Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: hotel
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


5 Blog Posts Since 2003

Some stories people have been waiting to hear about for a while:
* MOVIE THEATER MOVING FORWARD: WBJ reports that "D.C. Water, developer Forest City Washington and the District government have settled all outstanding business tied not only to the parcel needed for the long-planned 16-screen, 1,500-seat movie theater, but other sites surrounding it that are similarly planned as part of The Yards."
Forest City should receive the movie theater land in late spring, apparently, with the other residential-planned parcels to come probably over the next five years.

* LERNER BUYS 49 L: The General Services Administration announced this morning that the sale closed on Feb.22 for the one-story brick warehouse on the southeast corner of Half and L, SE.
Property records show that "Half Street Partners, LLC" paid $31 million for the site. And that LLC happens to have a mailing address of 2000 Tower Oaks Blvd., Eighth Floor, which happens to be the address of Lerner Enterprises.
No word yet on the plans for the site, which is (sort of) across the street from Lerner's 20 M office building, and also creates a sort-of Lerner-owned triangle with...

* 1000 SOUTH CAPITOL MOVING FORWARD: Lerner officially announced this week its plans to build the 250-unit 13-story residential building at South Capitol and K that has been working its way through the design and zoning process for the past few years. Designed by Shalom Baranes Associates, it will also have 10,000 square feet of retail along with the lineup of amenities befitting a new "luxury" building--fitness center with Pelotons, private dining room with demonstration kitchen, rooftop pool and entertainment center, and pet spa and bicycle repair offerings for residents. It is expected to get underway late in 2018.
UPDATE: And now we have one more piece of neighborhood news from WBJ today, which is that it has finally been officially announced that the new hotel at 3rd and Tingey in the Yards will be a Thompson boutique hotel.
(Though it must be noted that the WBJ story doesn't seem to quite realize that the hotel is already under construction, in a joint digging-and-building project with Forest City's next residential building, on Parcel L.)
The hotel will have 225 rooms, and the residential building will have about 270 units, and combined the two will have about 24,000 square feet of retail.
 

Last week the DC Zoning Commission gave a unanimous thumbs-up last week to the design review for the first hotel at the Yards, to be constructed on the southwest corner of 3rd and Tingey on the north end of what is known in Yards parlance as "Parcel L."
It will be 10 stories tall, with 227 rooms and about 7,500 square feet of ground-floor retail, plus additional space for a rooftop bar. No operator for the hotel has been publicly announced, but apparently those talks are far along.
The hotel is expected to be completed more or less at the same time as its sibling to the south, the 280ish-unit residential building that first hit the boards a year ago. That building will have about 17,000 square feet of ground-floor retail. The residential building is being developed by Forest City, but the hotel is actually being developed by JW Capital Partners and Geolo Capital.
As part of the construction of these two buildings, a new pedestrian "mews" along what would be the footprint of 2nd Street SE will be constructed, making for an easier and less traffic-y flow between the Yards Park and points north and west.
There will also be a new Tingey Square built at the intersection of N, Tingey, and New Jersey, which should change the traffic flow at that spot considerably.
There's been no official announced timeline on these projects, but the closure on June 1 of the public parking lot on Parcel L might lead one to believe that there is some expectation of work at least on the southern end of the block looming before too long, but I know nothing for sure. UPDATE: I see now that an excavation-only permit was approved for this site recently (looks like they need to run water, sewer, gas, and telecommunications infrastructure to the block), and there is a shorting/sheeting permit application filed for the residential building, which jibes with the estimated 2018 start date that was given last year.
See my Parcel L page (such as it is) for additional details (such as they are).
 

According to the Washington Business Journal, the empty lot on the northeast corner of Half and M is now slated to become a 195-room Homewood Suites Hotel, with a deal having been reached between Hilton and the development group that bought the lot last year.
Back in the pre-ballpark pre-land rush days, a Sunoco station sat on this lot, known as 50 M Street, until 2006, and then the site was bought by Monument Realty in 2007.
The WBJ article says construction could begin on the 11-story building, one block north of Nationals Park, late this year or in 2015, with an opening in 2016. The hotel will have a mix of studio, one- and two-bedroom suites, and about 5,000 square feet of ground-floor retail, which will come in handy with its location directly across the street from the west entrance to the Navy Yard-Ballpark Metro station.
This hotel would join the Courtyard by Marriott at New Jersey and L and the just-getting-started Hampton Inn at 1st and N that is expected to open next year. There is also expected to be another hotel as part of the Ballpark Square development just a few feet north of the Hampton Inn on 1st Street south of M.
Note that this deal does not affect the red brick warehouse just to the north of the empty 50 M lot--that building is owned by the feds and is being salivated over by residents who dream of creating the Half Street Market there.
 

