Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jun 22, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


3 Blog Posts

From Saturday's Post: "Under a clear blue sky perfect for a baseball game, 500 construction workers responsible for one of the most expensive and most important projects in the District took a break yesterday for a quick pep talk. 'The closer we get to next year, the more people are looking at us to bring this project in on time and on budget,' Mayor Adrian M. Fenty told them on his first trip to the stadium site near the Navy Yard and South Capitol Street in Southeast." And while the article is based around Fenty's visit, the meat of it is really about the handoff of responsibility for ensuring the ballpark opens on time from outgoing DCSEC chair Allen Lew (heading off to try to repair the DC schools) to his replacement, Greg O'Dell.
Some quotes:
* "Lew said this week that the ballpark is on schedule, and remains within budget, with no indication that will change."
* " 'I'm going to be involved in this a lot more than I was," said [council member Jack] Evans, who keeps a small countdown clock on his desk, showing the number of days, hours and minutes until the anticipated first pitch at the stadium next April. 'I had kind of taken a step back because of the confidence I had that Allen would get this thing done. There was no need for me to be calling everybody up every week, saying: 'Where are we? Where are we?' But now I'm going to reinsert myself in terms of being in the loop constantly.' "
* "The stadium's steel framework and concrete seating decks are largely in place, as are miles and miles of ducts, electrical wires and pipes. Workers are drilling tens of thousands of holes in the decks to anchor seats. And a 200-foot tower crane has been erected to lift concrete and other materials for construction of a Nationals office building. Next month, workers plan to complete the steel framework for the ballpark's restaurant and main scoreboard and to start putting in the stadium seats. The project's schedule calls for installation of the scoreboard to begin in August. Then, in October, sod will be laid. The grass will take root before going dormant during the winter and then spring to life for Opening Day." [Dedicated readers of JDLand know all this already, of course!]
* "Still, problems remain, including a long-vexing issue that O'Dell will inherit when he takes control of the project. 'The biggest thing still out there,' Lew said, 'is coming up with an inventory of parking spaces to meet game day requirements.' " (The article says that 9,200 spaces will be needed; the March transporation presentation and various Office of Planning documents have been quoting 4,900 as the maximum needed for a sellout game. I guess when the draft Transporation Operations and Parking Plan comes out [Any Minute Now!], we'll see what the real number is.)
Read the entire article for additional details. And of course you can look at my stadium construction photo galleries or the official webcam if you want to see what it's looking like.
More posts: parking, Nationals Park
 

Tomorrow is the First Annual Ward 6 Family Picnic and Celebrity Softball Tournament, hosted by council member Tommy Wells; "Join the Nationals' Felipe Lopez, Jesus Flores and Jesus Colome as they play tee-ball with the kids and become celebrity coaches in the Softball Tournament. Plus, we have over a $1,000 worth of raffle prizes to give away (including autographed Nationals' jersey, autographed DC United soccer ball, 100 Nationals' baseball tickets, gift certificates to dozens of local restaurants and businesses, free sponsorship for a 3-day youth soccer camp, and many more)!" The event will take place at the Rosedale Recreation Center at 1700 Gales Street, NE, starting at 10:00 am, with activities running until 4:00 pm. See Tommy's blog for more details.
More posts:
 

Today's print edition of the Washington Business Journal has an article summing up what's going on right now with various commercial projects around Near Southeast. (The online article is for subscribers only for the first 30 days; sorry.) Here are the new items:
* William C. Smith is planning to hold off breaking ground on its 200,000-sq-ft building at 250 M Street until it pre-leases at least 30% of the building.
* Opus East has leased 80,000 sq ft at 100 M Street (33% of the building) to government contractor Parsons Corp.
* Lerner's 20 M Street does not as yet have any office tenants.
* It also mentions that Opus East is planning to build the 440,000-sq-ft office building at 1015 Half Street (the old Nation site) on spec; but it should be noted that Opus hasn't yet officially announced its purchase of this property or its plans.
(The article also summarizes what's going on at Florida Rock, using some source materials that are hard to find anywhere other than here at JDLand. Note to reporters and other professionals using my site: yup, lots of stuff is posted here, and it's all free, but be a grownup and say where you found it.)
In addition, there's an ad in the print edition giving us our first peek at the Shalom Baranes design for 1100 South Capitol Street, Ruben Companies's planned 350,000 sq ft office building on the southeast corner of South Capitol and L. There's currently no timeline for development of this project.
The print edition also has a piece written by GSA about the US Department of Transportation completing its move to its new headquarters at New Jersey and M. It describes the HQ's interiors and exteriors, and mentions that this project is the largest lease ever executed in DC.