New Community Center at Capper/Carrollsburg
1000 5th St., SE

New 18,000-square-foot community center, replacing one demolished in 2007
Construction started spring 2014, completed summer 2016

In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
  Aug. 11, 2016 - The Capper Community Center, opened, albeit without an operator just yet.
Oct. 29, 2005 - The same angle from back when the old Capper Community Center was still standing. It was demolished in March 2007.
Capper Community Center, Sliding from to August 2006 to June 2016
before
after

The northeast corner of 5th and L Streets, SE, with the old community center at far left in the 2006 photo, and now with construction proceeding.
Browse More Sliders

 
  Aug. 11, 2016 - The northern entrance, configured to be the door to the daycare center once it is up and running, and the playground.
  Aug. 11, 2016 - The building's colorful main entrance. For more interior photos, see this gallery.
  Aug. 11, 2016 - The gymnasium. For more interior photos, see this gallery.
  Aug. 11, 2016 - The upper of the building's two long corridors.
May 2003 - The east side of 5th Street, from L Street, in May 2003.
Jan 12, 2020 - The same spot. Note also Capper Seniors #1 in the background and the Marine Bachelor Enlisted Quarters parking garage at right.  Click to see all available photos of this location.
March 12, 2015 - One of my favorite photos of the construction, showing the framing and trusses of the gym.