Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Mar 18, 2015
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

Just some things that didn't make it to the blog during the outage:
* MORE GROUND BROKEN: I had posted a photo last week of the new fence at not-Ballpark Square but wasn't quite ready to say that construction had started. However, the pile driver has arrived, and steel beams are already sticking out of the ground, so I think it's now safe to add the residential/hotel portion of the project to the ludicrous lineup of developments currently underway. (The office component at 99 M is expected to get started before long as well.) It's also the fourth to break ground just within the past month or so, joining residential projects 909 Half and 82 I and the Homewood Suites hotel at 50 M. And I think that's probably it for major projects getting started until the end of this year or early next year.
* BONCHON GETTING CLOSER: The paper is off the windows, so I was able to see where things stand at Bonchon--and it's looking well along. (Not pictured are the five or so boxes containing large flat-panel TVs.)
* DEMO PERMIT APPS: Applications have been submitted to demolish two buildings on the DC Water site--a 50,000-square-foot brick building and a 1,980-square-foot wood shed. Whether these are on the footprint of the planned movie theater/accompanying residential, I cannot tell you.
* SPRING! SPRING! There's now quite the inventory of outdoor tables at Willie's Brew & Que, and work is underway for a patio at the Big Stick (photo by Mr. JDLand):
* MORE ABOUT FOOD: I mentioned it in passing before, but there's been enough tweets sent my way to mention again that work has now started at the Scarlet Oak space at 909 New Jersey. And there's purty window ads now, to both get their name out there and to THWART my PEEKING. And closer to the river, at the Lumber Shed, both Due South and the Navy Yard Oyster Company have gotten their building permits.
With all that cleared out of the hopper, I now may be a bit scarce for the rest of the week. Hopefully the site will behave, though.
 




                  © Copyright 2024 JD.