Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: sprint
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts Since 2003

I shouldn't be writing this at lunch time:
* OATH OFFICIAL: Tomorrow (Thursday, April 19), Oath Pizza is having its official grand opening, with half-price pizzas as well with samples and swag, from 11 am to 10 pm. Address is 110 M St., SE, next to Bethesda Bagels.
* TRUCKEROO RETURNS: Friday, April 20, brings the return of monthly summer food truck festival Truckeroo, once again being held at the Bullpen at Half and M Streets, SE. Hours are shorter than they used to be, though, with the doors opening at 4 pm and running until 11 pm.
* FIVE GUYS RETURNS: Commenter ZinNY reports that a sign on the door at Five Guys says it will reopen on Monday, April 23. And with milkshakes, finally.
* NOT FOR EATING: One non-food tidbit, which is that reader Bryan Rodda reports that the Sprint store is now open at 4th and M, SE.
* PHOTOS OF THE NEWBIES: I was out amongst the hordes on Saturday, and got a few photos of the newest arrivals in the neighborhood, on a beautiful day for al fresco dining. (I also got lots of other photos, but have been distracted from posting about them. Soon.) If I may actually express two opinions, I'll note that Declaration's front bar is a great tableau for 1st Street, and All-Purpose's facade and outdoor areas are lovely (and clearly not a secret).
 

It has taken me much longer to clear the post-surgical cobwebs from my brain than I expected, so don't have many expectations for this post. I just hope it's in English. (But the hip repairs--NOT REPLACEMENT!--went well, and I should start getting off of crutches soon.)
* SPRINT STORE: I have said for years that no new neighborhood has truly arrived until it gets its first cellphone retailer, and I would not have guessed it would take until 2018 for that box to get checked, but numerous approved building permits indicate that Sprint will be opening a store in the old Sizzlin' Express space on the northwest corner of 4th and M.
* DOUGLASS BRIDGE GROUNDBREAKING: As if to taunt me after 15 years of watching and waiting, the Feb. 13 ceremonial groundbreaking for the new Douglass Bridge and associated first-phase improvements to the South Capitol Street Corridor was held while I was very much horizontal and hopped up on goofballs. But since it's right on our DMZ line, SWill was there and took some photos. Estimated completion date is 2021. (Speaking of SWill, he is the one to read for coverage of Buzzard Point, since that is outside my purview.)
* TUNNEL DOINGS: The last section of wall on the new Virginia Avenue Tunnel was poured on Feb. 22. an effort that overall totaled three miles of 24-foot-tall concrete. Meanwhile, 3rd Street should be reopening to two-way traffic Any Minute Now, which then paves the way (sorry) for both the 4th and 5th Street intersections to close, probably in mid-March, to dismantle the temporary bridge decks and complete the new tunnel's roof in those blocks, and wrap up the final street restoration. And no, the 6th Street exit ramp from the freeway won't close. The entire project is "on time," for completion this fall, according to CSX.
* ANOTHER PROJECT READY TO GO: A shoring/sheeting/excavation permit has been approved for the second phase of the "Riverfront" project, aka the Florida Rock site. This will be a 13-story, 260ish-unit residential building with about 12,000 square feet of retail, and will go up immediately to the west of Dock 79. When I'm a little more mobile I'll write a roundup of what's currently underway.
* WINERY HAPPY HOUR: If you don't have a supply of post-surgical painkillers like some people, there's now a Happy Hour at District Winery, from 3:30 to 6:30 pm Monday through Friday, with $8 signature cocktails and select wines, $5 select beers, and 50 percent of District Winery wines by the bottle.
There's probably more, but this wore me out. Hey, it's a start.
 




                  © Copyright 2024 JD.