peek >>
Near Southeast DC Past News Items: Oct 16, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


3 Blog Posts

I need to correct an error I made in my Oct. 5 post (which carried over to my Post column on Oct. 11) about the 11th Street Bridges Final Environmental Impact Statement. I incorrectly said that the total number of lanes in the preferred alternative design chosen for the bridges (12) would be unchanged from the current configuration, having misread the EIS wording that referred to the number of freeway lanes being unchanged. The two spans currently have eight freeway lanes; the new configuration, quoting from the EIS (page 5-13), will be "a new eightlane freeway bridge along the alignment of the existing 11th Street Bridge as well as a new, local four-lane bridge crossing on the current alignment of the Officer Welsh bridge." (The "Officer Welsh Bridge" is the official name of the downstream span and "11th Street Bridge" the official name of the upstream span of what is commonly referred to together as the "11th Street Bridges.")
I regret the error, and have docked my pay and put a warning in my file. If I do it again, I will fire myself and look to replace myself with a new me that I can trust.
More posts: 11th Street Bridges
 

With Opening Day 2008 inching closer, the cobbling together of parking at the new ballpark is apparently turning out to be a greater challenge than constructing an on-time on-budget stadium. So this week the city put in another zoning amendment request to allow more temporary surface parking lots, this time covering eight squares in Southwest, all between P, T, 2nd, and South Capitol streets. (See my Stadium Parking page for a map with the new lots highlighted.) You can read the Office of Planning's report on the new case (07-08A) for more detail.
On Monday night the Zoning Commission approved this request on an emergency basis, meaning that the zoning change takes effect immediately, lasting 120 days while a hearing is scheduled and a permanent amendment is voted on.
As with the original amendment approved earlier this year, the lots can last no more than five years, are required to be available for public parking during non-game times, and must have District Department of Transportation approval of their traffic routing plans to ensure that access to the lots is not directed along I, P, or Fourth streets, SW. There's also a new requirement being added with this latest request, that a minimum of five percent of the spaces in these lots be reserved for a car/ride-share program.
These new lots are still subject to the cap of 3,775 total spaces laid out in the first amendment, unless special exceptions are obtained after the cap is reached from the Board of Zoning Adjustment on a per-lot basis. As with the squares covered earlier this year, it's not expected that lots will suddenly sprout on every one of the locations covered in the request; the main goal appears to be additional flexibility in finding possible spots for the needed spaces.
A separate zoning action a few months ago approved three temporary surface lots totaling under 800 spaces at The Yards, across the street from the stadium. There are also apparently negotiations underway about using the lots at RFK and providing shuttle service to the new ballpark.
There are other locations within a few blocks of the ballpark that will no doubt become temporary parking lots as well--one example is the Lerners' recent permit applications to build a lot on land they own at 1000 South Capitol Street.
At Monday's ANC 6D meeting, when this new zoning amendment was discussed, commissioners mentioned rumors of additional lots perhaps coming to the recently closed KFC and Exxon locations on the west side of South Capitol. But these blocks are not in the Capitol Gateway Zoning Overlay, and so don't require the special approval needed for the squares in the previous amendment requests. And these additional locations still require the Nationals to contract with the landowners, which might not always be an easy negotiation.
The ANC commissioners did not bring up many concerns about this new request, other than asking for confirmation that the traffic controls in the initial amendment cover these new lots, which Judi Greenberg of the Office of the Deputy Mayor for Planning and Economic Development assured was the case.
Commissioner Ron McBee said that he hopes to organize a town hall meeting for Southwest residents about all the parking plans when they are more concrete, and vice chair Andy Litsky reminded Greenberg that the DC Sports and Entertainment Commission is supposed to be meeting with community leaders to address ballpark-related concerns, but that there hasn't been a meeting in six months.
The zoning commission's approval of the emergency action came with little discussion, perhaps reflecting that most of the potential issues with these temporary lots were hashed out in the first request.
Time should solve many of the initial parking issues around the ballpark; right now there are seven office and residential projects already under construction around Near Southeast that by 2008 and 2009 will have multiple levels of underground parking that could potentially be available for gametime, just as with the lots are in the buildings around the Verizon Center. Most of the squares in these recent zoning requests, along most every other block between South Capitol and Second, will also eventually be home to buildings with underground parking.
UPDATE: An e-mail sent out today to Nationals season ticket holders says that 2008 ticket package information will be sent out "in the next month or so", and that a "comprehensive transportation package will also be sent to all season ticket holders shortly after you have received your seat location information." Presumably the "transportation package" means parking plans for season ticket holders (and maybe a really good Metro map!).
 

In other news from Monday's ANC meeting:
* Council Member Phil Mendelson spoke about his concerns that the new consolidated crime lab construction schedule is continuing to slip. The new lab, which is supposed to be built at Fourth and School streets, SW, can't get underway until a new home (temporary or permanent) is found for the police department's First District station currently located there. Up until recently, of course, 1D was supposed to move to the old Post plant at 225 Virginia Avenue, but with that now scuttled, the Office of Property Management is hunting for a new 1D home somewhere in Southwest, perhaps using either the Amidon or Bowen elementary school buildings, both of which are at only 60 percent capacity and could be consolidated by moving the sixth graders to Jefferson Junior High School. Mendelson, "irritated" at how the city is handling the space shuffling, wants the process of finding a new 1D home speeded up, even if it means taking 1D out of Southwest, which of course was viewed as a nonstarter by this ANC that represents Southwest; Commissioner Sobelsohn commended Mendelson on his "bravery" for coming to Southwest and telling the residents they shouldn't have a police station. (It also sounds like Mendelson is still hoping for a return to using 225 Virginia, given his numerous references to the $500,000 checks the city is writing each month to lease the empty building.)
* The Randall School redevelopment project by Monument Realty and the Corcoran Gallery was approved, thanks mainly to a negotiated community benefits package that includes a $200,000 contribution by Monument to the ANC's Community Investment Fund, preferences for ANC 6D residents when filling the affordable housing component of the project, and agreements with the Corcoran to support various neighborhood art projects and arts education offerings for Southwest residents. The vote was 5-0; vice chair Andy Litsky did not vote, after expressing his displeasure with what he sees as Monument's threat to slow down the Navy Yard Metro station expansion when the company did not win the right to buy WMATA's Southeastern Bus Garage. Monument executive vice president Russell Hines, who attended the meeting, reiterated the points he made last week in an e-mail to Litsky, that the station expansion is not behind schedule as has been reported and that Monument is committed to getting the work completed by Opening Day 2008.
* A local resident informed the commission that three historic police and fire call boxes along First Street have recently gone missing. Those with x-ray vision can see them in my photos (up until yesterday) of First and N and First and O, deep in the heart of ballpark construction territory and along the stretch of First Street being renovated by DDOT; the now-missing First and L box is pretty hard to see behind the Onyx fencing. There's an effort called Art on Call, led by Cultural Tourism DC, to find and restore these boxes, and kids from the Earth Conservation Corps have been painting the boxes in Near Southeast and Southwest. Calls are in to the District Department of Transportation to see if the boxes have perhaps just been temporarily moved, or if they're, um, history. (The box at First and K is still in place, at least.)
 




                  © Copyright 2021 JD.