Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: meetings
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


194 Blog Posts Since 2003
Go to Page: 1 | ... 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20
Search JDLand Blog Posts by Date or Category

Between it being Friday and the sun finally being out, I bet everyone's feeling a bit better today. Maybe even Biking to Work! So, a few tidbits:
* The latest Capitol Riverfront BID newsletter is out, with a few items of note. First off, there's a new "branding" campaign going on--"Be Out Front." Look for signs promoting "Front Yard," "Front Office," "Front Door," "Store Front," etc. And they'll soon be launching an equally rebranded web site.
Also, the current estimated population within the BID is 1,584 residents; the newsletter says that there are now more than 2,000 residential units, more than half of which are leased/sold and occupied.
The newsletter also gives the Bullpen's official opening date as May 15, and also mentions that the weekly Tuesday farmer's market at USDOT is now underway, and that the weekly Wednesday lunchtime concerts start on May 20.
* The agenda for Monday's ANC 6D meeting is out (hopefully it'll show up online before the meeting itself), and the only Near Southeast item is a presentation by Michael Stevens of the BID--kind of a BID 101 tutorial for the ANC commissioners. Otherwise, it's voting on marathons, bus stops, after-school programs, and also an announcement of a "Southwest Night" at Ft. McNair on July 1. The meeting is at 6th and M streets, SW, at 7 pm. (Maybe next month it'll finally move to the new digs at the new 1D police station at the former Bowen Elementary.)
* The Examiner reports that the 2010 federal budget includes $15 million for "Southeast Federal Center remediation." There's certainly been piles of environmental cleanup there over the years (not surprising when it used to be blocks and blocks of munitions factories).
* EYA has spiffed up its web site a bit--their Capitol Quarter page is worth a visit if you haven't checked it out before.
 

On Monday night, a surprisingly contentious Zoning Commission meeting resulted in the three voting members approving a delay in the deadline for the Housing Authority to file for building permits for the proposed Capper Community Center; however, after some heated exchanges between commissioners, it was decided to vote not for the DCHA's requested deadline of Jan. 1, 2011, but instead a shorter deadline of July 1, 2010.
Commissioner May argued that DCHA had not made a compelling case for why the center isn't going forward, and that the discussion at the March hearing (transcript here, my description here, and a letter from ANC 6D about it all here) on the extension "resonated" with him, and he recalled that the community center was one of the prime benefits for residents when the original Capper PUD was approved. Jeffries, as frustrated and blunt as I've seen him (probably because his term is about to end), said repeatedly that "the world is a different place now," that the developers needed to be given some flexibility to get things done, and that it was not the place of the commission to "be punitive" given the current economic conidtions. Chairman Hood attempted to find middle ground between the two (which begat Jeffries curtly telling Hood "this is a time when you're going to have to take a side"), although in the end all three voted for the July 2010 deadline.
Representatives of the Housing Authority said they'd be trying their best to meet that deadline, but with the difficulties of finding funding for the project, they might very well be returning to request an extension of that July 2010 deadline.
The other requests, including an overall extension of the PUD deadline to Dec. 31, 2013 and a bunch of other items I can't bring myself to write about again, were approved with far less sturm und drang.
Comments (0)
More posts: Capper, Community Center, meetings, zoning
 

The latest Capitol Riverfront Connections newsletter from the BID was sent out late last week, with updates on the LEED for Homes plaque presentation last week at Capitol Quarter, an interview with BID executive director Michael Stevens on Newschannel8, and news of a ceremony coming tomorrow (Monday) at 2 pm on the Tingey Plaza at USDOT, where Mayor Fenty will kick off the launch of 28 new artistic bike racks around the city.
Also on Monday, at 6:30 pm, is a Zoning Commission hearing where a first vote could possibly come on the batch of zoning changes being requested for Capper/Carrollsburg to which I've dedicated so many bytes lately.
And, on Tuesday morning at 8:30 am is a dedication ceremony and breakfast fundraiser (also with the mayor) for Diamond Teague Park, being held across the street at the foot of the stadium's grand staircase. Tickets are $50 per person.
 

