Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jun 11, 2014
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

Metro announced today that it has chosen MidAtlantic Realty Partners and CAS Riegler Companies to develop the agency's 14,000-square-foot lot on the southwest corner of Half and L streets, SE, known as the "chiller plant" site.
Plans are for a 126-unit condo building with 6,000 square feet of ground-floor retail, in addition to integrating the chiller facility into the building.
The deal still has to be approved by Metro's board of directors, but the press release says "construction is expected to begin in 2016."
The press release does not say if the team plans to also purchase the 7,700-square-foot lot next door, which is for sale (and which has a bit of a history).
This will be MRP's second foray into the neighborhood, after having entered a deal in 2011 to co-develop the (still pending) first phase of the Florida Rock development.
The path to developing this site has not been a short one, given that WMATA has been trying to get the site developed since 2006. Three bids were received for the site earlier this year, two residential and one for an office building.

 




                  © Copyright 2024 JD.