Since January, 2003
            
 Sliding from Before to After

While my dinner is in the oven, here's the speediest of reports from tonight's ANC 6D meeting:
* The ANC voted 7-0 on a resolution supporting the city council's proposed marriage equality act.
* They voted 5-2 to support Florida Rock Properties' pending request in front of the Zoning Commission to extend the deadline for the first building permit application at RiverFront two years, to June, 2012, which would push the deadline for the start of first-phase construction to 2013. (Read this entry for more details, and see my project page for specifics on the development itself.) It's expected that this will be taken up at the November 9th ZC public meeting.
David Briggs of Holland and Knight, representing FRP, said that while the developer has worked "assiduously and tenaciously" since last year to find either equity or construction funding, the notion of starting the first-phase office building within the current zoning timeline is "just not viable." FRP does say, though, that they will be continuing to search for funding if they receive the extension. In the meantime, FRP made its required $800,000 payment to the city last fall to help defray the costs of Diamond Teague Park next door; I asked if there were any possibility that perhaps the land on the very east end of the Florida Rock site, which will eventually be a public plaza that abuts Teague Park, might be cleared and opened as public space before the construction begins on the office building--they're "looking at options."
* The commissioners also voted 7-0 to support the zoning special exception request by the operator of the six-unit "Casa degli Angeli" at Third and L, which is currently operating as a month-to-month room rental and which is looking for a zoning change to become a full-fledged bed and breakfast. The Board of Zoning Adjustment hearing is scheduled for Nov. 17.
Comments (0)
   
 
 More About Casa Degli Angeli

JDLand.com Home

Comments

No comments posted.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

dcgent on Roundup of Some: Very cool historical look at the neighborhood https://storymaps.arcgis.com/stori...
Jscott280 on Roundup of Some: Looks like the Hilton brothers are partnering with solace brewing for the retail...
JD on Roundup of Some: And these tidbits from Martin Austermuhle on Twitter: Yikes: Per data from D....
JD on Roundup of Some: This is why I remain extremely reticent to speak much of expected openings. h...
tmich93 on Roundup of Some: Just tried La Famosa yesterday and it was terrific. Their menu has terrific valu...
tmich93 on Roundup of Some: Sorry to hear that JD! Best wishes to your father during his recovery.
Get JDLand Updates In Your Inbox!


Thousands and thousands of photos showing the neighborhood changing. More than 150 buildings no longer with us. All the news, since 2003. Photos from various archives showing the neighborhood in the more distant past. Maps from the early 1900s. Overhead Photo Comparisons: 1949, 1988, 2002-2008. All Blog Entries, 2003 - Present Major Events, 1799 - Present A series of blog entries looking at the neighborhood's history.
Near Southeast's Rearview Mirror


City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 1ST ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 09/16/20
100 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/16/20
200 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/20
1000 B/O 3RD PLACE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/12/20
UNIT B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/10/20
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/07/20
UNIT B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/04/20
1100 B/O 8TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/30/20
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/27/20
UNIT B/O K ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/23/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 130   
09/08/20 
ASANA PARTNERS / KEE HAN KIM; W. SAKIE - BHAR; NA
SG2000328 / CONSTRUCTION
Install one set of building sign and one set of double side blade sign
1331 4TH ST SE CU   
08/28/20 
FC 1331 LLC / null
P2008455 / SUPPLEMENTAL
   
08/31/20 
FC 1331 LLC / null
E2010801 / SUPPLEMENTAL
   
09/01/20 
FC 1331 LLC / null
P2008520 / SUPPLEMENTAL
150 I ST SE   
09/10/20 
SQUARE 737 LLC / SHON THOMAS
AH2001871 / CONSTRUCTION
Placing mobile crane on 2nd Street SE for hoisting materials to 150 I Street SE and closing sidewalk for pedestrian safety
300 M ST SE   
09/11/20 
FEDERAL CENTER LP / HOSSEIN HAMED; WILLIAM G ROSENBERG; NA
SG2000379 / CONSTRUCTION
INSTALL TWO BUILDING MOUNTED LED-ILLUMINATED SIGNS W / FACE LIT CHANNEL LETTERS ON BACKER.
861 NEW JERSEY AVE SE   
08/26/20 
GREYSTAR GP LLC / CHARLES C. BAKER; CHARLES C. BAKER
M2003573 / SUPPLEMENTAL
   
08/26/20 
GREYSTAR GP LLC / CHARLES C. BAKER; CHARLES C. BAKER
P2008383 / SUPPLEMENTAL
   
08/26/20 
GREYSTAR GP LLC / CHARLES C. BAKER; CHARLES C. BAKER
P2008384 / SUPPLEMENTAL
   
09/08/20 
0861 NEW JERSEY AVE / null
M2003711 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 20590   
08/26/20 
UNITED STATES OF AMERICA / null
M2003570 / SUPPLEMENTAL
1299 NEW JERSEY AVE SE   
09/08/20 
BROOKFIELD PROPERTIES / TIM GOOD
BP2004497 / POST CARD
1013 O ST SE 20374   
08/25/20 
UNITED STATES OF AMERICA / JOHN P RUTTER; JOHN P RUTTER; KYLE ERICKSON
BCIV2000052 / CONSTRUCTION
This project is for the interior renovation of the historic buildings 46 and 67 in the Washington Navy Yard. New utilities will be installed to serve the building. NO NEW BUILDING WILL BE CONSTRUCTED AS PART OF THIS PROJECT. A parking lot south of the building will be used to provide stormwater management, as there is no ample open space within the buildings for stormwater BMPs.
   
09/14/20 
UNITED STATES OF AMERICA / JOHN BROWNING
SB2000494 / CONSTRUCTION
Install three temporary 1" groundwater monitoring wells down to 4' bsg in the basement of buildings 46 and 67 in the Washington Navy Yard for groundwater sampling. Wells will be removed less than 1 week following installation, and the voids will be filled with grout.
71 POTOMAC AVE SE   
09/03/20 
MRP REALTY / JUSTIN BELLOW
TL2000041 / CONSTRUCTION
1st time tenant fit out in new building
   
09/04/20 
RIVERFRONT HOLDINGS II, LLC / JUSTIN BELLOW
B2007457 / CONSTRUCTION
Revision to B1804337 to revise the location of IZ units.
520 TINGEY ST SE   
08/31/20 
U. S. GENERAL SERVICES ADMINISTRATION / JOHN WICKLIFFE
TN2000086 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed on Aug 4, 2020 - Jan 29, 2021 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.