At Monday night's meeting, ANC 6D voted 6-0-1 to approve a letter drafted by commissioners McBee and Siegel responding to submissions by the Housing Authority in the wake of the marathon March 20 zoning commission hearing on the various modifications and extensions being requested for the Capper PUD. As I wrote on the 20th, there was much discussion about DCHA's request to delay construction of the planned community center until at least 2011, and there was also testimony by two former Capper residents that DCHA isn't adhering to what the 2004 zoning order requires in terms of job training and other social services for the former Capper residents.
The letter ANC 6D is now forwarding to the Zoning Commission can be read here, and it addresses in detail the Community Support Services Program (CSSP) and the community center. The DCHA numbers quoted in the ANC letter show an initial CSSP case load since 2005 of 828 cases, with only 394 cases now active due to residents declining to participate, being declared ineligible, or having gone "missing." The letter also says that no further funding for the CSSP program is forthcoming from HUD, and says that the numbers provided by DCHA "do not paint a good picture for a Hope VI Project whose main objective is sustainability and empowerment for the effected community."
As for the community center planned for Fifth and K, the ANC says that its delay "has already done sufficient damage" and that its absence "will fail to address the social and educational needs of the residents." The ANC also notes a lack of any mention of the center in various testimonies by DCHA on their budget and on stimulus dollars coming to the city, saying "we now have no confidence [...] that the Center will ever be built."
The Zoning Commission's next hearing on these Capper doings is expected to be on April 27.
 

Tonight ANC 6D gave its support to a plan for "Festival Park on Half Street," a 14,000-square-foot combination food, drink, and activity space on the northwest corner of Half and N streets, on land owned by Akridge directly across from Nationals Park.
This is the "beer garden" that caused a bit of a stir last week, and representatives of Akridge, Georgetown Events, and Headfirst Sports were on hand to explain their concept to the ANC. A document handed out describes it as a space with "a large tent that will include a beverage station, a temporary stage for live music, porta johns, tables with seating, possible baseball netting cages for live instruction, and a children's activity area." It would be open on game days beginning three hours before game time and ending two hours after (or before midnight regardless of whether the game is over). The newly erected 12-foot-high wooden fence would surround the site, with one entrance where IDs will be checked and bracelets given to those 21 and older, with up to 12 security employees on hand. There would be food from third-party vendors as well as Georgetown Events' own restaurants (Surfside, Jetties, and the Rookery). There's also the possibility of activities in the space (such as farmers' markets or other events) on non-gamedays, though the lease for the space ends at the beginning of November.
Headfirst Sports (named by Sports Illustrated for Kids as the "Best Summer Camp in the Entire Washington Area") is planning to run in the park a "variety of games, contests, and competitions as well as small clinic and group instruction aimed at teaching young Nationals fans how to play and love baseball and softball." The operator of Headfirst also made clear his interest in working with youth groups from the neighborhood in sessions apart from the gameday activities.
The ANC commissioners were supportive of the plans, although they had a lot of questions (too bad you all missed the long discussion of whether the phrase "frozen drinks" is a legal term), and 6D07 commissioner Bob Siegel complimented the group, saying "you convinced us that this is going to possibly work." Some specifics still need to be hammered out in the "voluntary agreement" that Georgetown Events is entering into with the ANC, but the commissioners voted 7-0 to support the group's application for a "Tavern" liquor license. An April 30-May 1 opening date is being targeted, but there is still city bureaucracy to contend with.
As for the Akridge site, baseball fans heading to the ballpark today were met with a slew of new signage on the west side of Half Street advertising "Akridge at Half Street"--the new web site shows some of the art on the signs, and I also took a few photos of the fences and put them on my Akridge Half Street page, though the skies were so gloomy that I couldn't bring myself to post the complete set. There's a spot where local artists will be creating works right on the fence, and there is also a chalkboard where passers-by can write messages, as many did today.
UPDATE: Some additional details on the plans from WBJ.
 

The agenda for the April 13 ANC 6D meeting has been mailed out (though isn't yet posted online), and one of the items is "Akridge Realty Beer Garden"--apparently they are looking to have a summertime offering on their land at Half and N, across from the ballpark. I presume it would just be on game nights, though I don't know for sure, and don't know anymore than what I've written here. More as I get it....
Comments (0)
More posts: West Half St., ANC News, Fairgrounds/Bullpen, meetings
 

