Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: 20 M
See JDLand's 20 M Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


52 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6

From GlobeSt.com: "20 M St. SE, a 190,000-sf office building developed by Lerner Enterprises and designed by WDG Architecture, has been awarded LEED Gold certification--the first in the city to achieve this certification level for Core & Shell Development, according to the US Green Building Council. [...] Green features include roofing that reduces heat island effects, plumbing fixtures that reduce water consumption, high-efficiency HVAC systems and humidity control, extensive use of recycled materials and locally manufactured products, low-emitting paints, carpet, adhesives, and sealants, monitoring systems for environmental comfort, advanced stormwater management measures and easy access to public transportation." The blurb also states that 20 M is expected to be 50 percent occupied by the end of the year. But so far, no tenants have been announced. (Although perhaps Wachovia's moves toward opening a branch at 20 M hint toward some tenants coming soon.) 20 M is the big silver building at Half and M, visible to most everyone in the upper decks at the ballpark.
Comments (0)
More posts: 20 M, Retail
 

My retrieval this morning of the DC Building Permits Feed (which has been on vacation for a few weeks) lets the cat out of the bag that Wachovia Bank is preparing to come to the first floor of 20 M Street. For most of 2007 there had been "Coming Soon" signs in the ground floor window of 20 M for both Wachovia and FedEx/Kinkos--when those disappeared earlier this year, there were concerns among observers (read: me) that the two retailers had bailed, but now it does appear that Near Southeast's Bank #2 will be opening before too long. (Bank #3--SunTrust--is expected early next year at 100 M.)
Comments (0)
More posts: 20 M, Retail
 

For months now, I've been dreading this part of 2007, when so many projects would be underway--and it turns out I was right to be worried. Goodness gracious, tons and tons of photos were needed to keep to my perfectionist mandate, but at last I've gotten them up on the site, even though it's pretty much taken a week to get every shot I wanted. For your perusing pleasure:
*The Stadium Exterior Construction Gallery is more updated than it's been in nearly three months, though N Street was unavailable to me this weekend thanks to lots of digging going on. The photos on that page, as well as on the expanded galleries of views along Potomac Avenue, South Capitol, and from the ballpark's viewing platform at First and Potomac show not only the progress on the stadium but also on the streetscape improvements. Sidewalks, curbs, and streetlamps continue to be installed--and the stoplights along South Capitol are gearing up as well (it looks like the P Street light that's now flashing yellow is going to get turned on pretty soon).
* 70 I Street and Onyx are just about topped out, while their siblings 100 I and 100 M aren't far behind. In fact, progress at 70 I is outpacing me so much that within the five days since I took photos of its western side, the bricking of that wall has begun, and is already reaching the second floor in some spots. There's some nice long-distance shots of these projects, from the freeway and the ballpark, highlighting how much the skyline has changed in just a few short weeks.
* Velocity's three-story-deep hole is now getting a concrete floor, which means vertical construction is starting before long. (The crane arrived within the past few days.) And Monument's 55 M Street office building (where the Navy Yard Metro west entrance is being expanded) is poking up above street level, with the first concrete pillars poured along M Street. And it's been hard to get any photos of the work at The Yards, but I finally snagged a few from up on high.
* Plus there's the shots from the top of 20 M Street this morning, including a few panoramic views across Southwest.
If you don't want to plow through all those links above, you can see all the new photos on one page, though it's just a touch overwhelming. (Yes, even I know it's overwhelming.) But the project links above (and their expanded archives) are really worth it, because the scope of the changes is now so amazing. So click on a or two to watch the progression.
And now I will rest myself and my camera for a while. Hope you enjoy the photos.
 

Today's print edition of the Washington Business Journal has an article summing up what's going on right now with various commercial projects around Near Southeast. (The online article is for subscribers only for the first 30 days; sorry.) Here are the new items:
* William C. Smith is planning to hold off breaking ground on its 200,000-sq-ft building at 250 M Street until it pre-leases at least 30% of the building.
* Opus East has leased 80,000 sq ft at 100 M Street (33% of the building) to government contractor Parsons Corp.
* Lerner's 20 M Street does not as yet have any office tenants.
* It also mentions that Opus East is planning to build the 440,000-sq-ft office building at 1015 Half Street (the old Nation site) on spec; but it should be noted that Opus hasn't yet officially announced its purchase of this property or its plans.
(The article also summarizes what's going on at Florida Rock, using some source materials that are hard to find anywhere other than here at JDLand. Note to reporters and other professionals using my site: yup, lots of stuff is posted here, and it's all free, but be a grownup and say where you found it.)
In addition, there's an ad in the print edition giving us our first peek at the Shalom Baranes design for 1100 South Capitol Street, Ruben Companies's planned 350,000 sq ft office building on the southeast corner of South Capitol and L. There's currently no timeline for development of this project.
The print edition also has a piece written by GSA about the US Department of Transportation completing its move to its new headquarters at New Jersey and M. It describes the HQ's interiors and exteriors, and mentions that this project is the largest lease ever executed in DC.

