Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: zoning
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


302 Blog Posts Since 2003
Go to Page: 1 | ... 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 ... 31
Search JDLand Blog Posts by Date or Category

Tomorrow (Monday) night is a big Zoning Commission meeting, with votes expected on both the Florida Rock second-stage PUD and the Monument Realty/Half Street project (The 250 M Street vote has been put off again.) This is available on live webcast if you're so inclined. If the projects are approved, there's then a public comment period before a final approval vote a few weeks down the road.
Also, the Anacostia Waterfront Corporation has just announced a Tuesday meeting "to consider resolutions regarding development agreements with the JBG Companies and the Government of the District of Columbia related to the implementation of a PILOT agreement for the new US Department of Transportation Headquarters"--no, I can't really tell you what this means. The meeting can be listened to via teleconference (call 877-529-9893 and enter access code 800). See my Calendar of Events for times and locations.
 

Today's Washington Business Journal has a piece (subscribers only for 30 days) detailing the arduous journey of the 1.1-million-sq-ft Florida Rock project over the years (which JDLand readers are intimately familiar with already!): "Finally, its time has come. At least that's what developers of 100 Potomac Ave. SE -- which is along the Anacostia River and smack across the street from the new baseball stadium being built -- are hoping. FRP Development of Sparks, Md. started the redevelop process for the 5.8-acre site more than a decade ago. And now is waiting a final decision on the project plan from the District Zoning Commission Feb. 12. If approved, the plan would go to the National Capital Planning Commission review and come back for final action in April. It also would finalize one of the integral pieces of the Anacostia waterfront redevelopment, which has been one of the city's goals for decades. [...] The plan, as it is now, is for development of 1.1 million square feet spread over four buildings: 600,000 square feet office, more than 60,000 square feet retail, 160 apartment units and a 235-room hotel, all with 1,087 below-ground parking spots. In addition, the project will be set back 75 feet from the waterfront and will have a river walk that would provide public access to the river. " As for a timeline? "If the approval goes through, FRP Development will start work on the office/retail buildings on the eastern side and closer to the ballpark first, which could be as soon as next year, Briggs says. The rest of the project would be a phased development that could take another 10 years to build out because construction of the third and fourth buildings would have to wait until the District completes building the new [Frederick Douglass] bridge." You can see renderings and drawings on my Florida Rock page (with updated ones hopefully coming soon).
More posts: Florida Rock, zoning
 

The architects of the Florida Rock project (Davis Buckley Architects and Planners) have generously passed along an updated "map" showing the layout of the 5.8-acre site that sits between the Nationals ballpark and the Anacostia River. The project will have 600,000 sq ft office space, 92,000 sq ft retail, 160 residential units, and a 235-room hotel, spread across four buildings. There will also be a waterfront esplanade, and the eastern edge of the site (where a big portion of the retail will be located on multiple glassed-in floors) will be the western border of the new 39,000-sq-ft First Street Plaza that the Anacostia Waterfront Corporation is planning for the foot of First Street. The Zoning Commission is scheduled to vote on the Florida Rock second-stage PUD on Feb. 12; the project would take a number of years to be completed, but hopes are that construction would begin on the eastern portion in early 2008. And stay tuned, there hopefully will be new renderings of the buildings themselves within the next few weeks.

More posts: Florida Rock, Teague Park, zoning
 

I've now posted PDFs of some of the Monument Realty submissions to the Zoning Commission for the January 11 public hearing on their Half Street/Ballpark District mixed-use project: you can grab yourself a really large, strong cup of coffee and peruse the opening statement (1 MB), the traffic study (3.7 MB, which I linked to a few days ago) or the architectural drawings (13.7 MB). I've also snagged the best of the renderings and added them to my Monument Half Street page. It's expected that the Zoning Commission will vote on this project at its February 12 public meeting, when zoning approval votes are also expected on the 250 M Street and Florida Rock projects. UPDATE: For those who aren't well-versed in the zoning process, I should emphasize that these are the submittal documents--at the public hearings, zoning commissioners ask questions and request clarifications and sometimes modifications, and so what will be voted on isn't necessarily what's seen here. But it's better than nothing!
 