How can I possibly summarize in this small space the never-ending parade of testimony and questions at last night's hearing on the various Capper zoning modification requests? (I just thank the heavens I watched the web cast and didn't attend in person.) If you didn't avail yourself of this entertainment, you'll just have to wait for the transcript to come out to get all the specifics, but here's a few bullet points on issues that were brought up (read the Office of Planning report on what was actually being requested):
* Commissioner May was displeased that there were no "sample boards" of the exterior finishes for the two new apartment buildings, as is apparently required for a stage 2 planned-unit-development approval.
* The commissioners were clearly befuddled by the scope of the requests, variances, and exceptions before them, even though last year they had requested that the three separate filings be grouped together in a single hearing.
* There was much discussion of the request to further delay the construction of the community center until at least 2011, with the Housing Authority testifying at length as to the financial realities of the bond and lending markets (see more about that here), and members of the public and ANC commissioners (Siegel and McBee of 6D) emphasizing as they have in the past "the community's" need for the center and questioning DCHA's idea that the neighborhood needs to reach a "critical mass" before the center should be built (does 300 completed units out of a planned 1700 meet that threshold?). DCHA said repeatedly that building a community center is a promise they have made that will not be broken, but that right now it's just not a possibility.
* Two former Capper residents testified to their belief that the Housing Authority is not adhering to what's required in terms of job training and other social services that are supposed to be provided while residents are waiting to move back, which got chair Anthony Hood into a bit of a dander. (Read pages 12-14 of the 2004 Capper zoning order to see what is expected in this realm.) This and the other public comments (such as the "why can't you use Obama's stimulus money?" question that had come up at ANC 6D) brought a somewhat forceful response from David Cortiella of the Housing Authority as to what they're doing for the former residents, and he again went through the current barriers to financing the center. There was then a minor dustup between commissioners Jeffries and May, with May pressing the housing authority on its performance and timeline and Jeffries expressing some level of surprise that the zoning commission was questioning a Hope VI redevelopment's financial problems "in this economic climate."
By the time the hearing wrapped up at 11:15 pm (and I'd be lying if I said I had paid attention to every word), the commission was requesting a series of additional filings from the housing authority and its team, and put it all on their April 27 agenda. (And look for this to be back on the ANC 6D agenda on April 13, too.)
Comments (0)
More posts: ANC News, Capper, meetings, zoning
 

I've just about reached my recommended yearly allowance of writing about the various Capper zoning requests that are pending right now, but there's a light at the end of the tunnel, since the hearing is finally being held Thursday night at 6:30 pm. If you've grown tired (as I have) of my haphazard attempts to describe exactly what's being requested, you can now pour through the Office of Planning report, which gives far more detail than I've ever attempted. Even if you don't want to know that much about it all, there's a pretty good map on page three of the report that details the plans for every block of Capper/Carrollsburg (though without any timelines for the future projects). I have a similar map on my main Capper page, but this one does add a lot of detail.
I've also managed to snag the first renderings of two of the planned Capper apartment buildings, which I've added to my project page. One (seen at top left) shows the 171-unit building planned for L Street, next to Canal Park and behind the proposed 250 M Street office building. There's also now a first look at the 189-unit building planned for the 600 block of L Street (seen above), on the north side of the old Capper Seniors lot and just south of the Marine Bachelor Enlisted Quarters. In the original Capper plans, this site was going to be townhouses, but it was decided that an apartment building would fit in better with the larger surrounding structures.
The Thursday hearing will be available via live web cast, if you're so inclined.
 

I can't hardly bring myself to write about the Capper PUD modification requests *again* (my first post on them was back in July), so I'll just stick to the basics and say that on Monday night ANC 6D voted to support the three requests, with provisos that the Zoning Commission request the start date for construction of the community center be in 2011 and not 2012 and that the Housing Authority provide *50* parking spaces in the lot at 7th and M for health-care workers who visit the Capper Seniors #1 apartment building, where apparently there is trouble with parking (according to commissioner Robert Siegel, who lives across the street). The delay on the community center was again a major sticking point (just as it was at the February meeting where these requests were also presented, giving Monday night a very Groundhog Day feel), and the Housing Authority representatives again explained that the center must be financed with bonds, which are all but impossible to "float" these days given the economic realities. (The bonds that eventually pay for the community center will also pay for the demolition of the trash transfer station and the other infrastructure work needed on the western edge of the Capper footprint, around Canal Park.) Cries of "but what about the Obama stimulus money?" also were left unsatisfied. But, in the end, with the extra wording proposed by Commissioner Sobelsohn and approved by Siegel, the resolution passed.
The Zoning Commission will have its hearing on these three requests on March 19. Read my February or July postings for all the specifics. And I hope to at some point get renderings of the apartment buildings planned for L Street between Second and Third and between Sixth and Seventh (hint, hint).
Comments (0)
More posts: ANC News, Capper, meetings, zoning
 

The agenda has been sent out (though not yet posted) for Monday's ANC 6D meeting, at 7 pm at St. Augustine's church at 6th and M streets, SW. The only Near Southeast item on the agenda is a vote on the three zoning PUD modifications being sought for the Capper/Carrollsburg redevelopment--they were presented to the ANC back in February, which you can read about here. Other agenda items include updates on the Waterside Mall redevelopment and the Southwest Zoning Planning process, the SunTrust marathon, the proposals for the new firehouse at 4th and School, SW, and the job fair held in Southwest earlier this week for employment at Nationals Park.
 
194 Posts:
Go to Page: 1 | ... 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20
Search JDLand Blog Posts by Date or Category




                  © Copyright 2024 JD.