Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Twelve12/Teeter/Yards
See JDLand's Twelve12/Teeter/Yards Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


70 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7

Beginning the trek through the approvals process are the first new-construction buildings planned for The Yards--a 320,000-square-foot office building at 401 M Street and a 170ish-unit apartment building to its south at 400 Tingey Street. They would both have ground-floor retail, but it's what's planned for 401 M that will probably have everyone's attention, because a grocery store is proposed for that space, just inside the historic wall and sentry tower on the southeast corner of Fourth and M. (No, which grocery store it could be hasn't been announced yet.) Recent documents have said that 401 M could begin construction in late 2008, with delivery in 2010; the residential building's start depends on "market conditions." (Uh-oh.) A few more early renderings are on my 401 M/400 Tingey page. (See my Yards First Phase page for information on the retail and residential projects that are getting underway this year.)
There's a Zoning Commission Southeast Federal Center Overlay Review of the plans scheduled for April 17, and ANC 6D will be voting on whether to support the project at its March 10 meeting.
Also at Monday's ANC 6D meeting will be presentations and votes on plans for the Opening Day Fan Fest at the ballpark, the ballpark Transportation and Residential Curbside Management Plan (formerly known as the TOPP), and the South Capitol Street Draft Environmental Impact Statement. I attended Wednesday night's public meeting on the Draft EIS, and while the slides from the meeting haven't yet been posted on its web site, the DEIS's executive summary is a good substitute for the information that was available at the meeting--you can read my summary of the plans as well. There wasn't much public comment (maybe seven or eight speakers), and the concerns seemed to be more about making sure DDOT does a good job of handling the inconveniences and resident issues as a result of the planned changes, rather than any real opposition to the plans themselves. The public comment period ends March 31, and the Final EIS is expected to come out late this year.
Alas, I won't be able to attend this ANC meeting that's so chock full of Near Southeast goodness. But I'm guessing that spending that evening watching the Roger Federer-Pete Sampras exhibition at Madison Square Garden might be a bit more enjoyable.
 

A press release just in over the transom is announcing that Forest City has hired CB Richard Ellis to handle the leasing of what's being called 401 M Street, the office building to be built on the southeast corner of 4th and M just east of the US Department of Transporation HQ. This is "Parcel D" on my Yards First Phase page, and is the building that will have a grocery store on the first floor in addition to the 300,000 sq ft of office space. Construction is scheduled to start next year, with delivery in spring 2010. (There's also an ad announcing this in today's print edition of the Washington Business Journal.)
More posts: Retail, The Yards, Twelve12/Teeter/Yards
 

With many thanks to Forest City Washington, I've posted a bunch of renderings of the four projects that are on the boards at The Yards in its first phase of development. These came from the submission on the first phase that FC made in advance of its July 12 presentation in front of the National Capital Planning Commission, and while they have some nice drawings of the plans that I've written about in the past for renovating three of the historic buildings at the old Southeast Federal Center, the big news is the first hints of what's planned for "Parcel D", currently a parking lot on the east side of 4th Street south of M: it's to be a residential building the south end of the site and an office building on the north end that would have a grocery store on the ground floor at 4th and M. The drawings also show the additional floors to be added to the brown-and-white Building 160 and imposing red-brick Building 202, both of which have interior atrium/courtyards I never knew about. And there's a few cool renderings of the plans for transforming the very industrial Building 167 that sits right behind the new DOT HQ into retail space. (Plans for the five-acre waterfront park and other areas in the Yards were not part of this submission.)
I didn't get the entire submission, so I'm not knee-deep in details, but everyone should definitely look at these drawings to see what's coming at The Yards. We should be seeing the beginnings of the streetscape improvements Any Minute Now (which include landscaping that barren area on the west side of New Jersey Ave. south of M), but the completion of the Building 167 retail and Building 160 residential won't happen before 2009, and the Parcel D/grocery store project *could* finish in 2010. So don't pack your bags or write your shopping list just yet.
 
70 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6 | 7