Since January, 2003
            
 (a random before-and-after moment)
August 21, 2003
May 2, 2013
2nd (West) at I, Looking East-Southeast (see more)

I already looked down this month, now it's time to look up.
* ARRIS: Let's start with the now-topped-out Arris apartment building at the Yards. In addition to its having reached its final height, the masonry work on the five lowest floors of the eastern portion of the site is pretty far along, and windows have started appearing in the second floor.
While the three "pavilions" on the western side (not seen real well in this shot, but check the rendering) will be brick-faced all the way up their eight floors, the east tower's upper façade will be all glass, with an undulation that's obvious even with just the concrete in place.
This building will have 325 rental units and 20,000 square feet of ground-floor retail and is expected to open in early 2016.
* PARK CHELSEA: It certainly won't win the prize as Speediest Construction Project Ever, and the countdown to the start of leasing has changed its target from July 1 to September 15, but work on the 430ish-unit rental building on New Jersey Avenue does continue. You may have seen the forms with the planets-and-the-stars design that have now been hoisted up to their final perches on the roof--I've been told this is based on Johannes Kepler's "star polygon tessellations," which I concede is way too much education for JDLand to normally pass along.
* LOFTS AT CAPITOL QUARTER AND CAPPER COMMUNITY CENTER: They may not be tall, but they are wide--as is my lens, thankfully. If you are wondering about the concrete portion on the western end of the Loft's construction, that's parking for residents of the building's 195 mixed-income units. The two projects, both along L Street between 5th and 7th, should be completed in 2016.
* THE BRIG: I certainly could have used a drink after the 11 miles of walking I did in two passes on Sunday to properly update my photo archive, but while work on the beer garden at 8th and L to be known as The Brig continues, it still has a ways to go before it begins quenching thirsts. But it's interesting to now start to see the outline of its contribution to the "skyline" along 8th.
The links above have lots more information on each project, of course. And I skipped the Hampton Inn in the roundup, but I wouldn't want it to feel left out.
Comments (16)
   
 
 More About Development News

JDLand.com Home

Comments

JD says: (4/28/15 11:54 AM)
And in unrelated news, I think I can now say that the 503 errors did not follow us to this new home. (I think the site can slow down a bit at peak, but that does start to become an I-Get-What-I-Pay-For issue, and at least is the sort of thing people are more used to dealing with.)



conngs0 says: (4/28/15 1:23 PM)
Awesome update, JD! Thanks a bunch. I think Arris is really shaping up to be a good looking building. I actually like that whole part of the neighborhood, with the brand new buildings doing a good job of complementing the retrofitted Boilermaker Shops and Lumber Shed. Regardless, it's nice to see projects in various stages of completion - looks like we'll be getting a pretty steady series of openings through the 2016-2017 timeframe!


JD says: (4/28/15 3:25 PM)
(Famous last words on the 503 error, but if you saw one in the past little while it was because the shared server was having to be restarted--a different breed from the lickety split ones from before.)


willinrm says: (4/29/15 8:35 AM)
Finally let me create an account, yayyyyyy!!!! You might have mentioned this in past posts.. but I didn't see The Brig on project directory, is there an estimate completion date for it? (fingers crossed for this summer!!)


JD says: (4/29/15 9:40 AM)
Sorry about the account thing--I think you got caught up in the site move. (If anyone else out there reading this has been unable to create an account in the past few days, try again)

As for the Brig, the original target date was May, which always looked optimistic, but a reader who talked to an on-site worker was told that June is probably even a stretch. As I always say, it'll open when it opens. Something about restaurants (other than Biersch and Bonchon) make them incredibly slow processes. And the Brig, while not a restaurant and with a much smaller "build out," is still starting from scratch.


ZoolanderANDtheBoYz says: (4/29/15 1:49 PM)
Mrs. JD, your camera would be a good use if you go down right now and capture the dark soaked soil from 909. Yo, everyone the smell of gasoline is back.