 

I gave you inside-the-ballpark photos on Monday, and today there's a new set of exterior shots of the Nationals baseball stadium (note that I've now separated the interior and exterior stadium photo galleries into separate tabs). Remember that clicking on the Click to see all available photos of this location. icon will show you all uploaded photos of that angle, not just the oldest and newest (so you can watch the stadium construction change in two-week intervals). I also "freshened" the Photo Archive's database of photos at all the intersections around the perimeter of the stadium, giving you additional viewpoints not shown in the Construction Gallery: check out 1st Steet at N, N Place, O, and Potomac; Half Street at N and Potomac; and South Capitol Street at N, O, P, and Potomac. (You can also browse the archive by map to pick and choose locations.)
I also did what is probably the final major photo update for 20 M Street, and updated some other intersections as well--Half and M, Cushing and M (both of which are part of the Monument Half Street footprint); Cushing and L; and 1st and M and 1st and L, home of the construction sites for 100 M Street and Onyx on First, which each got updated as well, although the pictures aren't particularly exciting (still just a big hole in the ground). Or you could just look at all the photos I took today, then click on the intersection link if you want to see previous photos.
And now, I must go watch my Gators.

 

From today's print edition of the Washington Business Journal: "CNN and a couple of law firms are sampling the wares in Southeast DC by taking tours of new office buildings cropping up around the new baseball stadium. No leases have been signed yet, but the buzz of these high-profile tenants looking at Southeast as an option is quite a victory for a neighborhood formerly known as an industrial zone crawling with seediness and crime. [...] Also, rents in Southeast are expected to be around $40 per square foot for full service, $20 to $30 cheaper than new or renovated buildings in the Central Business District." Of course, right now, "tours of new office buildings" means 20 M Street, the only new office building currently completed and with plenty of space to lease. But by 2009 there will also be 100 M, 55 M, and probably 250 M and 1111 New Jersey. And maybe a couple more, depending on what happens within the next few months at Square 699N, Square 697 (Nation), and the Willco site at 83 M. (The article fudges a bit by mentioning 1.8 million square feet of office space was under construction in Near Southeast back in December, but, well, 1.35 million of that was the DOT HQ.) UPDATE: Added the link to the story, since WBJ was nice enough to bring it out from behind the pay wall.
 

From the Examiner: "The District of Columbia could get its first gold-rated 'green' building courtesy of Washington Nationals owner Ted Lerner, the family announced Wednesday. The 190,000-square-foot office building, located at 20 M St. SE near the under-construction Nationals baseball stadium, was constructed to match the U.S. Green Building Council's Leadership in Energy and Environmental Design Gold standards for environmentally friendly buildings. The building, the first built under Lerner Enterprises' Green Initiative Program, will be submitted for certification from the Building Council, officials announced. Projects are awarded certified, silver, gold or platinum certification depending on the number of credits buildings receive under the Building Council's grading system. The Lerners have endured criticism from some environmental activists for not including enough green materials in the new Nationals stadium."
More posts: 20 M
 

Word has coming pouring in this afternoon from various boots on the ground (we'll give co-credit to readers Frank and Dave) that a sign announcing "Coming Soon - FedEx/Kinkos" has appeared in the window just to the left of the 20 M Street entrance (as they once again wait until I am just out of sight to hang the advertisement). Those who are hoping for a restaurant will have to continue to keep their fingers crossed.

More posts: 20 M, Retail
 

I gave you new stadium, Monument Half Street, and 20 M photos yesterday; today I've posted new Community Center and DOT HQ shots, including some pretty neat ones of the new New Jersey Ave. and Tingey Street intersection (amazing what bright sunlight can do for a bunch of buildings and fresh asphalt!). I also added to the 20 M page new shots of the festive scrolling information sign they've installed over the main entrance, as well as the "Coming Soon - Wachovia" sign that I missed by minutes when taking my pictures on Sunday. You can also see on one page all the photos from yesterday and today that I've posted.
 

Still working my way through the pile of pictures I took today.... New shots posted of the ongoing work at the Monument Half Street site, and also some "substantially complete" shots of 20 M Street--in a couple photos you can see men working on the far left window on M Street, and a reader gave me a heads up that not more than a few minutes after I came through, they posted a sign saying "Wachovia Coming Soon." So, if that's indeed the case, that would be the first 20 M tenant we've heard of.
 
52 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6