With newish Sigal Construction signs now up on the fences on 1st Street just north of Nats Park acting as confirmation, WBJ reports today that construction is going to start "any day now" on the 168-room Hampton Inn and Suites that was announced a little while back. A shoring/sheeting permit for a portion of the site was approved in late December, though the building permit itself is still in process.
The article says that construction is expected to be completed in the second quarter of 2015--perhaps the lack of underground parking for the project and the shoring permit only for one of the five lots the hotel will be situated on means that there won't be as much digging as one would normally see for a 13-story project, which would speed up the timeline.
This hotel, being developed by the Buccini/Pollin Group, is an L-shaped building that will be wrapping around a separate two-story retail project by Grosvenor right on the northwest corner of 1st and N. And Grosvenor has its own hotel (and a residential building) planned on the same block, just to the north of the Hampton Inn, though no start date has been announced.
The start of this project may be taking some parking away from the far southern end of Nats Lot F, though I have to admit that I'm not 100 percent sure that this portion of the lot was used last season. Rocklands BBQ had set up a food truck during games on the corner lot (where the retail building will go), but I don't remember if more fences went up a little north of that lot or not. Perhaps someone who parks in Lot F as a commuter can help with the timeline.
Confused? Don't worry, it'll all become clear, but perhaps checking out my Square 701 page--which covers the Hampton Inn, and the Grosvenor/Skanska Ballpark Square project--will help.
This is the first non-residential new construction building in the neighborhood since the 1015 Half Street office building was completed in 2011. And it is the second hotel in Near Southeast, joining the Courtyard by Marriott at New Jersey and L that opened in 2006.
Comments (1)
More posts: Development News, hamptoninn, hotel, lhotel
 

Late last week, "Capital Riverfront Hotel LLC" * submitted to the Zoning Commission plans for a 167ish-room hotel on the small L-shaped lot that the Welch family has owned for a number of years at 1st and N Streets just north of Nationals Park.
According to documents submitted as part of the required Capitol Gateway Overlay Review, the development would have no ground-floor retail along either 1st or N.
Also, the developers are requesting that they be able to provide zero below-ground or on-site parking instead of the 44 spaces that would be required by current zoning regulations, saying that the hotel would provide valet parking services, and also would emphasize the building's location near Metro, Circulator, and other transit options.
(Needless to say, it would be interesting to see exactly how valet service on 1st just north of N would work during a sold-out baseball game going on a few feet to the south, given how 1st fills up with traffic heading toward the parking lots at the Yards.)
As seen in the above rendering, the site for the proposed hotel wraps around the two-story retail building that has been proposed as part of its 660,000-square-foot Ballpark Square development that I've written about over the past few months, which would have its own 170ish-unit hotel, positioned between a 224,000-square-foot office building fronting M Street and a 285ish-unit residential building toward the south end of the street, as well as the retail building, separated from the rest by the Welch lot.
Recently "Ballpark Square LLC and SCD Acquisitions LLC" (which appears to be a team headed by Grosvenor, with Skanska and McCaffery Interests also on board) submitted updated designs for that project in advance of its Oct. 1 zoning hearing, in which the residential building just to the north of the L-shaped lot has had its U-shaped design reconfigured to open to the south, giving residents in the courtyard-facing units some amount of a view toward Nats Park. Which of course would completely disappear if the hotel were to be built right up against the property line. (You can compare the white box in the top rendering to the red-brick building at the right of this rendering to place the proposed hotel's location vis-a-vis the residential building.)
The updated filing by Grosvenor et al even gives oblique reference to the goings-on, saying "As will be discussed at the hearing, the Applicant is exploring alternative residential layouts to address the potential future development of the parcel to the south of the residential component."
It does lead one to wonder what if anything might be going on behind the scenes between the two parties. And also exactly how the Zoning Commission might feel about the hotel's designs as initially submitted.
* Points immediately deducted for the wrong spelling of Capitol.
 




                  © Copyright 2024 JD.