Thursday night was the Zoning Commission hearing (if you could figure out their calendar to find that out) for Monument Realty's big mixed-use project on Half Street just north of the Nationals ballpark. The webcast started late, and was without audio for a bit, so I missed the beginning, but did manage to see and hear the presentation of the designs. (Bear with me, this will be a long entry, but I know there's much interest in this project.)
I managed to get a few images of the project renderings, which ain't easy over a grainy webcast (I won't divulge my secret method), so be prepared that they have a rather impressionistic 1930s watercolor look to them that isn't necessarily what they're really going to look like. Go to my Monument Half Street page for not only the renderings (not the one at the top of the page, the others further down) but also an updated map that shows how the buildings are laid out.
As expected, the 275,000-sq-ft office building is at Half and M, and will incorporate on its ground floor a renovated entrance to the Navy Yard Metro station, which will have large opaque mesh screens with LED lighting to avoid the huge black holes of space that are often seen when buildings sit atop Metro entrances (I think they also need the extra wall space that the screens provide, because the farecard machines and turnstiles will all be on the street level, not down in the station). These will be able to project lights and images and will no doubt be a big focal point.
As you walk south toward the stadium, you would then come to a new street about a third of the way down Half, which they're calling "Monument Street." This would provide a cut-through to Cushing Street (and eventually perhaps to First, Van, and South Capitol as well), and is also being used as a design feature to break up what is currently a 600-foot-long block; and creating it also allows for additional high-value corner retail spaces than if the block weren't broken up.
Monument Street will also be the location of the entrance to the 200-room W Aloft hotel, which has only a small frontage on Half Street but then runs in an inverted L across Monument Street and down Cushing Street. Running the rest of the length of Half Street would be a condominium building, which at the corner of Half and N would then meet a rental apartment building that faces the stadium across N Street between Half and Cushing (which as part of this project will be extended through to N Street). The two residential buildings will contain in the neighborhood of 320 units, and there will be a courtyard nestled between the residential and hotel buildings parallel to Half Street. Three levels of underground parking will provide about 520 spaces, and will be entered via Cushing Street.
The ground floors of all of these spaces will be almost completely taken up with retail (except for the entrance to the Metro station and small entrances that lead visitors to the second-floor lobbies of each building), and there will be a mixture of one- and two-level retail spaces. The two-level space at Half and N, directly across from the stadium, is considered to be the most prime location. There will also be a viewing platform above that retail space for residents to be able to look into the stadium.
It is anticipated that Half Street will be closed to vehicular traffic on game days (as will be N Street between Van and 1st), and because of this the design of Half Street is much more like a pedestrian plaza, with no actual curbs but using various landscape and streetscape tricks of the trade to delineate car space versus sidewalk space.
The plan is to start construction as soon as possible (in fact a Building Permit Application for 55 M Street was filed earlier this week), working from north to south, so that the office building would be finished first (Q2 2009) and then the southern portion of the site would come online in Q3 2009. Earlier comments about perhaps getting the underground parking and some of the retail completed by Opening Day 2008 seem to have gone by the wayside, as it was mentioned that the garages and retail would start to open in Spring 2009. Of course, the Navy Yard station expansion (which Monument is overseeing as well) must be done by Opening Day 2008.
As for the hearing itself, commissioners were a bit divided, some hating Monument Street and others liking it, some not being happy with a second-floor hotel lobby while others were more concerned about having as much retail on the ground floor as possible. They were happy to hear that there is no more parking than the minimum required by law, as apparently the commission feels strongly about not having an overabundance of parking right above a Metro station.
The Office of Planning and the Anacostia Waterfront Corporation both are supporting the application, though OP indicated there is still some work to be done to address their concerns. Also there apparently was a letter from DDOT detailing an almost comically long list of items that they'd like to see incorporated. Monument and DDOT are still needing to meet to discuss those, as well as the streetscape and lighting designs.
Monument indicated that it is needing to move forward with all deliberate haste (especially given the cast-in-stone deadline of getting the Metro station ready by April 2008), and in fact they asked to have the ZC vote on approval be scheduled for Feb. 12. There were a number of issues that the commissioners asked to have addressed in additional submittals, so there will be some midnight oil burned to meet that Feb. 12 date. But I didn't get the feeling that the commission was particularly negative about the project, and certainly weren't hostile. (I'm skipping the minutiae of requested exceptions and reliefs, if that's of great interest to you, you should have watched your own self!)
Worn out yet? Imagine how I feel having had to watch it all! But soothe your soul by going to look at the cruddy versions of the renderings I've posted, and hopefully before long the Gods will smile on me and send me real purty versions of the images I can use instead.
 

News from last night's ANC 6D and Zoning Commission meetings:
ANC 6D and Monument Realty finally reached an agreement on a community benefits package as part of Monument's request for support for its 55 M Street mixed-use project; in it, Monument agrees to a) give preference to ANC 6D residents in the lottery for the project's affordable housing units, b) make a $50,000 donation to be shared between Jefferson and Amidon schools, and c) make a $10,000 donation to a local scholarship fund. There was some grumbling from the audience that Bowden Elementary was left out, but the commissioners made assurances that with all the other projects coming down the ANC 6D pike, Bowden will not be forgotten. With the benefits agreement reached, the ANC then voted to support Monument's zoning review this Thursday night.
At the Zoning Commission meeting, the planned vote on the Florida Rock 2nd Stage PUD was delayed until next month. There were also three votes on amendments to the Capitol Gateway Zoning Overlay: Case 06-25, expanding the Overlay boundaries, was approved and sent onto the National Capital Planning Commission, with final ZC action probably coming in the spring; and final approvals were given to Case 05-10 (a series of additions and amendments to the Overlay) and Case 06-20 (an amendment officially allowing the WMATA bus lot formerly at Half and O to be moved to Buzzards Point).
And thankfully none of this prevented me from watching my Gators destroy Ohio State! That was the best part of all!

