Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jun 18, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


3 Blog Posts

At the groundbreaking ceremony a few weeks ago for JPI's new residential project at 909 New Jersey Ave., an updated rendering of the 70/100 I Street project just across the way was on display as well. JPI was nice enough to pass the image along to me, and you can now see it on my 70/100 I Street page. And it looks like within the next few weeks the 70 I building will start to peek up above ground level, giving me a new site to photograph relentlessly.
Speaking of the groundbreaking, DC Cable Channel 16 will be showing it on Wednesday and Friday (June 20 and June 22) at 11 am, and perhaps later times as well. You can watch it on your District cable, or on live streaming video. And don't turn it off right when it's finished, because at 11:30 they're replaying the April check presentation ceremony at Canal Park.
More posts: 70/100 I, jpi
 

The Post's Dr. Gridlock has a blog entry today about the Maryland Transit Administration's plans for how MTA commuter buses will be diverted during the two-month shutdown of the Frederick Douglass/South Capitol Street Bridge that begins on July 6. Quoting: "MTA says that after listening to passengers, it has decided to bring some of its routes into the Branch Avenue and Suitland Metrorail stations for those who wish to transfer to the subway, but continue in and out of dowtown Washington for the other riders willing to tough it out through the congestion. (The buses will be stuck in the same congestion as the cars.)" See the entry for specifics on each bus route. Metro's bus route changes were announced a few weeks ago. (And thanks for the link, Dr. G!)
 

The final touches are starting to be put on Capper Building #2, the wraparound addition to the Carroll Apartments at 4th and M. It's expected that new residents will start arriving in July, with full occupancy by the end of the summer. While this was originally planned as a building for low-income senior citizens, there was a modification to its zoning back in March to allow younger residents with lower incomes as well. Seniors who have lived at Capper / Carrollsburg but chose not to move to the new Capper Seniors #1 when it opened in December get first dibs on units in this second building, followed by other former Capper residents who meet the requirements of having an earned income and having participated in their community supportive services program. Applications are also being accepted from non-Capper residents who have incomes between 50 and 60 percent of the area median income (just under $38,000 for a single person or $54,000 for a family of four). If you meet the income requirements and are interested in applying, you can visit the BallparkApts.com web site for more information, or call 202-546-1024.
As for the old Capper Seniors building at 601 L Street, it is scheduled to be demolished sometime this summer late this year. Temporary surface parking lots will be built on the site in time for the opening of the ballpark in spring 2008, but long-range plans call for office buildings to be eventually developed there.
UPDATED 6/19 with the revised timeline for demolition of the old Capper Seniors building; it's now scheduled to happen toward the end of 2007, thanks to hazmat abatement needing to take longer than originally planned.