ZoolanderANDtheBoYz says: (4/29/15 1:52 PM)
*soaked in gasoline


ZoolanderANDtheBoYz says: (4/29/15 2:00 PM)
Call me crazy but, I am starting to speculate why we haven't seen what 909 looks like? The more they dig, the more they find a toxic soil. Hey, unless you are trying to find oil underneath of that or you are trying to dig till where you can not find how deep the gasoline went down - you will dig till your money drains.



JD says: (4/29/15 2:17 PM)
And I should do what you tell me to because you're always so nice to me?


ZoolanderANDtheBoYz says: (4/29/15 2:33 PM)
Mrs. JD, I am very sorry.. I apologize from my bottom of my heart. I am being genuine. Sometimes, I say something that I didn't meant to say and I don't know how to fix it. Or it just becomes too late to fix it or to say sorry.

Yes, I am cult follower. I check your site three or more than that every day. I am sort of addicted to it (there is no sarcasm here).

I guess I will blame chrome over VPN for my frustration.


SWag says: (4/29/15 3:59 PM)
*Game of Thrones reference* JD is Lord Commander John Snow. Zoolander is Janos Slynt (bald guy in the Night's Watch). His head is on the chopping block. What should she do after that feeble apology? (JK about it being feeble, it just ties into the episode)


JD says: (4/29/15 4:15 PM)
(I'm trying to come up with a commensurate Mad Men reference, since that's what I watch on Sunday nights. :) )


202_cyclist says: (4/29/15 4:22 PM)
@Zoolander--- nope, no health concerns there, just go ahead and start fracking that stuff!


202_cyclist says: (4/29/15 4:26 PM)
@Zoolander: also, isn't gasoline supposed to be the smell of FREEDOM!!! or some BS like that?


ZoolanderANDtheBoYz says: (4/29/15 6:22 PM)
@ Swag...I just fell down, lol swag.

FYI, you are a tool swag @swag. No, I am not Janos Slynt. I am Targaryen and you will change in to ashes by my dragons. Watch out swag.

@202, high five - yes, gasoline is supposed to be a smell of freedom.


JD says: (4/29/15 11:48 PM)
@202, did you see you got your newest crane today? At Florida Rock, as I predicted.

Photo from JES: link


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News
  

JD on Willow Opening on: Oh dear God, people, dial it back....
goldfish on Willow Opening on: CJ -- if you want to start a fight, an ethnic slur is perfect for the job. It on...
202_cyclist on Willow Opening on: Fair enough-- BANANA works. "Build Absolutely Nothing Anywhere Near Anythi...
CJBabyDaddy on Willow Opening on: One should not use ethnic slurs — even rarely. On the other hand, cuss up a blu...
goldfish on Willow Opening on: I'm with Walt. And I think the word "NIMBY" is pejorative and should be used rar...
Message Board (beta)

Get JDLand Updates In Your Inbox!


Thousands and thousands of photos showing the neighborhood changing. More than 150 buildings no longer with us. All the news, since 2003. Photos from various archives showing the neighborhood in the more distant past. Maps from the early 1900s. Overhead Photo Comparisons: 1949, 1988, 2002-2008. All Blog Entries, 2003 - Present Major Events, 1799 - Present A series of blog entries looking at the neighborhood's history.
Near Southeast's Rearview Mirror


City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
70 B/O I ST SE   BURGLARY
Burglary Two
 11/16/17
1200 HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/15/17
1100 B/O 1ST ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/14/17
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/13/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 11/12/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/12/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/09/17
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/06/17
1200 SOUTH CAPITOL ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/05/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/05/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 11/01/17
100 B/O K ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 10/30/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/29/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/27/17
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/25/17
100 B/O K ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/21/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/19/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/19/17
1400 B/O SOUTH CAPITOL ST   ROBBERY  10/18/17

Recent Issued Building Permits Archive  
1100 2ND PL SE   
10/26/17 
null / KENNETH J. LEMERE
E1800879 / SUPPLEMENTAL
   
