oct. 22 kickoff ceremony for the Capitol Riverfront BID (in which you can find out where the "Traveling Roadshow" moniker originated), and the mayor's remarks at the Nov. 13 turf unveiling at the ballpark. Ditto with the Waterside Mall Demolition program, which is currently playing on Channel 16 but hasn't yet made it to On Demand. But perhaps they'll show up eventually.
 

One more reminder that Wednesday night (Oct. 24) there is a public meeting on the project to create a more appealing connection between Garfield Park north of the Southeast Freeway and the to-be-built-hopefully-eventually Canal Park, one block to the freeway's south. The meeting is from 6 to 9 pm at St. Peter's Catholic Church at 2nd and C streets, SE. Here's the project web site, for more information, along with a DDOT press release on the meeting.
More posts: Canal Park
 

I posted about this a few weeks ago, but I'll pass along this DDOT press release from today as a reminder that on October 24 there is a public meeting on the project to create a more appealing connection between Garfield Park north of the Southeast Freeway and the to-be-built-hopefully-eventually Canal Park, one block to the freeway's south. The meeting is from 6 to 9 pm at St. Peter's Catholic Church at 2nd and C streets, SE. Here's the project web site, for more information.
More posts: Canal Park
 
181 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 ... 19
Search JDLand Blog Posts by Date or Category




                  © Copyright 2026 JD.