Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jul 16, 2009
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

I took advantage of the sunny evening to dart around getting some desperately needed photo updates. First up is Diamond Teague Park, where progress on not only the water-taxi piers but the "on-land" portion of the park itself is now clearly visible from the viewing platform at Nationals Park. The last projected opening date I heard, a few months back, was July, but while it looks like maybe the park won't be pulled together in the next two weeks, it definitely appears to be getting there. See my Teague page for the latest pics.
I also snuck a peek through the door at Cornercopia and snagged a quick photo, showing goods now stocked on the shelves, but perhaps just short of being ready to open. Maybe they can get ready for all the folks heading to the ballpark this weekend? Don't forget, my offer still stands of a free sandwich to the first person who reports to me that it's open....
I also took some updated photos at Fourth and K in Capitol Quarter, where framing has sprouted on the north side of K. Then I wandered down to the Yards to get some better shots of the southeast corner of Fourth and Tingey, which is where the Trapeze School is going to be located. (You can also see the entire batch of today's photos, where you can then click on the icon to see an angle's entire history.) Speaking of the Trapeze School, the Post's Health section had a story today on what it's like to take a class from them. (You probably won't ever see *me* flying through the air with the greatest of ease.)
One other item--the WashTimes reported today that the Elton/Billy stage left centerfield in a bit of a mess, requiring the grass to be painted. As you can see from this shot I took during batting practice, it seemed to work pretty well.
Lastly, it only took me half the season, but I've now updated my Stadium Parking map to show the many options for cash parking (official and unofficial), in addition to the official Nats season ticket lots. And to think that there was a time when *some* people were worried there wouldn't be enough parking.
 

A reminder that the M Street/Washington Navy Yard exit off of I-295 North, along with portions of M and 12th streets, will be closed this weekend and next to continue work on the demolition of the ramps to RFK. The closure times are listed as being from 6:30 pm on Friday, July 17 through 6:30 am Monday, July 20 and from 6:30 pm on July 24 through 6:30 am July 27; access to the boathouses and ramps along Water Street will be open, and the 8th Street SE exit off of I-295 North can still be used. They've posted three maps showing the detours that will be in effect.
The ramp demolitions (bad pictures from last week here) are tied to preliminary work for the reconstruction of the 11th Street Bridges.
 




                  © Copyright 2024 JD.