Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Oct 19, 2009
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

While my dinner is in the oven, here's the speediest of reports from tonight's ANC 6D meeting:
* The ANC voted 7-0 on a resolution supporting the city council's proposed marriage equality act.
* They voted 5-2 to support Florida Rock Properties' pending request in front of the Zoning Commission to extend the deadline for the first building permit application at RiverFront two years, to June, 2012, which would push the deadline for the start of first-phase construction to 2013. (Read this entry for more details, and see my project page for specifics on the development itself.) It's expected that this will be taken up at the November 9th ZC public meeting.
David Briggs of Holland and Knight, representing FRP, said that while the developer has worked "assiduously and tenaciously" since last year to find either equity or construction funding, the notion of starting the first-phase office building within the current zoning timeline is "just not viable." FRP does say, though, that they will be continuing to search for funding if they receive the extension. In the meantime, FRP made its required $800,000 payment to the city last fall to help defray the costs of Diamond Teague Park next door; I asked if there were any possibility that perhaps the land on the very east end of the Florida Rock site, which will eventually be a public plaza that abuts Teague Park, might be cleared and opened as public space before the construction begins on the office building--they're "looking at options."
* The commissioners also voted 7-0 to support the zoning special exception request by the operator of the six-unit "Casa degli Angeli" at Third and L, which is currently operating as a month-to-month room rental and which is looking for a zoning change to become a full-fledged bed and breakfast. The Board of Zoning Adjustment hearing is scheduled for Nov. 17.
 




                  © Copyright 2024 JD.