Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Oct 13, 2006
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

Just a reminder that the Capitol Quarter sales office will open on Saturday Oct. 14 at 11 am for it's one-week "sneak preview" of the development (meaning no contracts or appointments). I was lucky enough to get a sneak preview today of the sneak preview--if you're at all interested in Near Southeast, even if you're not currently thinking about moving to Capitol Quarter, you must go see the model of the developed neighborhood, it's absolutely stunning. I took a bunch of photos of it and have put them on my Capitol Quarter page, sprinkling them throughout and displaying them alongside the "live" photos of the area. Sales will begin first-come first-serve at 11 am Oct. 21 for the first phase of market-rate and workforce-rate townhomes. Prices and floor plans are supposed to be posted any second now on the official web site. One thing to remember as you look at the model--the low-, middle-, and high-income units are all mixed in with each other, sometimes multi-unit low-income rentals will have facades that make them look like two townhomes, so from the outside you can't tell which units are which. UPDATE: Prices and floor plans are now posted, on a spiffy new Capitol Quarter web site.
More posts: Capper, Capitol Quarter
 

A web site has been launched for the 260-unit residential building at 1st and L, which I've been referring to as 1100 First Street but which has been dubbed Onyx on First. Not much in the way of actual information there, but there is a registration form to fill out. (And I hope people who aren't in-the-know about Near Southeast aren't baffled by the "Ballpark Metro" references, since there's no station with that name, of course.) This is the project being developed jointly by Faison and the Canyon-Johnson Urban Fund (Magic Johnson being the "Johnson" part of that).
More posts: Onyx, Square 743N
 




                  © Copyright 2024 JD.