peek >>
Near Southeast DC Past News Items: Oct 13, 2005
In the Pipeline
1000 1st St.
Square 696
Yards/Icon Theater
1000 South Capitol
25 M
Chiller Site Condos
Yards/Parcel A
1333 M St.
New Douglass Bridge
More Capper Apts.
250 M St.
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

The Oct. 13 Voice of the Hill (PDF here) has pieces on two Near Southeast items: the cleanup of the Virginia Avenue Park at 9th and Virginia in the East End (on page 4), and an item (page 14) on the vacant Washington Star/Washington Post building at 3rd and Virginia, and the Washington Canal Park project just to the plant's south. (Scroll to the bottom of my Canal Park page, and you can see rough drawings of how the building could look after a conversion to office or mixed-use.) The article mentions a target date of 2007 or 2008 for Canal Park, which is a pretty fair delay from the original 2006 completion timeline. You can also look at my Capper/Carrollsburg page for more information about the housing that will be going up around the park.

 




                  © Copyright 2017 JD.