Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jul 13, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


3 Blog Posts

Who could envision a more exciting Friday night than watching the Tivo'ed coverage of today's DC Council Committee on Economic Development Public Hearing on the plans for the transition of the Anacostia Waterfront Corporation and the National Capital Revitalization Corporation into the office of the Deputy Mayor for Planning and Economic Development. (Maybe it's time for a new JDLand motto: We bore ourselves to tears so you don't have to.)
What is probably the biggest headline from the hearing for those with Near Southeast interests is that Deputy Mayor Neil Albert called "totally incorrect" the recent reports that construction would begin on Canal Park in August. Valerie Santos Young, now the Chief Operating Officer of the Deputy Mayor's office, said that negotiations are continuing with both the owner of the unused parking lot of the northernmost block of the park (Urban Parking Ventures) and with the group that owns the lease for the school bus parking on the other two blocks, but no agreements have been reached.
With that pleasant news out of the way, there really wasn't much else of note in the hearing that specifically impacts Near Southeast. There will be job cuts as the three organizations are merged into one, and employees should know their status in the new plan by Aug. 15; the number of positions being cut wasn't disclosed. They are planning to expand the DMPED office space in the Wilson Building, but will also be renewing the lease on the AWC offices at 1100 New Jersey Ave. for additional space. (They are working to break the lease for the old NCRC office space on M Street.) Accenture is being paid $320,000 for three months to help with the transition (which got some questioning from Kwame Brown as to why a local firm couldn't have been hired for the job). No documents on the reorganization were given to the committee before the hearing, which Brown wasn't too thrilled about, but Albert says that the new organization chart will be ready by August.
And, as much as I tried to close my ears to any non-Near Southeast discussions, I did hear that the city is not planning to sign the Memorandum of Understanding that the AWC had negotiated with the Southwest Waterfront redevelopment team, because the city's lawyers were concerned about possible exposure (which wasn't elaborated on). Albert said that they feel that an agreement can be reached that covers everything in the MOU without actually having an MOU.
There were also conversations about the management of the marinas, which baffled me until I realized everyone was saying "live-aboards" and not "liverboards."
You can catch a rebroadcast of the hearing on Saturday at 12:30 pm on either DC Cable 13 or via streaming video. If you subscribe to the Washington Business Journal, today's print edition had a short pre-hearing piece on the transition plans.
There will be additional oversight hearings in September and October, and Kwame Brown indicated that he plans to have additional hearings on every development project now in the DMPED portfolio, to make sure that the public is kept abreast of the plans and the timelines.
 

A press release just in over the transom is announcing that Forest City has hired CB Richard Ellis to handle the leasing of what's being called 401 M Street, the office building to be built on the southeast corner of 4th and M just east of the US Department of Transporation HQ. This is "Parcel D" on my Yards First Phase page, and is the building that will have a grocery store on the first floor in addition to the 300,000 sq ft of office space. Construction is scheduled to start next year, with delivery in spring 2010. (There's also an ad announcing this in today's print edition of the Washington Business Journal.)
 

They're not really that exciting to look at, but I now have a few photos from yesterday evening showing that the ground floor of the Onyx on First condo project has sprouted. (Its sibling 100 M Street, coming out of the same hole, is on a slower schedule, it appears.)
And with the Douglass Bridge viaduct now gone, I've started making some additions and deletions to my Stadium Exterior Construction Gallery to change out the photos I had been taking from up on the viaduct and replacing them with some new angles. And there will probably be more changes to come, especially with the western parking garage at South Capitol and N now clearly visible. If you scroll through the stadium page, you'll be rewarded about halfway down with a photo showing the first panes of glass installed on the southwest side of the ballpark. And I'll be doing my usual photo update on Sunday for the other three sides of stadium.
More posts: Onyx, Nationals Park