 

Just a small heads up to highlight some Near Southeast items on this week's calendar: on Monday (Nov. 8), ANC 6D is having its monthly meeting (now at St. Augustine's Episcopal Church at 8th 6th and M SW). The agenda has not yet been posted, but I do hear that the continuing fight over the Monument Realty request for support for its alley closings at Half and M is again on the schedule--which is kind of interesting, given that the alley closings became law back in December; there are mumblings I guess about holding up Monument's zoning application, but who knows what's actually going to happen. Also on Monday night is a Zoning Commission meeting, where the vote on the Florida Rock 2nd Stage PUD is scheduled to be held. (Note that the vote on the 250 M Street PUD/Overlay Review was originally scheduled for this meeting, but has been delayed to Feb. 12.) And then, rounding out the week's zoning festivities, Monument will present its Half Street office/hotel/residential project to the ZC on Thursday evening. Note that both the Monday and Thursday ZC meetings are available via live webcast; I may actually be watching Monday's ZC webcast on my PDA while attending the ANC meeting, which is just wrong on so many levels. And, to make it worse, these two meetings will no doubt require me to time-shift my watching of the Ohio State-Florida game, so no one spoil the result for me (Go Gators! UF '87). The sacrifices I make.... UPDATE: Oops, forgot to mention that tonight's (Jan. 8) Zoning meeting is also scheduled to include votes on proposed text amendments to the Capitol Gateway Overlay (cases 05-10 and 06-25).
 

Adding to the projects that look to be starting in 2007, it appears that the 1111 New Jersey Avenue office building being developed by Donohoe is moving forward--they've recently applied for a zoning special exception ("for a waiver of the rear yard requirement"), which has been added to the Bureau of Zoning Adjustment's May 8 agenda. This is slated to be a 146,000-sq-ft, 12-story project with ground-floor retail, and I've heard tell that they're planning a mid-2007 start date. It will be on the land between the Navy Yard Metro station entrance at New Jersey and M and St. Matthew's Baptist Church at L Street (St. Matthew's is not being demolished)--and no, it won't be built up on the grassy hill, they'll dig down to street level! This will make the third project underway on what is known as Square 743N, along with the 100 M Street office building and the Onyx on First residential tower on the other side of the block, along 1st Street.

 

With thanks to the many eagle-eyed correspondents who passed this along, we can report that demolition has begun at 55 M Street, the southeastern corner of Half and M, currently home to the western Navy Yard Metro Station entrance and soon to be home to Monument Realty's first offerings in Near Southeast--a 275,000 sq ft office building at Half and M, a 200-key W Aloft hotel mid-block, and 350-unit residential tower at Half and N, with 50,000 sq ft of ground-floor retail throughout the project. I talked to the workers on the site, and they said that they will be demolishing the entire length of the block between Half, M, N, and Cushing; I asked about the WMATA employee lot just south of the station entrance, how much longer that lot would be there, and the workers said "not long." This lot is to be moved to Monument's land at 1236 South Capitol (south of the Public Storage Building), but as of a few days ago that land still required its own demolition. Monument's Zoning Commission/Capitol Gateway Overlay Review hearing on 55 M Street is scheduled for January 11, but considering the very tight timeline they're working under (needing to get the upgrades to the Navy Yard station completed before Opening Day 2008, plus their plan to get the three levels of underground parking completed by that date), it's not really a surprise that demolition is moving forward. A lot of moving parts that need to work together just right for success.... (And just FYI, I'm not considering this project "underway" until after they get zoning approval.) UPDATE: I think I see their interim solution for the WMATA parking lot, there's now "WMATA Lot Only" signs on the fenced-in lot a few feet further south on Half Street, they must be planning to move the employee parking there as the demolition works north to south, until the 1236 South Capitol lot is ready....

 

With no debate, the four Near Southeast alley closing bills that have been snaking their way through the DC legislative process in 2006 were passed at today's city council session, with both emergency and permanent bills being passed (emergency bills allow the statutes to take effect immediately, allowing the closings to be considered law as the permanent bills await mayoral and congressional approval). To recap, this batch included the closing of alleys on the west side of Square 701 between M, N, Cushing, and Half (at Monument Realty's 55 M Street site); the closing of alleys and the creation of streets named 2nd Place, 3rd Place, and an official designation of a portion of L Street, all part of the Capitol Quarter footprint; the closing of alleys and the eventual reopening of H and I streets between 2nd and New Jersey to make way for W.C. Smith's 1-million-sq-ft mixed-use project at 800 New Jersey; and finally the closing of alleys on the east side of Square 700 (between Half, Van, M, and N), where Monument will eventually add to their Half Street domination. That makes seven Near Southeast alley closings and street changes put on the books in 2006, when you include the stadium street closings, the Willco land on the east side of Square 701 (M, N, Cushing, and 1st) and the Square 743N west-side alley closings that allowed the start of construction on the 100 M Street office building and the Onyx on First residential tower. There's one more potential alley closing wandering around out there somewhere, and that's for Lerner's 1000 South Capitol Street office building; representatives came before ANC 6D way back in April, but (believe it or not!) a squabble broke out about an acceptable community benefits package in return for the ANC's report, and nothing's been heard on this since.
 
302 Posts:
Go to Page: 1 | ... 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 ... 31
Search JDLand Blog Posts by Date or Category