11/02/17 
BAKER DC / CHRISTINE LONG
AH1800167 / CONSTRUCTION
An after hours permit is respectfully requested from 5AM to 8PM daily
1331 2ND ST SE 20003   
10/30/17 
DC WATER / DAVE LEVINE
AH1800128 / CONSTRUCTION
After Hours work for structure excavation and support for B1311474 DC Water, Corman Construction 301-343-5417.
1331 4TH ST SE CU   
11/02/17 
FC 1331 LLC / null
E1801120 / SUPPLEMENTAL
1023 4TH ST SE   
11/06/17 
MATTHEW E WEINER
BP1800535 / POST CARD
1331 4TH ST SE   
11/14/17 
FC 1331 LLC / PAUL E WARREN
E1801475 / SUPPLEMENTAL
1346 4TH ST SE   
11/07/17 
ALAN OWINGS / ROBERT HENRY
AH1800169 / CONSTRUCTION
After Hours Permit for 11 / 10 / 17 from 7am to 7pm to perform concrete operations.
1015 HALF ST SE 7TH FL   
10/31/17 
HALF STREET SE LLC / null
P1800798 / SUPPLEMENTAL
1015 HALF ST SE   
10/23/17 
HALF STREET SE LLC / null
E1800739 / SUPPLEMENTAL
   
10/23/17 
HALF STREET SE LLC / null
M1800233 / SUPPLEMENTAL
   
10/23/17 
HALF STREET SE LLC / null
P1800599 / SUPPLEMENTAL
303 K ST SE   
10/22/17 
JONATHAN HERSHEY / null
P1800573 / SUPPLEMENTAL
555 L ST SE   
10/31/17 
UNITED STATES OF AMERICA / EDUARDO L. LOPEZ
E1801004 / SUPPLEMENTAL
   
11/08/17 
UNITED STATES OF AMERICA / null
P1801050 / SUPPLEMENTAL
   
11/08/17 
UNITED STATES OF AMERICA / null
M1800409 / SUPPLEMENTAL
80 M ST SE #110 20003   
11/03/17 
WELLS REIT II 80 M STREET LLC / null
P1800898 / SUPPLEMENTAL
300 M ST SE 402   
10/30/17 
FEDERAL CENTER LP / null
E1800973 / SUPPLEMENTAL
300 M ST SE STE# 402   
11/01/17 
FEDERAL CENTER LP / BERNARD CHAPPELL
E1801037 / SUPPLEMENTAL
110 M ST SE   
11/10/17 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / JIM RILEY
BP1800623 / POST CARD
922 M ST SE   
10/27/17 
MAIFEDI EQUITY LLC / FRED LATIMORE
E1800926 / SUPPLEMENTAL
1333 M ST SE   
11/03/17 
1333 M STREET SE LLC / JUSTIN BELLOW
B1801393 / CONSTRUCTION
Installation of duct bank and light pole on private property
800 NEW JERSEY AVE SE   
11/13/17 
SQUARE 737 LLC / N/A; BOB BIROONAK
SG1800066 / CONSTRUCTION
one apartment id sign illuminated
861 NEW JERSEY AVE SE   
10/30/17 
CSX TRANSPORTATION, INC. / NA CSX TRANSPORTATION, INC.
AH1800132 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1000 NEW JERSEY AVE SE   
10/26/17 
null / NA NA NA
EHOP17919268 / HOME OCCUPATION
1100 NEW JERSEY AVE SE   
11/03/17 
SQUARE 742 LLC / null
E1801147 / SUPPLEMENTAL
   
11/08/17 
SQUARE 742 LLC / null
E1801323 / SUPPLEMENTAL
1244 SOUTH CAPITOL ST SE 20003   
11/02/17 
THE JBG COMPANIES / CODY LANG
AH1800140 / CONSTRUCTION
The location for the project is at the corner of South Capitol Street, SE and N Street, SE, to the North of Parking Lot B for the Washington Nationals Stadium. The permit numbers to reference are B1600228, PA10464330, PA115172-R2, and PA202883. These permits are attached for reference. In order to maintain our contractual requirements and progress with critical path interior finishes, rooftop bu...
1244 SOUTH CAPITOL ST SE   
10/31/17 
THE JBG COMPANIES / GLENNWOOD ROGERS
FB1800009 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row