Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Capitol Hill Tower
See JDLand's Capitol Hill Tower Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


51 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6

Getting to be a busy time of photo-taking, so I've added a smattering of photos here and there to my Capper/Carrollsburg, JPI Residentials, Capitol Hill Tower, DOT HQ, New Jersey Avenue, M Street, and new baseball stadium pages. Let the icon be your guide. With demolition continuing at Capper and JPI's 70 I Street, I expect to be updating those pages steadily over the next few weeks. (They appear to be moving more quickly with the Capper demolition at 3rd, 4th, K, and L, and I expect the block to the north, between 3rd, 4th, K, and I, to be next to come down.) And starting soon I'll be updating 20 M Street much more frequently, with the tower's construction finally coming up out of the hole and above ground level. And then there'll be that stadium demolition and construction....
More posts: 70/100 I, Capper, Capitol Hill Tower, US Dept. of Transportation HQ, jpi, New Jersey Ave.
 

With some demolition now underway (veeeeery slooooowly), I've freshened up my Capper/Carrollsburg page with some new photos. I've also updated the construction photos for the two Capper Seniors projects, and for good measure tossed in a couple of new shots on the Capitol Hill Tower page, to celebrate the opening of the Courtyard by Marriott, the first Near Southeast project I've tracked from its beginning to end....
 

I had heard rumblings that this would be the case, but a reader has now confirmed that the Courtyard by Marriott at New Jersey and L has opened today. For folks who work nearby, the Marriott will serve breakfast, lunch, and dinner to the public as well as guests, and the bar will be open to all, too. As for the residential side of Capitol Hill Tower, folks who have already bought units are being given late April/early May move-in dates....
More posts: Capitol Hill Tower, Courtyard/Marriott
 

Using all the power and pull I have at my disposal ("Uh, yeah, hi, I have this blog, and I was wondering... Hello? Hello?"), I got a sneak-preview today of the not-quite-yet-finished Courtyard by Marriott hotel at New Jersey and L. It's still a few weeks away from the grand opening, but they do have some of the rooms ready for showing, and I snapped a few photos of them, as well as a few shots of the still-under-construction outdoor courtyard space of the residential side of Capitol Hill Tower (scroll a bit down my CapTower page to see the new shots). The hotel has 200-plus rooms, meeting space, a pool and fitness center, a bar, and a small restaurant area that will offer breakfast, lunch, and dinner to not only guests but the public as well. If you ever want to stay there, sacrifice a bit of space and ask for one of the upper-floor rooms on the New Jersey Avenue corner--they have a wall of windows with unreal views to the west, at least until all the other Near Southeast projects get off the ground.
More posts: Capitol Hill Tower, Courtyard/Marriott
 

In addition to the pictures I posted earlier from the site of the new baseball stadium, there's also new pictures now on my Capitol Hill Tower, DOT HQ, and 20 M Street pages. I've also got a few new shots and some additional information on the project at 801 Virginia Ave. (if you've been past there, you may have noticed that the buildings on the lot have been demolished.)
More posts: 20 M, 801va, Capitol Hill Tower, US Dept. of Transportation HQ, 8th Street
 

Marriott's web site now has a page for the "Courtyard by Marriott Washington Capitol Hill/Navy Yard", and the page says "Opening in March 2006." You can't reserve a room yet, but at least it's there now. See my Capitol Hill Tower page for photos, detail, etc.

More posts: Capitol Hill Tower, Courtyard/Marriott
 

Couldn't help myself, had to go take more pictures in the Hood, so check out my Capitol Hill Tower, New Jersey Avenue, and especially my DOT HQ pages for new images--I ventured out after construction was finished for the day, but they hadn't closed the gates to DOT at New Jersey and M, and now that there's a nice concrete road bed, I took my first walk from M to N on the "new New Jersey." And didn't even get arrested! I also added a photo or two to my Capper Seniors page, mainly to document that they have sped along with the bricking the southern exterior of Capper #1.
 

There's now a sign on Capitol Hill Tower, just south of the New Jersey and K intersection, that says "Sales Office Now Open." I haven't walked up to be sure, but if you're interested in the project, wander by and see if you can go in....
More posts: Capitol Hill Tower
 

I'm not sure many readers have ever had the strength to scroll all the way to the bottom of my Near Southeast home page, so many of you might have missed the goofy little "slide shows" I had there showing the construction progress at Capitol Hill Tower and DOT HQ. But since the home page has gotten unbearably huge, I decided to now just show a random one each time you load the home page, but I've also created a  Construction Slide Shows page to give them their own space. A random one comes up each time you load the page, then you can click on the links to choose another. And I've also added a new one, for Capper Seniors #1. Meanwhile, in other site news, if you've visited in the past week or so you've probably noticed the slight design change, with navigation links and ads now running down the right-hand side of the page, instead of taking up precious real estate in the main portion of the pages. And perhaps now having the list of Near Southeast pages visible (instead of in dropdown boxes) will make roaming the site easier. Or scarier, if you're alarmed by exactly how much is here. UPDATE: And I added a Blog Archive list of links, allowing you to go back through my posts month-by-month, if you are ever so inclined.

 

It's a beautiful sunny day, so I went on a photo expedition. (Except that trying to take pictures toward the south at this time of year is almost impossible, no matter what time of day.) Check for new photos on my DOT HQ, Capitol Hill Tower, Capper Seniors, Florida Rock, M Street, and 20 M pages. As always, the  icon is your guide.
 
51 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6